Loading...
HomeMy WebLinkAboutA53-04CITY OF SAN LUIS OBISPO CALIFORNI A AGREEMENT ti THIS AGREEMENT,made on thi day of , 2001 by and between the City of San Luis Obispo , a municipal corporation and charter city, San Luis Obispo ounty, California (hereinafter called the Owner) an d Tierra Contracting , Incorporated (hereinafter called the Contractor). WITNESSETH : That the Owner and the Contractor for the consideration stated herein agree as follows : ARTICLE 1, SCOPE OF WORK :The Contractor shall perform everything required to be performed, shal l provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility an d transportation services required to complete all the work of construction o f MARSH STREET SEWER IMPROVEMENT, SPEC NO . 90248 in strict accordance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, i n strict compliance with the Contract Documents hereinafter enumerated . It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed an d completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives . ARTICLE II,CONTRACT PRICE :The Owner shall pay the Contractor as full consideration for the faithfu l performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contrac t prices as follows : Item No. Item Unit of Measure Estimate d Quantity Item Price (in figures) Tota l (in figures ) 1 .Remove / abandon (E) sewer facilities LS 1 5000 .00 $5,000 .00 2 .Remove (E) & install (N) MH EA 2 5000.00 $10,000 .0 0 3 .Connect (E) sewer laterals 100 mm EA 32 600.00 $19,200.0 0 4 .Connect (E) sewer laterals 150 mm EA 2 600.00 $1,200.0 0 5 .Regrade and connect (E) 100 mm sewer laterals EA 6 600.00 $3,600.00 6 .200mm PVC sewer pipe M 320 295 .00 $94,400.00 7 .Comply with OSHA LS 1 500 .00 $500 .0 0 8.Traffic Control LS 1 2500 .00 $2,500 .0 0 9.Restoration of Traffic Stripes/Marks LS 1 2500 .00 $2,500 .0 0 Al .100 mm Standard Electrical Conduit M 395 14 .00 $5,530 .00 A2 .Manhole Cover & Access Box EA 2 500 .00 $1,000 .00 BID TOTAL: $145,430.0 0 Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the document s made a part of this Contract . -1 - Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor ma y be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, sai d dispute shall be decided by the Owner and its decision shall be final, and conclusive . ARTICLE Ill,COMPONENT PARTS OF THIS CONTRACT:The Contract consists of the following documents , all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached : 1.Notice to Bidders and information for bidders . 2.Standard Specifications, Engineering Standards and Special Provisions . 2 . Accepted Proposal . 4.Public Contract code Section 10285 .1 Statement and 10162 Questionnaire . 5.Noncollusion Declaration . 6.Plans. 7.List of Subcontractors . 8.Agreement and Bonds . 9.Insurance Requirements and Forms . ARTICLE IV . It is further expressly agreed by and between the parties hereto that should there be any conflict betwee n the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothin g herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith . IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first abov e written . CITY OF SAN LUIS OBISPO , A Municipal Corporatio n (iO Ken Haman, City Administrative Office r APPROVED AS TO FORM :CONTRACTO R Iona . n P .ell Tiefra CbntractiAg, Incorpo tie d City Attorney Randy Douglas, President