HomeMy WebLinkAbout02/29/2000, C11 - UTILITY TRENCH REPAIR-SPECIFICATION NO. 90137 Council j aGEn6a RepoRt Ali C I T Y OF SAN LUIS O B 1 5 P 0 FROM: Michael D.McCluskey,Public Works Directorl�� Prepared By: Daniel Van Beveren,.Civil Engineer- -5 &Joseph E. McDermott, Streets Maintenance Supervisor SUBJECT: UTH=TRENCH REPAIR- SPECIFICATION NO. 90137 CAO RECOMMENDATION 1. Approve Specifications for Utility Trench Repair- Specification No. 90137. 2. Authorize staff to advertise for bids. 3. Authorize the CAO to award the contract to the lowest responsible bidder within the project budget of$90,338. 4. Authorize the consolidation of budget balances of two previous trench repair projects & remaining allocated general fund money into the current trench repair project budget for a current project balance of$140,160. DISCUSSION Throughout the course of the year, the Utility Department crews make repairs of the utility lines in City streets. At the time of these repairs,temporary asphalt patches are placed at the surface of the street above where the utility repair was made. Periodically, these temporary asphalt patches are replaced with a stronger & more permanent asphalt patch. Funded through a Water Distribution Capital Improvement Plan entitled: "Distribution System Improvements" (as shown in the 1999-01 Financial Plan, Appendix B, page 80), this trench repair project provides this permanent repair to be made to the street surface. In August 1999, Council approved the 1999-00 "Annual Utility Trench Repair". That project, which was the first phase of the 1999-00 project, has been completed with a total cost of $24,839. With a total annual budget of$165,000, a remaining balance of$140,161 still remains. Due to the number of temporary patches that remain to be permanently repaired, staff is seeking approval for the second phase of this annual project, in the.amount not to exceed$90,338. CONCURRENCES Community Development Department has given this project a categorical exemption. C11-1 Council Agenda Report=Utility Trench Repair,Specification No.90137 .Page 2 FISCAL IMPACT Estimated Construction Cost Engineer's Estimate $82,125 Contingencies (10%) $8,213 Total $90;338 Balance of Utility Trench.Repair Funds Available $140;160 Consolidation of Budget Balances Public Works is recommending that the following CIP budget balances,be consolidated into the current Utility Trench Repair project budget. 1997-98 Utility Trench.Repair $6,494 1998-99 Utility Ti-ench.Repair $2,.418 Portion of balance from Water.Distribution System $131,2_48 Improvement Account Total $140,160 ATTACHMENTS Specifications are available in the Council Office for.review. C11-2