HomeMy WebLinkAbout12/11/2001, C2 - NEW SIDEWALK CONSTRUCTION 2001-02 SPECIFICATION NO. 90262 co Unat Mvnin4 Damia��� o� j Acjcnaa 12EpoRt (9oZ C I T Y OF SAN LUIS OBI SPO FROM: Michael D. McCluskey, Public Works DirectorW, Prepared By: Gregory A. Walker, Projects Coordinator SUBJECT: NEW SIDEWALK CONSTRUCTION 2001-02 SPECIFICATION NO. 90262 CAO RECOMMENDATION: Award a contract in the amount of $92,047.50 to Maino Construction "New Sidewalk Construction 2001-02, Specification No. 90262" DISCUSSION On November 6, 2001 the Council 1) approved plans and specifications for this. project; 2) authorized staff to advertise for bids; and 3) authorized the City Administrative Officer to award the contract if the contract cost was less than the engineer's estimate of$91,300. On November 21, 2001 the following two bids were received: Maino Construction $92,047.50 Burke Corporation $92,224.50 Because the low bid is slightly over the engineer's estimate, the Council, rather than the City Administrative Officer, must award the contract. FISCAL IMPACT Contract Price $92,047.50 Contingencies at 7 Percent 6,452.50 Total $98,500.00 P Budget Available $100,000.00 ATTACHMENT 1. Bid Summary 2. Agreement I:\Council Agenda Reports\90262—New Sidewalk Construction A ATTACHMENT 1 S S S S S S S S S S S S S S S S S S S S S S S S S o o S O v> us us vi us va en vj � vi � us va ss cn vs us us vi w » uA sn » vi J L'] U R o a m r" U � a S0 0 0 0 0 0 0 0 0 o o o 0 0 0 o 0 0 o o S S o S S S S o 0 o S o 0 0 0 0 0 0 0 0 o 0 0 0 0 0000000000000000000000000 � � 0 J L•] U O '7a F a O 0 m r' U 5 aI I Li I I I I a o 0 0 0 0 0 0 0 0 0 o S S S o 0 0 o S S o S o S S S o 0 0 N � P � b O. OQ Vi di fA fA fA fA Vf Yi (A fA b9 Vi Yf fA fA Efi (A b9 fA N L � o a F a o SSp0O pSOpSS N v a N O O ,J, U z � a •• � a o �i h o o c�' ods d d d d d c o 0 o d d � � o .d d d � o � � $ �? a o �o S m es ss rn s5 vi vi sA vi s5 va of � vi � vj us � N CA C F� a O pp U Q _ LUn Q' a C a p p O O O O O O O N r vio 0 v c. o 0 0 0 c o c o o� <A N 06 cp� cl O. Y3 49 df O Q � O R � F a W `n ad u .'� .Q W 6 Z < .-. h h r•1 N a � F � Qz N N C N qq � Co .� L,2 w z � rQ C N ul na 7 0 D A 3 n aU3 I•rl 7Oi• •O_ .0 � N N1 Q Y1 V r "00 O� O : N f•1 Q, "TD r 40 T O �� N t•1 Q V1' l7 I� Z N 19"19,19,19 N N N N N N �� ATTACHMENT CITY OF SAN LUIS OBISPO CALIFORNIA AGREEMENT THIS AGREEMENT,made on this day of ,2001, by and between the City of San Luis Obispo, San Luis Obispo County, California, hereinafter called the Owner, and Maino Construction , hereinafter called the Contractor. WITNESSETH: That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1,SCOPE OF WORK: The.Contractor shall perform everything required to be performed, shall provide and furnish all of the labor,materials,necessary tools,expendable equipment,and all utility and transportation services required to complete all the work of construction of New Sidewalk Construction 2001-2002,Specification No.90262 in strict accordance with the plans and specifications therefore, including any and all Addenda, adopted by the Owner, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be famished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE II, CONTRACT PRICE: The owner shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item Item Unit of Estimated Item Price Total No. Measure Quantity (in figures) (in figures) 1. Integral sidewalk M2 529.1 90.00 47619.00 2. Detached sidewalk M2 49.5 80.00 3960.00 3. Curb and Gutter Lin m 76.7 105.00 8053.50 4. Driveways M2 196.5 110.00 21615.00 5. Curb ramps Ea 3 3000.00 9000.00 6. Water meter boxes(T-36) Ea 12 150.00 1800.00 BID TOTAL: $92,047.50 Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the documents made a part of this Contract: Should any dispute arise respecting the true value of any work omitted,or of any extra work which the Contractor may be required to do,or respecting the size of any payment to the Contractor,during the performance of this Contract,said dispute shall be decided by the Owner and its decision shall be final,and conclusive. ATTACHMENT 2 ARTICLE III,COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full,if not attached,as if hereto attached: 1. Notice to Contractors and information for bidders. 2. Contract General Conditions and Technical.Specifications. 3. Accepted Proposal. 4. Public Contract code Section 10285.1 Statement and 10162 Questionnaire. 5. Noncollusion Declaration. 6. Plans. 7. List of Subcontractors. 8. Agreement and Bonds. 9. Insurance Requirements and Forms. ARTICLE IV. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this insmnnent and the bid or proposal of said Contractor,then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. ATTEST: City Clerk,Lee Price CITY OF SAN LUIS OBISPO, A Municipal Corporation Mayor Allen Settle APPROVED AS TO FORM: CONTRACTOR C' tt ne Maino Construction Print/type name and title