j acEnba uEpont C6
CITY OF SAN LUIS OBI.SPO
FROM: James M. Gardiner, Chief of Police J""6
Prepared By: Cliff Chelquist, Captain
SUBJECT: FUZING RANGE IMPROVEMENTS; SPECIFICATION NO. 90051
CAO RECOMMENDATION
1. Appropriate$18,600 from the unappropriated balance of the General Fund to the project
account.
2. Approve contract with Specialty Construction in the amount of$61,900 for a lead
recovery system at the police firing range, and authorize the Mayor to execute the
contract.
DISCUSSION
As part of the 1999-01 Financial Plan,the City Council approved$50,000 for construction of a
lead recovery system at the police firing range. The project was advertised and eight companies
obtained specifications. Two bids were returned, the low one being from Specialty Construction
for$61,900.
Staff recommends the approval of additional funding to complete the project as currently
designed, as being the most cost effective means to insure that a safe and environmentally
sensitive firearms training facility will be available to meet both current and future needs.
FISCAL IMPACT
Based on final bid amounts and the addition of conduit to allow for the movement of electrical
services,the total cost of the project will be$68,600. Both the prior approved amount of
$50,000 and the additional request of$18,600 will come from the general fund. Based on ending
results for the 1998-99 fiscal year and current revenue trends, adequate funds remain in the
General Fund balance to fund this request and retain the balance at policy levels.
Cost
Low quaUfled bid 61,900
Additional conduit to allow future target upgrades 700
Contingency 6,000
Final construction costs 68,600
Funding
Funding approved in 1999-01 budget from the general fund 50,000
Additional funds requested for conduit and contin enc 18,600
Necessary to conwkie the project 68,600
C6-1
Council Agenda Report=Firing Range Improvements
ALTERNATIVES
Reduce the scope of the project. This,alternative isnot reconimended:as is will reduce the
currently availabletraining area of the range. Under=building-the project would:also result in the
need to make additions to the range in the future at anticipated.higher costs.
ATTACHMENTS
1. Contract
2. Bid.Summary Sheet
3. Original Funding Request
C6-2 .
CITY OF SAN LUIS OBISPO
CALIFORNIA
AGREEMENT
THIS AGREEMENT,made on this day of 19_,by and between the City of San Luis Obispo,
San Luis Obispo County,California,hereinafter called the Owner,and Specialty Construction,hereinafter called the
Contractor.
WITNESSETH:
That the Owner and the Contractor for the considerationstated herein agree as follows:
ARTICLE 1,SCOPE OF WORK: The Contractor shall perform everything required to be performed,shall provide
and furnish all of the labor,materials,necessary tools,expendable equipment,and all utility and transportation services
required to complete all the work of construction of
Firing Range Improvements,Specification No.90051
in stria accordance with the plans and specificationstherefor,including any and all Addenda,adopted by the Owner,in
strictcompliancewith the Contract Documents hereinafterenumerated.
It is agreed that said labor,materials,tools,equipment,and services shall be furnished and said work performed and
completed under the direction and supervision and subject to the approval of the Owner or its authorized
representatives.
ARTICLE II, CONTRACT PRICE: The owner shall pay the Contractor as full consideration for the faithful
performance of this Contract, subject to any additions or deductions as provided in the Contract Documents,the
contract prices as follows:
Item Item Unit of Estimated Item price Total
No. Measure Quantity (in figures) (in figures)
1. Bullet Containment System LS 1 61900.00 $61,900.00
BID TOTAL: $ 61,900.00
Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the documents
made a part of this Contract
Should any dispute arise respecting thetrue value of any work omitted,or of any-extra work which the Contractor may
be required to do,or respecting the size of any payment to the Contractor,during the performance of this Contract,said
dispute shall be decided by the Owner and its decision shall be final,and conclusive.
ARTICLE III,COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents,
all of which are as fully a part thereof as if herein set out in firll,if not attached,as if hereto attached:
1. Notice to Contractors and information for bidders.
2. Contract General Conditions and Technical Specifications.
3. Accepted Proposal
4: Public Contract code Section 10285.1 Statement and 10162 Questionnaire.
5. NoncollusionDeclaratian.
C6-3
6. Plans.
7. List of Subcontractors.
S. Agreement and Bonds.
9. Insurance Requirements and Forms.
ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict
between the terms of this instrument and the bid or proposal of said Contractor,then this instrument shall control and
nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith.
IN WITNESS WHEREOF,the parties to these presents have hereunto set their hands this year and date first above
written.
CITY OF SAN LUIS OBISPO,
A Municipal Corporation
City Administrative Officer
APPROVED AS TO FORM: CONTRACTOR
Ci A ey Specialty Construction
-2-
C6-4
S0
o
w c c
o
O0 o a
F a.
F m
FE
o S
d d
M M
a
8
E U
z
0
S S
ry N y
°a 6.
� R1
a
z x
S o
0 0
z Q °
n
U
T
a E
S
cc
Q_
a S. z a
m d
ma
N N
O u
� O �
-
m
a
a
Q = z
Wrs
V d Q] Q
CO m
v a ca z ''6_5
9
1999-01 Financial Plan
CAPITAL IMPROVEMENT PLAN
PROGRAM: Administrative Services
REQUEST TITLE: Purchase Lead Recovery Target System for Police Range
Project Summary
Purchase a lead recovery system at an estimated cost of$50,000 that will allow the safe use of the Police Pistol
Range while stopping the introduction of lead into the environment.
Project Objectives
■ To provide a backstop of sufficient height to prevent bullets from leaving the range.
■ To provide a system to stop the introduction of lead into the environment.
■ To allow us to continue to use the range and thus negate the need to acquire expensive property for the
purpose of building a new range/training facility.
Project Focus
This project will maintain the existing pistol range as a safe training facility.
Existing Situation
In November of 1998,the work to stabilize the creek behind the pistol range was completed. The decisions on the
scope of this work were environmentally driven with the emphasis being to protect the habitat of the area While
this is commendable, the end result is that the earthen berm that forms the backstop against which weapons are
fired will soon deteriorate and be reduced to a height that can not be counted on to prevent bullets from leaving
the range.
In addition to the obvious safety issue of projectiles leaving the range, we have a longer term issue of lead
continuing to be introduced into the environment. Under current environmental requirements, the lead that is at
the range can be left where it is but there is some question how long that policy will remain.
Goal and Policy Links
This request should be approved as it addresses both an immediate and possibly a future public health and safety
issue.
Project Work Completed
Initial contact with contractors.
Environmental Review
Given that the range is in such proximity to a creek and that part of what we are trying to do is to deal with the
lead issue, I would anticipate the project will require some level of environmental review. As we are doing
nothing that directly impacts on the creek,we will be continuing an existing use of the facility and will be taking
steps to stop introducing lead into the environment,it is hoped that the review requirements will be minimal.
C6-6
Request Title Page 2 of 2
Project Phasing and Funding Sources
Pro'ect Costs by Type
Project Costs
To-Date 1999-00 2000-01 2001-02 2002-031 Total
E,giripment acquisition $0 $50,000 $0 $0 $0 $50,000
Total $0 $50,0001 Sol Sol $0 $50,000
Project Funding by Source
Funding of$50,000 will be from the general fund in the fiscal year 1999-00.
Implementation
Task Date
Site Review by Venders (to obtain an accurate cost estimate) July 1999
Request for Bids August 1999
Award Contract October 1999
Install system December 1999
Project Manager and Department Coordinator
■ Project manager To be assigned by Public Works,Engineering Division
■ Department coordinator Captain Cliff Chelquist
Public Art Policy
Not applicable. The area is not open to the public.
Alternatives
■ Continue the Status Quo. This alterative is not recommended as it will result in the loss of a safe area
for firearms training.
■ Change the scope of the project Rebuild the dirt berms. This alternative is not recommended as it
would be a stop-gap in nature and be an on-going expense.
Project Effect on the Operating Budget
The requesting department estimates 20 hours of staff resources to manage the project during implementation.
C6-7