Loading...
HomeMy WebLinkAbout08/15/1995, C-1 - MATERIAL REMOVAL: PREFUMO ARM OF LAGUNA LAKE, SPECIFICATION NO. 95-14. ����Illl� l�lllll�lllllluulll MEETING DATE: 9� city or san tins oBIspo COUNCIL AGENDA REPORT ITEM NUMB—/ FROM: Michael D. McCluskey, Public Works Direc '�p, Prepared by: Barbara Lynch, Civil Enginee (+�� SUBJECT: Material Removal: Prefumo Arm of Laguna Lake, Specification No. 95-14. CAO RECOMMENDATION: By motion, 1) Approve specifications for "Material Removal: Prefumo Arm of Laguna Lake, Specification No. 95-14", 2) Authorize staff to advertise for bids, and 3) Authorize the CAO to award the contract if the lowest responsible bid is within the budget. DISCUSSION: The Prefumo Arm of Laguna Lake is the settling point for large quantities of silt carried down Prefumo Creek by storm waters. The material must be removed from the arm periodically to prevent clogging of adjacent storm drainage structures and to prevent flooding of streets and homes. The area was most recently dredged in 1990. In 1992, a biological survey of Laguna Lake, including the Prefumo Arm, was completed. The survey concluded that if work occurred during the dry months and dredging work did not remove the willows along the top of the slope, the work could be completed without damaging the area as a habitat for wildlife. In addition to these conditions, the Army Corps of Engineers is requiring the monitoring for three years by a biologist/botanist to assure the re-establishment of native plants. CONCURRENCES: The City has obtained a Fish and Game Agreement and Department of the Army Permit for the work. The California Regional Water Quality Control Board has issued a waiver for the project. The Community Development Department has given this project a categorical exemption. FISCAL IMPACT: The budget for the Laguna Lake sediment removal for the Prefumo Creek Inlet is $190,000 (page E-7 of the '95297 Financial Plan and pages 74-75 of Appendix B to the '95297 Financial Plan). The engineer's estimate for this project is currently $100,000. The estimate for the work will be refined just prior to bidding based on actual cross sections in the channel. The City will be requesting reimbursement from the County Zone 9 funds. ATTACHMENT: Project Location Map Plans and Specifications are available in the Council office for review. 90MM14adv r LEGEND / \ Project Limits Existing Willow Trees 7 ^L L Urn• 2!• n t R I t 27' •1. J JJ3 ter. i JU ... . _ . ••.: ,r T 381 / ' rtirw / TR Ma - IaV• ' • ♦ i TA .M a \ C1 Y R A r\ ��,�� OI.T A tee. +,\�• �y�� f 1+ Ir+ MATERIAL REMOVAL: PREFUMO ARM PROJECT LOCATION MAP Specification No. 95- 14