HomeMy WebLinkAbout10/07/1997, 7 - WINTER PREPARATIONS-WASTEWATER TREATMENT PLANT council acEnba CITY OF SAN LU IS OB ISP O CITY HALL, 990 PALM STREET Tuesday, October 7, 1997 7:00 P.M. - CITY HALL, 990 PALM STREET ADDED BUSINESS ITEM: 7. WINTER PREPARATIONS -WASTEWATER TREATMENT PLANT (McCLUSKEY/521 - 20 min.) - ==�DiscussigoikAR season (Agenda report will be available sometime on Monday, October 6, 1997.) N_ � AGENDA _ ING DATE -10-7-?7' ITEM #= Water Reclamation Facility — Preparation for Winter 97-98 What's Happened to Date for all Projects? March 10th 1995 Flood damage occurred. Clean-up begins on March 11 th. April received report from Corps of Engineers recommending course of action to repair damage. Questioned our use of materials asking for least damaging alternative. May-plans were begun to repair damage. A biologist was hired to report on plants and species. July 1995-Applications made to Corps of Engineers and State Fish and Game and Water Quality Control Board. ... August-received Fish and Game permit. Bids received in September 11995 14 •=�� -- -Octobe��995 corps=of£rtginel�+d:to�s �ei�ntts�-R. . � -- - — ..��.--,� - In December met-with-Corpsreq..uired. entire:watershed:studied.•-.,.. . Negotiated and in AprU1996the_Corps.-allowedms to.break-Ahe..,proTect-into.-two.parts.- First part- to cover areas.damaged�in-•1995: RFP for phase.1 and 2 negotiated with Corps and RWQCB and finally brought to CC in.August 1996. D.ecember..:1996 CC authorize&CAO:to,award a.contractfor,Phase;1::.::- January 1,997 CAO awarded•contract-fortphase°11- �- May 6 Questa.Engineering.reported�,phase:one.resultsxo:CC.:x May CAO approved amendment.to.contract..to,allow Engineer-to.designrphase:l-,.piojectsr.. . July 1997 engineer•.submitted.applications-to CorpssoEEngineer°.for-perm ts:and.to:CDD.'for Environmental.clearance_::,•..-- CDD issued mitigated negative-declaration:.Advertised,tlie;same:.,Clerk advertised<public hearing on MND set hearing-for'Sept'2. August I Ith.Steelhead.fish-,labeled.an endangered species::by.National,Maritirne-Fi§hi ries..,:.- August 15th Corps_ofEngineer.advertised:the_intentto-+issue a,�perm t;Alltagencieshave6O days- to comment except Fish and Wildlife and National Maritime Fisheries which have 130 days. EPA requested an extension to the 130 response time. October 6th Corps of Engineers has received comments from ECOSLO and others but no comments from EPA;National Maritime Fisheries nor Fish and Wildlife. What are our plans for trying to protect the WRF during this winter season? Work with the Army Corp for pre-approved "emergency"permitting of erosion control measures. Would allow a permit within 24 hours to be issued if Corp agreed that the emergency does in fact exist. Pre-purchase large diameter boulders. Stockpile at the Corporation Yard as well as place at strategic locations on the bank along the WRF. With any further erosion, boulders would roll down bank and provide some protection immediately. Then,with emergency declaration, additional rock could be placed to strengthen protection. What else can be done that does not encroach into the creek itsee. Contract with a design engineer for design of"sheet-pile"installation at-top.of--bank; obtain:- - estimatesfor it 9WIati6ri3W&03Qi oi•t�es_{o ire c le<sbr rc 'ae riIhm e = granting an exception to the Finance Management Manual for procurement of design services. Obtain City Council approval for installation of sheet pile project. LcaAproject wrf ' zy ' QUNCIL O CDD DC Funk River ConuCtants�AO O FIN DIR VbCA0 ❑fIRE 51M HIEF v/TTORNEY PW DPlanning Environmental S tudies • Mediation I6dCLERKIORIO E03 POLC O r i Da?" o, $DIR MEETING AGENDA DATE lo-7-9 7 ITEM # 7 October,7, 1997 Allen Settle,Mayor City of San Luis Obispo 0 C T - 7 1997 City Hall LL San Luis Obispo, CA 9340101 OE eRK SUBJECT: Creek bank stabilization LOCATION: San Luis Creek, near sewer plant Dear Mr. Settle: I rcad the Telegram-Tribune article about your problems with San Luis Creek this morning. There arc ways to protect creek banks in a sensitive manner. I've attached some photographs of creek repair projects that leave the creeks looking natural and more stable. The measures are proven and are being used throughout the United States. They can work in San Luis Obispo too. i:'you would like to discuss these ideas further, please feel free to call me. Sincerely, Don d J. Funk 1606 Valley View Ln. • P.O. Box 6291, Los Osos, CA 93412 (805) 528-0632 • FAX (805) 528-2423 • email: RIVERFUNK@aol.com Y � L , "'tea f. I ` lv.v - ~+�y irl��� ?riJS -+) ��... !IL. �M�'i"' ✓ .• � , r �.J Y. d y 'F � �.r s•''i z.1�.'4. ! M 4 'tjR9'' J� .T....A+ q '�.TjFy ,1v • i -A rz •o� ! T i�'� •fj7�'1• t C- 1 y i I - .l 1 ; G +yt f t r_ r µ4 .• J. •j .�/ 2 41 C t' 1 L 11 I( 1 1 •i f �� ' f N r ! �, :-ter I � 4},�r �� .,;r T 1� •, � a--L a� �y"x i � � .r � j � � �g• t - �> > tiy���l i•. + ,.a } 14�r � Fr { 4 �rr-. j+t�. j• i4 ' ,. � ' +' 'A itf'•G! :viii 4 l+t off r ! < S <fr .r (a.� 4-' r-1� ^i� �' JT •1 t J � _F - •r •y ,.`�• 'r'Y f' �` 1St r+.t _ , •!d) a+ r 1• S �t • �".••f7T ,V rt''�+ ~:- ..,,.,.ec _ - cs.^..�y...�� _` ♦.�'{fid n� a: 3 ���N��15 r�-y^'SCrV Yom: � r :r4�Lr {����i v - 1 .ii' •:1t\i��'x��� �' I C Y 'J rr- \r�• r!�-e� xc may[ . r. .- •e - y , ♦ � -rd •rte < ♦ -) 1 < . + a _�s • � _ .• J•�:Y ��ti '£�"`+-_ ��ti..'T.4����.�l I�I�,. �y��..' � f a.0 r _ --7 as r._�.aa.C. QST. "'] '� �.e r^• y � • -t -..r .` + J - MQ I �t a-'�N ..�-� L- 4 -. 7 "� _� -r��� dam"-1r�-ZL:.rYti•Z�-13 ..;.�t1,az�+,'t.y 7Im. r�l� � �\..+-.�"` -+-JT^�`.s7yv42 � ��r-� � c 1�4v';•.� 1yT,�•.w�,. fr .• �_�I'Y�` .� . .Y:,.'�+yy�sGTh� �� .r•,}�v��f�TP.,II-��y r•,.1 ^, , F ✓ c :i x�v^�. J;. ^Y r"a+k•+ti..'.;al�~t.1 "?� + f � 4� � `S„ ! \f •° ^ � _ - �L.rl Y..� +rte.-..l Sr ,a��1. .-... t�i ) +l",ti�L SI � �.�,�9 .\6_' 401 = �Sr`*r r!J f r l r 1.t�. "1`.yV3wr^•?r1 �y., r �-�i• i V uL„'15 },L��-{a L + ''�r.!/. S "!� J 't ti .j ,..r;:si� •r ".e' '�..••y.r�. n v'^.'4-y '411w t r " rral J i ''!t .c t. .. ate. .t.�+•- P •/ tv F .+;' •r 'r v�� � >✓' ,1 �{-�q�F! � f"-ry:.y� � �_ aJ��•�4r -.—.�� '�t�'` �'. TlIY�J�f/ r, .�.+�-. �.�L Jr'k�;! ...�rLV J (,- ��.. `y'r � f'y-""" `'. Jl I , S:, lY• ,� 3� ti's+'.,.Mi:-t3{I�'+��� f �L.l Kr 7\y Y('h r�J r � 7+ ��� �+�+•�+. .y :+ .::+�w�J� � �°�'4� '+r��'�'�i�f�ti 1 + �• '� j!s �� •f.'fl 7y ' ,. ' Y .•1. 't' •. frc ice_ rrve' ,cy � � '� 'n� F r o et2v�c,aren ak 'su es F mor k►ol o rv ���srtdwes�arty� ve� rest4� i' ' 1 1 1 i 1 • 1 f • n 1 ��J ✓ _ fir._ �+ f�,''.h..r '�'Y � • `ms's "' ~� �� 'S`"�y�•'•�'" r-r_.- -.,- .� -':•u�: :,:.�z,^ :'.F:- '. _, a-F, "-sem :ir, • • - • • • • • r - 3• * SG r''tr.wi� • ••• I � h r ..ry ir - ""`^✓•rte" "� �,� r �. ` + .Lc'4� T }}� - +_ .rte ;-r %�„ T rL• y -_! _ ^ __ n•r'�v,„ - � �.' <.�� y yC }� �,F£} .t r, `ria .. r� �� J. X f � � k �� � ter i; e- I �.r z-r��r� F fl is � r ����er�:�.�1�1 �}}iw� d'�H,' �Y �� � � s [tl�ry '�� .her J� ��.. ��i �'4��� y-.>' �Tq +'if r� 1 ' �[I� y � 1 c � f sr f�'1�^$yr,fr �� -.. ' a E 1.'�,$J;:. �� a y he ..xs '+�rrl:,�' ° ._` 1 + � L" `5���R�N��c�yl r �r ���s �t � .r<u � h � �4 �Ys fr,�`f`f'r r � , � �� a: fit rI.- r r �rkq 'y rR 4r �4 ", rid .r c,,.� �I °� f s.r� �.rsvti ',� y"� � .. y.:.'-F�.= !'v�r�!,<yy., -4�'�.-�, rai����iSGt"'s�u'U w Tr9 r ,t r t � 5' s � n AF s � '� �� r �- t #r.Y w C � � kyr.x .7 t x ♦ rN F S .. ^� y _ ~ a i.. .� 'v� ii .'4 :.:.:�., l "ti �y W.,. ._Z�te' ��r�ia��.y. - � s r� I � %s= .t,� ' �.r 1 e � �� I lc�fr e � s1 ri l ( 1. yV; Frt µ.'�_� � I 1 .l�Nr • t � II lR,� �.��I 1� �4, �v �� �� a .EEE PPP S y y��.� ,� �� � i t Lf .sad� S ..S T'Yy�`dr�•���,��'-r is _Z.vt" �" Y � _ C r `yytH� _ .fy ^' T };„ �_F [�.\ � fes... f C _ - f V �� 'Lc y��' _ �t 1 ` �_� a,.'-�`�`l�� Rte,{.�. _ �� —i rF �w��-r��"'-'}�+1"t��"'G 3�^ N ��G 1.f .: � *vY ry+ ��r�w�Tlatr� s i'. �.y, �t rf � � t ,,y "�^ ��fla .i Era t ��,, n7�^�Eas r .,:. _ �. i _ .tF � '> ._`%�G` .`"Ti,.vT IK r -"n 4 r L r"'5�..r� j,n /�'4r��i`K Ib_ _F "r..L...- - ^T_, .ar,,_ _ x S,iy�.r� n3� 9q'a� r{.�,. E r f�j �� rel�y - - "�'� -����� �nt»I +. r a i ��. is MT rigy sa rrr�ri �. iii}�� � �.1pf+. � � "r., x �$� rr ��ri� s ,�.:?� r; a.: '' d''+ ,,. 7 i 8 "yt� -:` `�'Y s+1� t c x"r..:.n t n ,��-"`-�ra, a.rd w rti s �.:� k7rf S ,�'rU'ht t w�,�'r '�i aai!r�r � ' r -c. h : .� -� � ,. i, �., 'a r � s -v+i..�. r y �"'� T"'rFe Y.arN +cry A C yLA F-y�t�,, y �� ZF�r4. !I �S'pY 5" 1 P�yw@ Y ��-P'r-•T�i yam,�_. ��✓ �wu-..�•""..`�,.t" �'Y k�.�i 4 �� � 'a / � �1•y�..��'�T¢aty �.'}�r/,�,.+bi�t�,q .N xt 'i.y�: f .+cam " L`_+ V MEETING AGENDA DATE�T ITEM #-� MEMORANDUM October 2, 1997 TO: City Council FROM: Mayor Allen Settle SUBJECT: Urgency Item: Protecting the Water Reclamation Plant from Storm Drainage Due to the severe erosion to San Luis Obispo Creek in the vicinity of the Water Reclamation Plant during the storms of 1994-95, there is a high likelihood that the Water Reclamation Plant itself will be damaged by the winter rains, unless a contingency plan to protect the plant is developed immediately. Because of this, I have placed this item on the City Council agenda for October 7'so that the matter can be discussed by the Council and staff so that the Council can provide direction and the staff take actions to the end that potential plant damage is prevented or minimized. This is in accordance with the procedures set forth in Council Policy and Procedures, Section 1.2.1. cc: City Administrative Officer City Attorney City Clerk Director of Public Works Director of Utilities E Lj 'DIR_❑f�}iE CHIEF Y W DIRRIG O POLICE CHM 0 DIR TI R u i councit AQenaa CITY OF SAN LUIS OBISPO CITY HALL, 990 PALM STREET uesday, October 7, 19 7 7: P.M. - Cl PALM STREET ADDED BUSINESS ITEM: 7. WINTER PREPARATIONS -WASTEWATER TREATMENT PLANT (McCLUSKEY/521 - 20 min.) Discussion of efforts to protect the Wastewater Treatment Plant during Winter 1997-98 season. (Agenda report will be available sometime on Monday, October 6, 1997.) AGEND DATE INo=TEM #A Water Reclamation Facility — Preparation for Winter 97-98 What's Happened to Date for all Projects? March 10th 1995 Flood damage occurred. Clean-up begins on March 11th. April received report from Corps of Engineers recommending course of action to repair damage. Questioned our use of materials asking for least damaging alternative. May- plans were begun to repair damage. A biologist was hired to report on plants and species. July 1995-Applications made to Corps of Engineers and State Fish and Game and Water Quality Control Board. August-received Fish and Game permit. Bids received in September 1995 October 1995 Corps of Engineers Declined to issue permits. Requested that city comply with regular permit process. We needed to prove what was the least damaging alternative. In December met with Corps required entire water shed studied. Negotiated and in April 1996 the Corps allowed us to break the project into two parts. First part to cover areas damaged in 1995. RFP for phase I and 2 negotiated with Corps and RWQCB and finally brought to CC in August 1996. December 1996 CC authorized CAO to award a contract for Phase 1 January 1997 CAO awarded contract for phase 1 May 6 Questa Engineering reported phase one results to CC. May CAO approved amendment to contract to allow Engineer to design phase 1 projects. July 1997 engineer submitted applications to Corps of Engineer for permits and to CDD for Environmental clearance.. CDD issued mitigated negative declaration. Advertised the same. Clerk advertised public hearing on MND set hearing for Sept 2. August I lth Steelhead fish labeled an endangered species by National Maritime Fisheries. August 15th Corps of Engineer advertised the intent to issue a permit. All agencies have 30 days r-� to continent except Fish and Wildlife and National Maritime Fisheries which have 130 days. EPA requested an extension to the 130 response time. October 6th Corps of Engineers has received comments from ECOSLO and others but no comments from EPA; National Maritime Fisheries nor Fish and Wildlife. What are our plans for trying to protect the RTF during this winter season? Work with the Army Corp for pre-approved "emergency"permitting of erosion control measures. Would allow a permit within 24 hours to be issued if Corp agreed that the emergency does in fact exist. Pre-purchase large diameter boulders. Stockpile at the Corporation Yard as well as place at strategic locations on the bank along the WRF. With any further erosion, boulders would roll down bank and provide some protection immediately. Then, with emergency declaration, additional rock could be placed to strengthen protection. What else can be done that does not encroach into the creek itse? Contract with a design engineer for design of"sheet-pile" installation at top of bank; obtain estimates for installation work. In order to hire a sole-source design engineer will require granting an exception to the Finance Management Manual for procurement of design services. Obtain City Council approval for installation of sheet pile project. Lcarlproject wrf �Z MEETING AGENDA DATE 10ITEM #L� MEMORANDUM October 2, 1997 TO: City Council FROM: Mayor Allen Settle 4e��� SUBJECT: Urgency Item: Protecting the Water Reclamation Plant from Storm Drainage Due to the severe erosion to San Luis Obispo Creek in the vicinity of the Water Reclamation Plant during the storms of 1994-95, there is a high likelihood that the Water Reclamation Plant itself will be damaged by the winter rains,unless a contingency plan to protect the plant is developed immediately. Because of this, I have placed this item on the City Council agenda for October 7'b so that the matter can be discussed by the Council and staff so that the Council can provide direction and the staff take actions to the end that potential plant damage is prevented or minimised. This is in accordance with the procedures set forth in Council Policy and Procedures, Section 1.2.1. cc: City Administrative Officer City Attorney City Clerk Director of Public Works Director of Utilities Eff IR�IN� IR- 0 f�tECHIEF W DIR❑ POLICE CH4 DIR u T R &UNCIL occoDIR Tunk River Consufltants FlaAAO0 FIN DIR O ;PRE CHIEF AT PW DIR Planning • Environmental Studies • Mediation ;CLER: RIG O POLICE CHF O MQPT TEAM C3DIR ar RIA DIR O O PERS OIR MEETING AGENDA DATE iD-7--f 7 ITEM # October,7, 1997 R�C�t1l,ED. Allen Settle,Mayor City of San Luis Obispo 0 C T _ 7 1997 City Hall San Luis Obispo, CA 93401 SLO O�TY CLERK SUBJECT: Creek bank stabilization LOCATION: San Luis Creek, near sewer plant Dear Mr. Settle: I read the Telegram-Tribune article about your problems with San Luis Creek this morning. There are ways to protect creek banks in a sensitive manner. I've attached some photographs of creek repair projects that leave the creeks looking natural and more stable. The measures are proven and are being used throughout the United States. They can work in San Luis Obispo too. If you would like to discuss these ideas further, please feel free to call me. Sincerely, Don2d J. Funk 1606 Valley View Ln. • P.O. Box 6291, Los Osos, CA 93412 (805) 528-0632 • FAX (805) 528-2423 • email: RIVERFUNK@aol.com p .. ll Ic dIM All .� • —1 + s. N. _ :%•i. +rte_.-" ,.,�'1�/1's +a~(I� � .,S •'_ x- - � t r _ k - �J „� .tit `� �,,,y � ' • � + !.� - r'•�-- — �yam" �`� 4•�^rG� � � ' , ;ice _ Tom_ w � ��� �-'�a!_� 1L''�� 4' 7 �• � 'Ya r .1 so .-� -•`—fes Li �'J /'t - -�•,,_ Yom- - ,ti. s en�u� r�menta�lstudi esu, ;mor holo, a,sat dies-and river—restarta 10GA Creek Remediation and Stabbation Project Alt, '114 41 Example o[creek bank stabilization project using rock rip'rup. Left top photo was taken byArmy Corps after bank erosion. Right top photo shows proposed rock revetment osdesigned byFunk River Consultants. Photo ioleft shows project uxi\ will appear after proposed natural planting . on IL '^ Photo below shows a creek that has been stabilized with [he use of"V weirs. side channel weirs and rootwads located on the banks, lig � | ' Photo above shows ustabilized creek rock weirs, j . ,.. This photo below is an example of poor site planning. Y t i3p — W This photo indicates bank erosioff caused by removal of vegetation E� K and an entrenched channel. '`r The photo to the left shoe's the construction of a rock "x weir in a meander turn. The yli; t use of rock weirs can arrest f both bank and bed erosion and enhances the formation of pools. a N �x t� '1L :rr �.�w" � .Ceti,•t"M,t'�,„ : _L Y � ,y a R r� The photo to the right illustrates y� ' r« the placement of rootwads, . , willows and sod on an eroded bank to arrest erosion and stabilize the bank. ` I