Loading...
HomeMy WebLinkAbout06/15/1999, C3 - WATER AND SEWER IMPROVEMENT PROJECT: JOHNSON AVE. - ELLA TO SOUTHWOOD, ELLA STREET - JOHNSON TO FIXILINI, SPECIFICATION NO. 99220 council uun 15, 1999 j acEnaa nEpont CITY OF SAN LUIS O B I S P O FROM: Michael D. McCluskey,Public Works Directo Prepared by: Bridget Fraser,Engineering Assislant SUBJECT: Water and Sewer Improvement Project: Johnson Ave. -Ella to Southwood, Ella Street-Johnson to Fixilini,Specification No.99220 CAO RECOMMENDATION: 1. Approve plans and specifications for"Water and Sewer Improvement Project: Johnson Ave. -Ella to Southwood, Ella Street-Johnson to Fixilini, Specification No. 99220" 2. Authorize staff to advertise for bids. 3. Authorize the CAO to award the construction contract if the accepted bid plus contingencies is within the Engineer's Estimate. DISCUSSION: This project is part of the City's ongoing program to replace waterlines to ensure reliable service . and minimize maintenance and emergency repairs. The projects are prioritized based on maintenance history combined with other factors such as other work occurring in the area. This project includes the replacement of 1,930 meters of water main in Johnson Avenue. This 48 year old waterline has outlived its useful life requiring numerous repairs over the recent years. In addition, this project includes a new sewerline installed in Ella street between Johnson and Fixilini. This portion of the project will install a sewer main in Ella Street,where one currently does not exist Residents with frontage along Ella Street have laterals that go out into the street, then run down to Johnson Avenue. The current situation is undesirable because sewer laterals are owned by each property owner, and as private facilities, they do not get marked in response to calls to USA (Underground Service Alert). The new sewer main will tie in to a main in Johnson Avenue. Johnson Avenue will be resurfaced following the waterline project The sewer project on Ella will be completed with the waterline project to prevent the need to cut the new surface for installation of the sewer line at some later date. CONCURRENCES: Environmental review by the Community Development Department has resulted in this project receiving a categorical exemption. FISCAL IMPACT: The Johnson Ave. waterline project is identified in the 1997-98 Financial Plan, Appendix B, Page 55. The Ella Street sewerline is identified in the 1997-99 Financial Plan, Appendix B, page 68 as a `Future project" The sewerline improvement is being added to this project because a sewer main is needed in that block to eliminate private laterals running down the street and to avoid cutting into Johnson Avenue after it is resurfaced following the waterline project. �3-/ Council Agenda Report-Water and Sewer Distribution Project Page 2 Fund Water Sewer Total Construction Estimate: $727,540 $24,260 $751,800. Contingencies: 72,460 2,740 75,200 Total Engineer's Estimate: $8009000 27 000 $827000 Currently,there is $1,612,156 available in Water Distribution System Improvements and$868,063 available in the Wastewater Collections Systems Improvements to support these projects. At the time a contract is awarded, a Budget Amendment Request will be processed which will transfer the required funds from these accounts to the project account Attachment A: Project Location Map Plans and Specifications are available for review in the Council Office. FAGRouPsTwoxxMENGRN aancoc Pi0ect WWa\922o Jones WnVocurnmas\s-StaffRq)ortsWMO CAR Adv coozDoo C3-Z MEN- IN, ■■ �� ', a....�r �'a, A ,J w ►1t♦ n v. y R ^J ®- :,l;, •�`"� ��'• .CEJ ' +•' uu!IIIIIIIIIIIIIII'i', IIIIII!IIIIIII��� j • WATER & SEWER DISTRIBUTIONPROJECT JOHNSON AVE: ELLA TO . . . • : • • TO FIXILINI