j aGEn6a RepoRt Ali
C I T Y OF SAN LUIS O B 1 5 P 0
FROM: Michael D.McCluskey,Public Works Directorl��
Prepared By: Daniel Van Beveren,.Civil Engineer- -5
&Joseph E. McDermott, Streets Maintenance Supervisor
SUBJECT: UTH=TRENCH REPAIR- SPECIFICATION NO. 90137
CAO RECOMMENDATION
1. Approve Specifications for Utility Trench Repair- Specification No. 90137.
2. Authorize staff to advertise for bids.
3. Authorize the CAO to award the contract to the lowest responsible bidder within the project
budget of$90,338.
4. Authorize the consolidation of budget balances of two previous trench repair projects &
remaining allocated general fund money into the current trench repair project budget for a
current project balance of$140,160.
DISCUSSION
Throughout the course of the year, the Utility Department crews make repairs of the utility lines
in City streets. At the time of these repairs,temporary asphalt patches are placed at the surface of
the street above where the utility repair was made. Periodically, these temporary asphalt patches
are replaced with a stronger & more permanent asphalt patch. Funded through a Water
Distribution Capital Improvement Plan entitled: "Distribution System Improvements" (as shown
in the 1999-01 Financial Plan, Appendix B, page 80), this trench repair project provides this
permanent repair to be made to the street surface.
In August 1999, Council approved the 1999-00 "Annual Utility Trench Repair". That project,
which was the first phase of the 1999-00 project, has been completed with a total cost of
$24,839. With a total annual budget of$165,000, a remaining balance of$140,161 still remains.
Due to the number of temporary patches that remain to be permanently repaired, staff is seeking
approval for the second phase of this annual project, in the.amount not to exceed$90,338.
CONCURRENCES
Community Development Department has given this project a categorical exemption.
C11-1
Council Agenda Report=Utility Trench Repair,Specification No.90137
.Page 2
FISCAL IMPACT
Estimated Construction Cost
Engineer's Estimate $82,125
Contingencies (10%) $8,213
Total $90;338
Balance of Utility Trench.Repair Funds Available $140;160
Consolidation of Budget Balances
Public Works is recommending that the following CIP budget balances,be consolidated into the
current Utility Trench Repair project budget.
1997-98 Utility Trench.Repair $6,494
1998-99 Utility Ti-ench.Repair $2,.418
Portion of balance from Water.Distribution System $131,2_48
Improvement Account
Total $140,160
ATTACHMENTS
Specifications are available in the Council Office for.review.
C11-2