AGREEMENT
206?by and between the City of San Luis Obispo ,THIS AGREEMENT,made on this' Lday o f
a municipal corporation and charter city, San Luis Ob . o
California (hereinafter called the Owner) an d
R . Burke Corporation (hereinafter called the Contract .
WITNESSETH :
That the Owner and the Contractor for the consideration stated herein agree as follows :
ARTICLE 1, SCOPE OF WORK :The Contractor shall perform everything required to be performed, shal l
provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility an d
transportation services required to complete all the work .of construction o f
STREET RECONSTRUCTION AND RESURFACING PROJECT, SUMMER 2004, SPEC NO .9040 7
in strict accordance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, i n
strict compliance with the Contract Documents hereinafter enumerated .
It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed an d
completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives .
ARTICLE H, CONTRACT PRICE :The Owner shall pay the Contractor as full consideration for the faithfu l
performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract
prices as follows :
Item
No .
Item Unit o f
Measure
Estimate d
Quantity
Item Pric e
(in figures)
Total
(in figures )
1 Traffic Control LS 1 88000.00 $88,000.0 0
2 Asphalt Concrete TONN 18700 50.00 $935,000 .0 0
3 Asphalt Concrete Leveling Course TONN 2890 58 .00 $167,620 .0 0
4 Base Repairs M2 2967 31 .00 $91 .977 .00
5 Paving Fabric M2 69862 1 .20 $83,834 .40
6 3 .0m wide Edge Grind M 10625 4 .50 $47,812 .50
7 5 .Om wide Conform Grind M 508 8 .00 $4,064 .00
8 Full Width Grind (up to 300mm)M2 38790 3 .00 $116,370 .0 0
9 Sewer Manholes EA.106 800 .00 $84,800.0 0
10 Storm Drain Manholes EA.10 800.00 $8,000.0 0
11 Sewer Cleanouts EA.18 550.00 $9,900.0 0
12 Survey Monuments EA .72 430 .00 $30.960 .00
13 Water Valves EA .167 430 .00 $71,810 .00
14 Storm Drain Grate EA .2 950 .00 $1,900 .00
15 Fiber Optic Wells EA .1 950 .00 $950 .00
16 White Pavement Legends M2 161 30 .00 $4,830 .00
4,//-o y
17 Blue Reflectorized Raised
Pavement Markers EA .82 11 .00 $902 .00
18 Yellow High-Vis Crosswalk M 21 28 .00 $588 .00
19 300 mm White Crosswalk / Limi t
Line
M
764 3 .50 $2,674.00
20 300 mm Yellow Crosswalk / Limi t
Line
M
219 3 .50 $766.5 0
21 100 mm Solid White Line M 1306 1 .50 $1,959 .0 0
22 100 mm Solid Yellow Line M 480 1 .20 $576 .0 0
23 Detail M 263 1 .20 $315 .6 0
24 Detail 21 M 50 3 .50 $175 .00
25 Detail 22 M 1121 4 .00 $4,484 .00
26 Model C "Never Fail" Traffi c
Detector Loop LS 1 1000 .00 $1,000 .0 0
27 Valley Gutter LS 1 9500 .00 $9,500.0 0
28 Slotted Drain LS 1 17000 .00 $17,000.00
BID TOTAL :$1 787 .768 .OQ
Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the document smade a part of this Contract .
Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor ma y
be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, sai d
dispute shall be decided by the Owner and its decision shall be final, and conclusive .
ARTICLE III,COMPONENT PARTS OF THIS CONTRACT :The Contract consists of the following documents ,
all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached :
1.Notice to Bidders and information for bidders .
2.Standard Specifications, Engineering Standards and Special Provisions .
2. Accepted Proposal .
4.Public Contract code Section 10285 .1 Statement and 10162 Questionnaire .
5.Noncollusion Declaration .
6.Plans .
7.List of Subcontractors .
8.Agreement and Bonds .
9.Insurance Requirements and Forms .
ARTICLE IV . It is further expressly agreed by and between the parties hereto that should there be any conflict betwee n
the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothin g
herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith .
IN WITNESS WHEREOF,the parties to these presents have hereunto set their hands this year and date first abov e
written .
Al I'EST :
Diane Reynol d
Acting City C I
APPROVED AS TO FORM :
CITY OF SAN LUIS OBISPO ,
A Municipal Corporation
0-40,65'.1g",tetes
Dave Romer o
Mayor
CONTRACTO R
athan P . Lowell
1,jfurke Corporation
City Attorney
oanne A. Burke, President