HomeMy WebLinkAboutA1-05 Foothill Pump StationF
CITY OF SAN LUIS OBISP O
CALIFORNI A
AGREEMENT
2CP by and between the City of San Luis Obispo ,
alifornia (hereinafter called the Owner) an d
WITNESSETH :
That the Owner and the Contractor for the consideration stated herein agree as follows :
ARTICLE 1, SCOPE OF WORK :The Contractor shall perform everything required to be performed, shal l
provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility an d
transportation services required to complete all the work of construction o f
FOOTHILL PUMP STATION ABANDONMENT, SPEC NO . 9044 8
in strict accordance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, i n
strict compliance with the Contract Documents hereinafter enumerated .
It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed an d
completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives .
ARTICLE II,CONTRACT PRICE :The Owner shall pay the Contractor as full consideration for the faithfu l
performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contrac t
ri ce es as follows :
Item
No.
Item Unit of
Measure
Estimate d
Quantity
Item Pric e
(in figures)
Total
(in figures )
1 .Installation of 200mm Cross an d
three valves on Ramona Drive
LS 1
13,620 .00 13,620 .00
2 .Waterline Connection on Ramon a
Drive
M 3
1,056 .00 3,168 .0 0
3 .Waterline Abandonment on Foothil l
Blvd
LS 1
2,375 .00 2,375 .0 0
4 .Fire Hydrant Lateral M 10 601 .00 6,010 .00
5 .Fire Hydrant Assembly LS 1 2,689 .00 2,689.00
6 .Removal of Pump Station LS 1 13,982 .00 13,982 .00
7 .Waterline Connection at location o f
removed Pump Station
M 13
518 .00 6,734 .00
8 .New Curb, Gutter and Sidewalk o n
Foothill Blvd .
M2 8
366 .00 2,928 .0 0
9.Replacement of Traffic Striping LS 1 595 .00 595 .0 0
10 .New Fence and Gate M 10 623 .00 6,230 .0 0
11 .Walk-on Bark LS 1 1,765 .00 1,765 .00
BID TOTAL: $60,096 .00
THIS AGREEMENT,made on this day o f
a municipal corporation and charter city, San Luis
D-Kal Engineering, Inc . (hereinafter called the Con : ctor).
o Cou n
-1 -
Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the document s
made a part of this Contract.
Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor ma y
be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, sai d
dispute shall be decided by the Owner and its decision shall be final, and conclusive .
ARTICLE III,COMPONENT PARTS OF THIS CONTRACT :The Contract consists of the following documents ,
all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached :
1.Notice to Bidders and information for bidders .
2.Standard Specifications, Engineering Standards and Special Provisions .
2 . Accepted Proposal .
4.Public Contract code Section 10285 .1 Statement and 10162 Questionnaire .
5.Noncollusion Declaration .
6.Plans .
7.List of Subcontractors .
8.Agreement and Bonds.
9.Insurance Requirements and Forms .
ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict betwee n
the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothin g
herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith .
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first abov e
written .
CITY OF SAN LUIS OBISPO ,
A Municipal Corporatio n
Ken Ham an, City Administ>~dtive Office r
APPROVED AS TO FORM :CONTRACTO R
Jdtit~txt'P .Lowell D-Kal Engine g, Inc .
City Attorney David Loughr , President