HomeMy WebLinkAboutA30-05 Nipomo Storm DrainCITY OF SAN LUIS OBISP O CALIFORNI A AGREEMENT THIS AGREEMENT,made on this &-~day of ~. , 20 by and between the City of San Luis Obispo , a municipal corporation and charter city, San Luis Obis ounty, California (hereinafter called the Owner) an d Brinar Construction, Incorporated (hereinafter called th Contractor). WITNESSETH : That the Owner and the Contractor for the consideration stated herein agree as follows : ARTICLE 1, SCOPE OF WORK : The Contractor shall perform everything required to be performed, shal l provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility an d transportation services required to complete all the work of construction o f NIPOMO STORM DRAIN IMPROVEMENT PROJECT, SPEC NO . 9051 2 in strict accordance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, i n strict compliance with the Contract Documents hereinafter enumerated . It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed an d completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives . ARTICLE II, CONTRACT PRICE : The Owner shall pay the Contractor as full consideration for the faithfu l performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contrac t prices as follows : Ite m No. Item Unit of Measure Estimated Quantity Item Price (in figures) Tota l (in figures ) 1 .Install Drop Inlet (Eng. Std . 3355)LS 1 $8,000 .00 2 .450mm HDPE Storm Sewer Pipe M 33 $634 .00 $20,922 .0 0 3 .Connect (N) Storm Sewer Pipe t o (E) Drop Inlet (Eng . Std . 3540) LS 1 $1,200.0 0 4.Comply with OSHA LS 1 $500.0 0 5 .Traffic Control LS 1 """""""'""'"""$250.00 BID TOTAL : $30,872 .0 0 Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the document s made a part of this Contract . Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor may be requ ired to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said dispute shall be decided by the Owner and its decision shall be fmal, and conclusive . ARTICLE III,COMPONENT PARTS OF THIS CONTRACT :The Contract consists of the following documents , all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached : 1.Notice to Bidders and information for bidders . 2.Standard Specifications, Engineering Standards and Special Provisions . 2 . Accepted Proposal . 4.Public Contract code Section 10285 .1 Statement and 10162 Questionnaire . 5.Noncollusion Declaration . 6.Plans . 7.List of Subcontractors . 8.Agreement and Bonds . 9.Insurance Requirements and Forms . ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict betwee n the terms of this instrument and the bid or proposal of said Contractor, then this instrument shall control and nothin g herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith . IN WITNESS WHEREOF, the parties to these presents have hereunto set theft hands this year and date first abov e written. CITY OF SAN LUIS OBISPO, A Municipal Corporatio n Ken Ham an, City AdminihErative Office r APPROVED AS TO FORM : CONTRACTOR jy.2'~~ P 411 9enathan P . Lowell Brinar Construction, Incorporate d City Attorney Frank Brinar, President