Loading...
HomeMy WebLinkAbout05/18/1999, C8 - OPERATIONAL IMPROVEMENTS TO ROUTE 227 (SOUTH STREET) BETWEEN HIGUERA AND BEEBEE STREETS. council May 18.1999 j acenoa uepont C8�` " CITY OF SAN LUIS OBISPO FROM: Mike McCluskey,Director of Public Wor Prepared By: Terry Sanville,Principal Transportation Planner SUBJECT: OPERATIONAL IMPROVEMENTS TO ROUTE 227 (SOUTH STREET)BETWEEN HIGUERA AND BEEBEE STREETS. CAO RECOMMENDATION Authorize the CAO to execute a cooperative agreement with CalTrans to provide funding assistance to widen the segment of South Street (State Route 227) with the amount not to exceed$50,000. DISCUSSION CalTrans District 5 wants to pursue state funding (Minor "A" Program) to make operational changes to the segment of Route 227(South Street)between Higuera and Beebee Streets. Caltrans estimates the total project cost will be $180,000 and is requesting that the City contribute$50,000 toward the construction of the new curb,gutter and sidewalk(about 28%of the total project cost). This project would be designed by CalTrans staff and constructed under their supervision. CalTrans has indicated that construction would be programmed for Fiscal Year 2001-2002,which is the third year of the City's upcoming Capital Improvement Program(CIP). Staff believes that financial participation is warranted because it will complete pedestrian and bicycle lane connections across this busy street segment and.improve local traffic flow, all which benefit local residents. Also, City financial participation may enable CalTrans to more easily secure Minor"A"funding. This project is described in the attached letter from Mr. Nevin Sams of CalTrans Traffic Department and is shown in preliminary form on the attached copy of CalTran's plan sheet. This project is consistent with the City's Circulation Element (which designates this section of South Street as an "Arterial" road), with pedestrian policies contained within the element , and with the Bicycle TransportationPlan. FISCAL IMPACT $50,000 would be the City's contribution. The City may decide to earmark$50,000 of its general sidewalk construction funds (draft CIP currently earmarks $100,000 for FY 2001-02). Other funding sources might also contribute such as the Minor Project Fund for bicycle and pedestrian improvements(draft CIP currently earmarks$60,000 for FY2001-02 using state grant funding). Or the City could appropriate$50,000 from its unappropriated fund balance that would be targeted for this particular project. C8-1 Council Agenda Report:-South StreO Improvements Pagel ALTERNATIVES The City Council could decide not to partrticipate in thisproject or.suggest participationto a.lesser degree. . ATTACHMENTS Apri1'21, 1999 Letter--from Mr;NevirnSains;Chief District 5 Traffic-Department,Caltrans Prelinunaryplan for South Street(Route 227)'improvements 1:1Everyone\CouncmgendaRepoitslSou&S V=W idenmg r i C&2 U, r•O' OJ UO.J{. 'zz vim'.' - STATE OF CALIFORNIA—BUSINESS,TRANSPORTATION AND HOUSING AGENCY GREY DAVIS,Governor DEPARTMENT OF TRANSPORTATION 50 Higuera Street San Lab Obispo,CA.93401-5415 Telephone: 805-549-3105 Date: April 2 1, 1999 File No.: 05-SLO-227-PM R12.9/R13.7 E_A.494100 Mike McCluskey Director of Public Works City of San Luis Obispo 955 Mono St San Luis Obispo, CA. 93401 Attention: Jim Hanson Terry Sanville This memo is regarding a proposed traffic operational improvement project on South St (Route 227)in the City of San Luis Obispo from the intersection of South Higuera St. to approximately 800 feet east of Beebe St. The post mile limits are from R12.9 to R13.7. This project will improve traMe lane geometries by eliminating the jog in the existing alignment for eastbound traffic. It will also provide left turn channeliration at Parker St. and Beebe St. Two way left turn channelizadon will interconnect the left turn channelizations. Minor widening will be necessary on the south side of South Street between Higuera and Parker St. to provide for 5 ft. bicycle lanes and 11 to 12 ft traffic lanes• Concrete sidewalks will be constructed on the south side of South Street which will enhance pedestrian safety. The preliminary estimated cost for this project is$180,000. $30,000 has been provided for right-of-way acquisition and relocation expenses. $30,000 has also been provided for necessary utility relocation and possible high pressure gas line relocation. It is proposed that the City of San Luis Obispo provide funding for new sidewalk, curb and gutter construction on the south side of South St. This cost is estimated to be $50,000. A cooperative agreement for this project will be necessary. Please advise urs at your earliest possible convenience as to the feasibility of our funding proposal. If you have any questions please feel free to call me in the District 05 Traffic Dept. at 549-3017 or Bob Nurur at 549-3106. Sincerely yours, — Nevin Sams, Chief District 5 Traffic Dept. RHN:rhn cc: Nevin Sams 8-3 C6 cc � + I cc II w u I m I BEEBEE N::BEEBEE m� I cc W ST. sam al sang ST. 1j99 ULn ¢N OAO W CC W W j I � LL WW I I e ~ IY H IH H Hy — U. P W Y2 u,lOOlo m : 0 � I I o LL y I In LL a I I I I I I I I I O o I a�w I I I 9 a J I I LL < IS o �vp I I I J W J? I I ' `"U I I PARKER 40 I a I ST. &q.b I I 4 - I II I II oic I II o I W �I m I I z 't �►4 1 W a in I I J J i W Y — &L 46 L6 m W LL WW I I d LL LL LL LL H � Y a LL IN O O O O - LL pl mJ I I N O I- - - NN N O It - � I I ' I I ' I I t I I I ------------1332!15 i iC8-4 d83no I H--------------. _ I I