SUBJECT: RFP REQUESTING EIR CONSULTANT FOR THE COSTCO/FROOM
RANCH DEVELOPMENT, ER173-00
CAO RECOMMENDATION:
A. Approve the workscope for Environmental Impact Report (EIR) consultant services in
connection with the Costco project and authorize staff to proceed with sending out
Request for Proposal (RFP) documents to qualified consulting firms.
B. Authorize the CAO to award the contract to a qualified consulting firm, contingent upon
the developer depositing with the City the amount of the contract plus a 30%
administrative fee.
DISCUSSION:
Situation
Costco Wholesale has filed an application for construction of a warehouse retail store on a 16.5-
acre site on the west side of Los Osos Valley Road between Madonna Road and U.S. Highway
101. The subject property carries a General Plan land use designation of General Retail and is
zoned C-R (Retail-Commercial). The proposed project involves the development of 33 acres
with approximately 260,000 square feet of commercial uses and site improvements. The specific
proposal includes a 138,000-square foot Costco store and 867 parking spaces on a 16.5-acre
parcel, 122,000+/- square feet of general commercial on the two remaining Froom Ranch parcels
on Los Osos Valley Road, parking, landscaping and various site improvements. Attachment 1 is
a conceptual site plan.
In order to proceed with the applicant's proposal, the project must be processed consistent with
the California Environmental Quality Act (CEQA) and all applicable City Regulations. The
Community Development Department staff has completed a preliminary review of the project
and determined that it will require the preparation of an Environmental Impact Report (EIR) to
evaluate the potential impacts of the project and to comply with the California Environmental
Quality Act. The EIR will address potential impacts in the areas of: aesthetics, air quality,
biological resources, cultural resources, General Plan consistency, geology, hazards, hydrology
and drainage, noise, transportation/circulation, and utilities. These impacts will be evaluated for
project-specific and cumulative effects. The EIR will also include review of the potential uses
and architectural design for the remaining Froom Ranch parcels that front onto Los Osos Valley .
Road. The EIR will also examine project alternatives, including the "No-Project" scenario.
Council Agenda Report ostco/Froom Ranch Project EIR 1L
Page 2
Attachment 2 is a copy of the proposed EIR workscope. It should be noted that the workscope
would be refined with input from the Council and the selected EIR consultant.
It should be noted that an initial environmental study was initiated, but was not finalized because
it was determined that an EIR is required for the project. The EIR is being processed consistent
with Section 15060 of the CEQA Guidelines, which states:
If the lead agency can determine that an EIR will be clearly required for a
project, the agency may skip further initial review of the project and begin work
directly on the EIR process described in Article 9, commencing with Section
15080. In the absence of an initial study, the lead agency shall still focus the EIR
on the significant effects of the project and indicate briefly its reasons for
determining that other effects would not be significant or potentially significant.
Potentially significant impacts are briefly discussed in the EIR workscope. Less than significant
impacts were identified in the areas of. energy and mineral resources, population and housing,
public services, recreation and utilities and service systems. The EIR will discuss why these
issue areas were determined to be less than significant.
Impact of Building Size Ordinance
On November 6, 2001, the San Luis Obispo City Council voted 3-2 to introduce Ordinance No.
1404 (2001 series) amending the Zoning Regulations to establish building size limits for large-
scale retail establishments in all commercial zoning districts, to set a maximum parking
requirement for large-scale retail establishments over 45,000 square feet and to exempt existing
large retail establishments. The ordinance sets a building size limit of 60,000 square feet in the
C-R zoning district with the possibility of going up to 120,000 square feet in the C-R zone and a
provision to exceed the 120,000 square foot limitation by up to 20%(144,000 square feet) with a
ground floor maximum of 80,000 square feet, if the retail building includes multiple floors and
meets community- and design-based performance standards. The City Council will be
considering final passage of Ordinance 1404 (2001 series) on November 20, 2001 with the
ordinance going into effect 30 days thereafter.
Since the City Council did not exempt "pipeline" projects from the ordinance, the Costco
proposal will be subject to the recently approved size limitations and parking requirements.
Approval of the retail size ordinance means that the Costco application would eventually need to
be revised to comply with the standards. In staff s opinion, it is possible for Costco to design a
facility that provides 138,000 square feet of floor area and complies with the building size
ordinance. Staff has been in contact with Costco to discuss these alternatives. If revisions are
pursued, the draft EIR workscope would be refined with input from the public agencies,
interested parties and the EIR consultant. So, there will be an opportunity to revise the project
description before commencing work on the EIR.
CY z
Council Agenda Report _—ostco/Froom Ranch Project EIR RI,
Page 3
Previous Environmental Studies and Resources
The EIR will use information provided in previous environmental documents. Four EIRs
provide information about the project area:
• Final Supplemental Environmental Impact Report for Madonna/Eagle Hardware &
Garden,prepared by Morro Group, Inc. for San Luis Obispo County, October 1998.
• San Luis Obispo Area Plan Update EIR prepared by San Luis Obispo County, certified in
1996.
• Land Use Element/Circulation Element Updates Final EIR, prepared by the City of San
Luis Obispo in August 1994.
• DeVaul Ranch Planned Development Final EIR, prepared by the City of San Luis Obispo
in October 1998.
Select information from these documents will be used in the preparation of the recommended
EIR. Each document will receive a peer review prior to incorporation of any information into
the Costco/Froom EIR.
Schedule for EIR Preparation
With City Council endorsement of the RFP and workscope, RFPs would be sent out to qualified
consultants on November 26,2001,with consultant proposals due back to the City on December 30,
2001. The schedule included in the RFP anticipates interviews to be held after the first of the year
and a consultant contract awarded on January 25, 2002. The RFP specifies that the Administrative
Draft EIR would be delivered to the City within 90 days after execution of the contract.
CONCURRENCES
The proposed plans were distributed to other departments for review and comments. Those
comments have been included in the EIR workscope. It should also be noted that all City
departments and other governmental agencies will be given another opportunity to comment on
the Notice of Preparation that will be sent out prior to beginning work on the EIR.
FISCAL IMPACT
Once a qualified consultant is selected and a contract negotiated, the project applicant will pay
all of the costs for the consultant services to prepare the EIR, plus a 30% administrative fee, with
the administration of the consultant contract overseen by the Community Development
Department, in conjunction with the Finance Department. This is the approved procedure for
City-required EIRs. Therefore, the project will have no direct fiscal impact.
C � ,3
Council Agenda Report'=--...ostco/Froom Ranch Project EIR Ri_ '
Page 4
ALTERNATIVES
1. Approve the workscope, but direct staff to prepare the EIR.
If a consultant were not retained to prepare the EIR, it would be the responsibility of the
Cityto do so. With staff responsible for EIR production, the timeframe for completion of
the document would be lengthier than that estimated above for a consultant, and other
staff work program items would be further postponed. In addition, staff would need to
hire sub-consultants to adequately evaluate certain technical issues.
2. Continue consideration of the workscope and RFP with direction to staff on necessary
changes.
ATTACHMENTS
Attachment 1—Conceptual Site Plan
Attachment 2-Excerpts from Draft RFP including the Scope of Work
Attachment 3—Proposers List
The entire draft RFP and workscope are available in the Council reading file.
' - . . -
o I®
�I i•.1—. __ I :•11 Ilial tl 1'\
e �
::u::: -Cin j � •�
�: 3, Ail 0>•� w�9 qr; ash>•�ol ` • '
7 a:0[at♦� I9t4 RIS wl n��n I � t
,E'-'�-'-.3u. .ton�.L.V•B!!10 -71,E- �-
AIR
ju
pi
biq Q� �• __ _ice in
1_■1 yp1_. `■_ ` I` I I I - — — — — — �I dl �I
� der rr 1!:► � 1M �� ' I � ! != f el cl :�
8 ' i7i�:Du•~�•-�3�.p`^:::iiriii� I- � I II 1 � a
i
Section A Attachment 2
DESCRIPTION OF WORK
Project Description
An application has been filed to develop of 34 acres of land with approximately 260,00 square feet of
commercial uses and related site improvements. The project includes a 138,000 square foot Costco
Wholesale store with tire sales/installation and gas pumps, and approximately 137,000+/- square feet
of general commercial uses in multiple buildings. The project involves: site grading, utility
installation, parking, landscaping and various other site improvements.
The project is described in greater detail in application materials submitted by the applicant, which are
available for public review in the Community Development Department. A reduced site plan is attached.
Scope of Work
An preliminary review of this project determined that there may be significant environmental impacts
associated with development and that an environmental impact report (EIR) is required. The applicant
is not disputing the need for preparation of an EIR. The following workscope more specifically
identifies issues and tasks that need to be performed to evaluate potential impacts of the project.
EIR Workscope Items
1. Aesthetics
The General Plan Circulation Element (Scenic Roadways Map) designates this segment of Los Osos
Valley Road as a roadway of moderate scenic value. From this segment are views of Cerro San Luis, the
Santa Lucia Foothills and the Irish Hills. The project could block views of these scenic resources and
permanently alter views along this roadway.
A visual study must be completed for the project. The visual study should emulate views of the hillsides
from vehicles and pedestrians in the vicinity of Los Osos Valley Road, from Highway 101 to beyond
Madonna, as they will be with the proposed buildings in place. Mitigation should be included for
significant impacts on these views. The consultant shall complete a visual analysis, identify potential
impacts on views of important scenic resources, and suggest appropriate mitigation measures.
2. Air Quality
The proposed project will create result in short-term (construction activities)and long-term (operational)
air quality impacts. Air quality impacts from this project shall be evaluated for both short-term and long-
term conditions and compliance with the San Luis Obispo Air Quality Plan.
• In conjunction with trip generation figures provided from the required traffic study, interpolate
expected emissions generated by the project.
• Quantify expected emissions from construction-related activities.
• Discuss modifications that could be made to the proposed project to result in a more compact
development pattern and improve transit and pedestrian orientation.
- - Attachment 2
• Evaluate the reduction in trips to outlying areas for shopping with development of the site and
the associated impacts to air quality on a regional scale.
• Discuss prevailing wind patterns in the area and the impacts of wind on site development.
3. Biological Resources
Previous environmental studies have verified the presence of seasonal wetlands in the project area. The
biological study should map the location and extent of affected wetland and grassland habitat that would
be affected by proposed development. Wetland delineation should be determined consistent with the
Army Corps of Engineers Delineation Manual. The study should determine the type and significance of
impacts that proposed on- and off-site improvements could have on habitat areas, with particular
attention to potential impacts on wildlife migration routes across the project site. The report should
include recommended mitigation measures where impacts may be significant.
The Congdon's tarplant was found in the development area of the DeVaul annexation. The project site
was surveyed for Congdon's tarplant in July 1998. Two small population of the plant was found along
the northerly property boundary. These discoveries indicate that the plant could be found throughout the
project site.
4. Geologic Problems
The proposed project is located within, or in close proximity to, the Los Osos fault zone as defined by
consultants to Pacific Gas and Electric in a 1987 report of the Diablo Canyon Long Term Seismic study.
Geologic hazards, seismic hazards (earthquake shaking and liquefaction) and soil hazards (shrink-swell
potential, subsidence) were analyzed in the EIR Supplement prepared for the Madonna/Eagle Hardware
&Garden project.
The EIR will address geologic problems on a project-specific basis. It will provide an overview on the
soils and geologic conditions of the site. Discussion should focus on the site's potential for liquefaction
and subsidence, and identify necessary earthwork, special grading, construction techniques and
foundation design criteria for the site development proposed.
5. Hazards and Hazardous Materials
The project includes the installation of fueling pumps in conjunction with Costco Wholesale.
Construction and operation of the wholesale store and general commercial uses would not create
significant hazards. Construction of the proposed gas pumps could create a significant hazard to the
public or the environment though the routine use and transport of hazardous materials (gasoline)as well
as the placement of underground storage tanks. During transportation and filling, spills and accidents
leak oil into the environment. Vaporization and underground tank leakage add even more chemicals to
the neighborhood environment.
The EIR will assess the potential impacts associated with the fuel pumps and identify mitigation
measures to address this impact.
6. Hydrology and Water
The proposed project will increase runoff from the site as a result of the increase in impervious surfaces
Attachment 2
associated with the roof areas and paved parking. The applicant proposes to mitigate the effects of the
increased runoff by detaining runoff in a detention basin. The Madonna/Eagle Hardware & Garden EIR
evaluated drainage for that hardware 'store, but did not address runoff from development of the two
parcels on Los Osos Valley Road. This EIR will evaluate drainage impact from overall site
development.
• Describe impacts of the project in terms of absorption rates, drainage patterns, and the rate and
amount of surface runoff.
• Evaluate the flood hazard for the site and the potential adverse impact of flooding on the project.
Evaluate the potential impacts of the project on flooding of the site and to adjacent or
downstream properties.
• Review and evaluate the proposed recommendations included in the submitted drainage and
flood analysis for the project, and suggest any additional mitigation measures to address project
impacts.
7. Land Use& Planning
Provide a summary of the relevant general plan policies that relate to development. Discuss briefly how
proposed land uses were established for this site with the update of the City's Land Use Element. The
EIR will evaluate the project's effect on the City's growth management policy for non-residential
development.
The applicant is proposing to construct a 138,000 square foot commercial building, 867 parking spaces
(one space per 159 square feet of floor area) and landscaping. On November 6, 2001, the City Council
voted to introduce a retail size cap ordinance that would limit the size of the building to 60,000 square
feet with provisions to allow the building to go up to 120,000 square feet with compliance with certain
performance standards. The ordinance would also set are a maximum parking requirement of one space
per 250 square feet of gross floor area. The project will be evaluated for consistency with the retail size
limit ordinance. It should also be noted that a smaller size store will be evaluated an alternative project.
8. Noise
The project is not expected to result in long-term adverse noise impacts. However, there may be short-
term impacts during grading, when subdivision improvements are installed and when individual homes
are constructed.
• Suggest mitigation measures for short-term noise impacts from construction activities.
• Analyze the potential impacts of the project and identify appropriate noise attenuation measures
consistent with the 1996 Noise Element and Noise Guidelines.
9. Transportation/Circulation
The proposed project will generate additional vehicular trips that will increase traffic volumes on the
nearby road system. Preliminary estimates indicate that this project could significantly increase the
amount of traffic on Los Osos Valley Road between Madonna Road and U.S. 101. Necessary changes to
the highway interchange, the roadway and affected intersections must be clearly identified. City staff is
working with project representatives, the California Department of Transportation (Caltrans) and
interested property owners to develop a work scope for traffic studies.
-3-
Ahathmen't 2
Traffic Study Workscope Items
A traffic study will need to be prepared and incorporated into the environmental document for the
project. All calculations and analysis shall be conducted using the most recent Highway Capacity
Manual (HCM) and Highway Design manual methodologies. Proposed Trip Generation characteristics
and distribution are to be submitted to the City for review and comment/approval prior to proceeding
with the traffic analysis. All mitigation measures proposed to address significant impacts must be
feasible.
The consultant shall utilize the San Luis Obispo Citywide Traffic Model (SLOCTM) to develop the
background traffic projections for future year analyzes. The study facilities are to be analyzed as
existing and existing with traffic generated by the proposed project. The consultant shall supply exhibits
illustrating proposed mitigations. Along arterial corridors traffic signal progression analysis may be
necessary for Level of Service determinations and mitigations.
Regarding the SLOCTM, the consultant shall provide the City with a copy of disk and documentation of
the project with the project land uses and loaded network. If the consultant utilizes another software
other than MINUTP, a licensed copy of the program shall be provided to the City along with the project
disks.
This traffic study will need to evaluate the following:
A. Streets/Traffic
1. Provide a description of existing traffic conditions, including LOS on the current
road system, in the vicinity of the project. Evaluate the project's impact on LOS
at: the Los Osos Valley Road intersections with Madonna Road and Highway
101; the Highway 101 ramps with Madonna Road, Los Osos Valley Road and
Prado Road; and the Prado and Los Osos Valley Road intersections with South
Higuera Street. What specific mitigation measures will maintain LOS D or
better?
2. Development of the proposed project may occur incrementally. Complete an
Existing Condition Analysis and Sensitivity Analysis for the project to determine
if project traffic exceeds intersection thresholds (LOS D) and freeway ramp
thresholds, and at what development level. Identify a phasing of road
improvements to mitigate the phased development.
B. Transit Service
1. How might the project's site plan and transportation improvements be modified
to encourage greater transit use(e.g. Transit oriented development concepts)?
2. What facilities need to be provided to satisfy transit demand?
3. How will planned increase in traffic on existing roadways and street
intersections affect current transit service to the site? Provide
recommendation(s)of how on-time performance might be maintained.
CH
r �
10. utilities Attachment 2
Water Supply& Distribution.Workscope Items
• Discuss projected water demand for new retail development and its potential impacts on citywide
water supplies.
• What is the anticipated yield from on-site wells? What types of improvements will be necessary
to improve the quality of the groundwater to meet State and local standards?
• What is the best approach to tie water rights to project entitlements (development agreement, PD
zoning)?
• Are additional offsets required to mitigate the impacts of the new development on the City's
water supply?
Wastewater Service& Facilities Workscope Items
• What are the projected flows for the project?
• How will projected flows impact the capacity of the wastewater treatment plant?
• Evaluate the status of the Laguna sewer lift.station and its schedule for replacement as it relates
to the development of the project
Sewer Service
• Evaluate the adequacy of the proposed sewer system to accommodate the expected development
and discuss any need to provide improvements to the City's existing treatment facilities.
• Evaluate alternatives to the provision of sewer service that does not require a lift station (i.e.,
gravity flow). Discuss concerns with sewer service being provided in the event of a power
outage.
Landfill Capacity
• What will be the impact of this project on the provision of solid waste disposal?
11. Cumulative Effects
The EIR must address cumulative impacts within each area of analysis.
12. Alternatives
Alternatives to the proposed project design need to be evaluated. Alternatives need to clearly indicate
how they would address identified project impacts and should at minimum evaluate the following:
• the"no" project alternative;
• a commercial project of a more limited size and scope; and
• other comparable sites where the project might be developed.
-5-
Attachment 3
PROPOSERS LIST
COSTCO/FROOM DEVELOPMENT EIR SPECIFICATION NO.
Envicom ESA Fugro West, Inc.
28328 Agoura Rd. 4221 Wilshire Blvd., Suite 480 1012 Pacific St., Ste. A
Agoura Hills, CA 91301 Los Angeles, CA 990010 San Luis Obispo, CA 93401
Dudek & Associates, Inc. Jones and Stokes Associates The Morro Group
621 Chapala St. 2600 V St., Ste. 100 1107 Johnson
Santa Barbara, CA 93101 Sacramento, CA 95818-1914 San Luis Obispo, CA 93401
Ogden Environmental & SAIC FIRMA
Energy Services Co., Inc. 816 State St., Ste. 500 849 Monterey St.
510 State St., Ste. B Santa Barbara, CA 93101 San Luis Obispo, CA 93401
Santa Barbara, CA 93101
Woodward Clyde Law/Crandall, Inc. Michael Brandman Associates
Consultants Attn: Roberta Tassey Attn: Patricia Hughes
5951 Encina Rd., Ste. 200 2710 Gateway Oaks Dr., Ste. 150N 15901 Red Hill Ave., Ste. 200
Santa Barbara, CA 93117 Sacramento, CA 95833 Tustin, CA 92780-7318
Kleinfelder Wetlands Research Associates, Inc. Planetek, Inc.
Attn: Susan Charles Attn: Michael Josselyn 41 E. Foothill Blvd., Suite 200
1370 Valley Vista Dr., Ste. 150 2169-G East Francisco Blvd. Arcadia, CA 91006
Diamond Bar, CA 91765-3910 San Rafael, CA 94901
Greystone Leighton and Associates, Inc. Brady and Associates
Attn- Jeffrey Harvey Attn: Andrew Price Attn: David Clore
1211 H Street, Ste. A 31344 Via Colinas, Ste. 102 2215 Fifth Street
Sacramento, CA 95814 Westlake Village, CA 91362 Berkeley, CA 94710
Rincon Consultants, Inc. Emcon Bio Systems
Attn: Stephen Svete Attn: Ilona Rubino Attn: Cathy Newmann
790 E. Santa Clara St. 1921 Ringwood Ave. 303 Potrero St., Ste. 29-203
Ventura, CA 93001 San Jose, CA 95131-1721 Santa Cruz, CA 95060
Tetra Tech, Inc. Chambers Group, Inc. Regional Environmental Consult
4213 State Street, Suite 205 17671 Cowan Ave., Suite 100 Attn: Sandra Fayette
Santa Barbara, CA 93110 Irvine, CA 92614 4241 Jutland Dr., Ste. 201
San Diego, CA 92117-3653
C9-f(
Attachment 3
Zeiser Kling Consultants Robert Bein, William Frost& PRA Group
Attn: Barbara Associates Attn: John Larson
3187 Red Hill Ave., #135 14725 Alton Pkwy. 1190 Marsh St.
Costa Mesa, CA 92626 Irvine, CA 92618-2069 San Luis Obispo, CA 93401
Takata Associates Perspective Planning David Evans & Associates, Inc.
Attn: Kathleen Takata Attn: John Ashbaugh 23382 Mill Creek Dr., Suite 225
600 Fremont Ave. 979 Osos St., Suite E Laguna Hills, CA 92653
South Pasadena, CA 91030 San Luis Obispo, CA 93401
McLaren/Hart, Inc. Padre Associates, Inc. EIP Associates
16755 Von Karman Aave., 5450 Telegraph Rd., Suite 101 601 Montgomery St., Suite 500
#200 Ventura, CA 93003 San Francisco, CA 94111
Irvine, CA 92606-2667
Dames & Moore Burns & McDonnell Ultrasystems Environmental Inc.
3445 West Shaw Ave., Suite 2102 Business Center Dr., Suite 6 Jenner, Suite 210
101 130 Irvine, CA 92618-3811
Fresno, CA 93711 Irvine, CA 92612
Douglas Wood & Associates, Duane A. Morita TPG Consulting, Inc.
Inc. 14312 Shadybrook Dr. Attn. Quincy Struve
1461 Higuera St., Suite A Tustin, CA 92680 679 Monterey Street
San Luis Obispo, CA 93401 San Luis Obispo, CA 93401
C -!a