HomeMy WebLinkAbout05/02/1995, 5 - PARKS AND RECREATION DEPARTMENT OFFICE BUILDING SPECIFICATION NO. 94-13B Q�VIIIIMI�I ull� MEIN DA
city OF san GUIs OBIspO
Ilia; COUNCIL AGENDA REPORT Nu .�
FROM: Michael D. McCluskey, Public Works Directoi!`:--"'&
'(
Paul LeSage, Parks and Recreation Director
PREPARED BY: David Elliott, Administrative Ana%OiBuilding
E T: Parks and Recreation DepartmentSUBJ C apart
Specification No. 94-13B
CAO RECOMMENDATIONS
By motion,
1) award a construction contract in the amount of $511,564 to Carroll Building Company of San
Luis Obispo for "Parks and Recreation Department Office Building, Specification No. 94-13B"
2) accept subtractive bid alternates 1, 2, and 3, which will reduce the base bid by $63,578
3) accept additive bid alternate 7, which will increase the base bid by $6,542
4) appropriate an additional $53,000 from the general fund unappropriated balance to the project
account.
DISCUSSION
On February 28, 1995 the Council approved plans and specifications for the new Parks and Recreation
Department Office Building and authorized staff to advertise for bids on a construction contract. Public
Works opened bids on April 12, 1995, and Carroll Building Company of San Luis Obispo submitted
the low base bid of $568,600. This base bid appears reasonable and appropriate according to the
following information:
Number of Bidders: 6
Next Low Base Bid: $595,000 •
High Base Bid: $667,468
Mean of Base Bids: $621,082
Median of Base Bids: $618,214
The bid documents incorporated the following seven bid alternates for the City to eliminate or add
specified work at its discretion:
Alternate 1 - eliminate the kiosk (-$18,536)
Alternate 2 - eliminate the walkway cover (-$32,047)
Alternate 3 - eliminate the premium roof shingles (-$12,995)
Alternate 4 - eliminate the restroom tile (-$3,658)
Alternate 5 - eliminate the skylights (-$1,000)
Alternate 6 - eliminate the exterior benches (-$700)
Alternate 7 - add a fiberoptic cable conduit (+$6,542)
��► ►��i�IIIIIII�I� ��lll MY Of San ..AIS OBIspo
memo COUNCIL AGENDA REPORT
Parks and Recreation Department Office Building
Specification No. 94-13B
Page 2
Staff recommends accepting subtractive alternates 1, 2, and 3 to reduce the base bid by $63,578 and
bring the contract cost closer to the amount currently budgeted. Staff also recommends accepting
additive alternate 7 to provide for a segment of the City's fiberoptic cable network extension to the new
fire station. This additional work will cost $6,542, but that amount will be much less than the cost of
installing conduit in the street or on this property in the future after site improvements are completed.
Staff recommends not accepting subtractive alternates 4, 5, and 6. Tile in the restroom will be much
easier to maintain and will last much longer than sheet flooring and reinforced plastic wall panels.
Skylights will lessen the'demand for interior ambient lighting and reduce energy costs. And exterior
benches will be a low-cost, attractive amenity to the site improvements.
FISCAL IMPACT:
A $511,564 construction contract will require an additional $53,000 appropriation to the project budget
as shown in the table below:
Current Required
Project Project
Budget Budget
Building and Site Construction Costs $461,900 $511,600
Furnishings Costs 60,000 60,000
Professional Services Costs:
Appraisal Services 2,000 27000
Geotechnical Services 1,700 1,700
Architectural Services 36,800 36,800
Contingencies (5 percent) 29,600 309900
PG&E Rebate ( 2.0001 ( 2.0001
Total Cost $590,000 $643,000
ATTACHMENTS: Agreement
Bid Summary
i
CITY OF SAN LUIS OBISPO
CALIFORNIA
AGREEMENT
THIS AGREEMENT, made on this day of , 19_, by and between the City of San Luis
Obispo,San Luis Obispo County, California, hereinafter called the Owner, and Carroll Building Company.
hereinafter called the Contractor.
WITNESSETH:
That the Owner and the Contractor for the consideration stated herein agree as follows:
ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall
provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and
transportation services required to complete all the work of construction of
New Parks and Recreation Department Office Building Specification No 94-13B
in strict accordance with the plans and specifications therefor, including any and all Addenda, adopted by the
Owner, in strict compliance with the Contract Documents hereinafter enumerated.
It is agreed that said labor,materials,tools,equipment,and services shall be furnished and said work performed
and completed under the direction and supervision and subject to the approval of the Owner or its authorized
representatives.
ARTICLE ll, CONTRACT PRICE: The owner shall pay the Contractor as full consideration for the faithful
performance of this Contract,subject to any additions or deductions as provided in the Contract Documents,the
contract prices as follows:
pproximate Unit
F7A
Quantity Item with Unit Price Written in Words Price Total
1. 1 Construct new Parks and Recreation $568,600.00 $568,600.00
Department office building for the lump sum
price of five hundred sixty-eight thousand six
hundred dollars and no cents.
2. 1 Alternate #1, deduct the construction of the $18,536.00 $18,536.00
kiosk for the lump sum price of eighteen
thousand five hundred thirty-six dollars and no
cents.
3. 1 Alternate #2, deduct the construction of the $32,047.00 $32,047.00
walkway cover for the lump sum price of thirty-
two thousand forty-seven dollars and no cents.
4. 1 Alternate #3, deduct the premium roof shingles $12,995.00 $12,995.00
for the lump sum price of twelve thousand nine
hundred ninety-five dollars and no cents.
5. 1 Alternate #7, add a fiberoptic cable conduit for $6,542.00 $6,542.00
the lump sum price of six thousand five hundred
forty-two dollars and no cents.
TOTAL: $511,564.00
1 S-3
Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the
documents made a part of this Contract:
Should any dispute arise respecting the true value of any work omitted, or of any extra work which the
Contractor may be required to do, or respecting the size of any payment to the Contractor, during the
performance of this Contract, said dispute shall be decided by the Owner and its decision shall be final, and
conclusive.
ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following
documents, all of which are as fully a part thereof as if herein set out in full, if not attached, as if hereto
attached-
1. Notice to Contractors and information for bidders.
2. Contract General Conditions and Technical Specifications.
3. Accepted Proposal.
4. Public Contract code Section 10285.1 Statement and 10162 Questionnaire.
5. Noncollusion Declaration.
6. Plans.
7. List of Subcontractors.
8. Agreement and Bonds.
9. Insurance Requirements and Forms.
ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict
between the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall
control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting
herewith.
IN WITNESS WHEREOF,the parties to these presents have hereunto set their hands this year and date first
above written.
By:
CITY OF SAN LUIS OBISPO
Date:
Mayor Allen Settle
ATTEST:
Diane Gladwell, City Clerk
2 J ��
44 U
0 p° 8O ao
7 YO7 O% No 0000
41 'v; o ez N
o+
ro
a
O0 o g tn
N N r+ 8
en N 7 of N
'i
-1i
W
U 2 O+ V1
.� -W ^ p Itt
Cla W H
cn W
rl O
V
� C F
00 en
O 1 i = o0
-» v rn n v
z toa Q
a
O a) 0
.rq In
eqV en tn
ak
$ 25 $ %n
V 00
_4
U a1 m
C. U a,
a5 m
3 n =
a3 �
� t r: _
4-) Q 3 Q ccnq N N N N
.i
N x .52e
a) $4
a
Q
a Z5 25 o
Y
(� N
R
en a,8 QQQQ Q
\DO C Ok G 7
a00 %n 00 r: cr r` C:
V1 VY %n \0 1O 1Oto
V
N
M
tn W Q
a+ o0
00 o o y�j U O
V y�y �y F �. U
p p �N � m W
m lug vi w
a C m > s
a U cc 0A Zvi xA ern ZF `o
LT.