Loading...
HomeMy WebLinkAbout04/16/2002, C7 - WATER REUSE PROJECT-IRRIGATION DESIGN SERVICES council M.C.,D� 4/ 16/02 j AQenda RCPORt �N 7 CITY O F SAN LUIS O B I S P 0 FROM: John Moss,Utilities Directs if Prepared By: David Pierce,Water Projects Managerk, SUBJECT: WATER REUSE PROJECT-IRRIGATION DESIGN SERVICES CAO RECONIIVIENDATION 1) Approve the selection of Gates&Associates to design the modifications for existing irrigation systems that will be converted to recycled water. 2) Authorize the City Administrative Officer to execute a contract for an amount not to exceed$125,000. 3)Reaffirm the concept of expending project funds to modify existing irrigation systems owned by the City's general fund,other governmental agencies, and private individuals. DISCUSSION On November 6, 2001 the City Council authorized staff to seek proposals for the design of modifications necessary to convert existing irrigation systems and park areas for use of recycled water. Three firms submitted proposals, and two were interviewed on January 10, 2002. The interview panel included Jay Walters (City Engineer), Rich Colombo (Parks Maintenance Supervisor),Todd Beights(Irrigation Maintenance Technician), and.Dave Pierce. The panel recommends Gates & Associates which has experience designing urban parks and landscaping that are irrigated with recycled water. The consultant estimates that it will cost $121,560 to define the work (Task 1), prepare contract documents (Task 2) and provide technical assistance in monitoring the construction(Task 3)for 10 sites. The contract with the consultant will be executed in two phases. Initially the consultant will be authorized to complete only Task 1 (work scope attached). The consultant will evaluate each site, evaluate design alternatives, and meet with the City to select alternatives. The review and evaluation of alternatives under Task 1 will cost approximately$27,000. Staff expects the total cost to complete all three tasks will be less than $121,560. The consultant's estimate for tasks 2 and 3 was based on a cursory review of the drawings for the City sites and proposes to design corrections for existing deficiencies at each site. It is not the intent of this project to provide new irrigation systems at the sites. This project will make those modifications required for the use of recycled water. However, staff believes that it is necessary to perform a full evaluation of each site so that alternatives can be evaluated in order to select the most cost effective course of action. Once the Utilities Department, owners (Public Works Department for five sites), and the consultant have agreed on which sites will have construction documents prepared by this consultant and what work is to be accomplished at each site, the City and the consultant will negotiate a scope of work and fee schedule for Tasks 2 and 3. The City Administrative Officer will have to sign a contract amendment before the consultant is authorized to proceed. Water Reuse Project—Irrigation Design Services Paget The amended contract covering tasks 2 and 3 will authorize the consultant to prepare the plans and specifications for each of the selected sites and then to provide technical assistance during construction. The following sites are included in the Task 1 evaluation: Laguna Hills Park, Laguna Lake Golf Course, Laguna Lake Park, French Park, Islay Hills Park, Laguna Middle School, Los Verdes Homeowners Association (3 sites), State Farm Mutual offices. Staff recommends that, the Water Reuse Project reimburse existing customers for the cost of conversion. The Water Reuse Project budget includes $500,000 to pay for modifications to the customer's sites to make them compatible with the recycled water. Primarily this work will modify irrigation and plumbing systems to insure separation of the potable and recycled water systems, to prevent ponding and runoff of irrigation water, and to adjust the system for different pressure and flow characteristics of the recycled water delivery system. State law allows City's to mandate customer conversion to recycled water with a condition that there be no increase in cost to those customers. Funding the conversions up front will eliminate reluctance to participate that might be caused by cash flow if the custorner needed to modify the irrigation system. Recycled Water comes in many qualities with rules appropriate to the intended use and water quality. The regulatory wording is daunting but the implementation of those regulations is handled with relative ease at most locations. Therefore it was important to find a consultant who has experience with recycled water in a.California urban environment. Gates& Associates was the only firm to demonstrate that essential mix of experience. FISCAL IMPACT Design costs for Task 1 $26,695 Task 2 &3 $94,865 Contingency $19440 Total $125,000 The Water Reuse Project CEP currently has a balance of $189,000 in the account for user site modifications and The FY 2001-2003 Financial Plan (appendix B page 106) indicates that another $300,000 will be available for FY 2002-2003. After funding this design effort $364,000 will remain for construction. Attachment: 1. Proposal Summary 2. Scope of Work \\879_MORRO\SYS\GROUPS\iTfIL\Council Agenda Reports W"_Irrigation Design_Award_CAR doc c7-o Attachment 1 Proposal Summary Irrigation System Design Services for the modification of existing systems to use recycled water at several locations Proposals were received from the following three firms. The selection of consultants is based on qualifications with price being a secondary factor. Therefore cost figures are not comparable until a final scope of work is defined. Costs provided by the consultants are listed for information. Recommended Firms Gates& Associates Initial Evaluation $26,695 Total Cost for evaluation and design for all sites $121,560 This firm is recommended because they have considerable experience designing urban parks and landscaping. They also have experience designing for the use of recycled water in these areas. With a highly regarded irrigation system designer on staff, Gates & Associates presents a team that gives the right emphasis to the function so the irrigation system without overlooking the bigger issue of form and function of the park. David D.Davis Associates Initial Evaluation $14,400+ Total Cost for evaluation and design for all sites $94,875 t This firm has considerable experience using all qualities of water for golf resorts, and considerable experience focused on irrigations hydraulics in municipal parks and sports fields. The primary reason why this firm was not recommended was that it has no experience working with the recycled water in the California urban environment. Mr. Davis was focused on irrigation hydraulics. The presentation emphasized irrigation system function over form or total function of the parks. His experience on similar projects, outside of California, had been as the consulting irrigation system designer on a team with landscape architects and park designers. Cannon Associates Initial Evaluation $69,900 Total Cost for evaluation and design for all sites $134,900 to 169,900 Cannon Associates proposed to work with Firma to provide the Landscape Architectural experience to have a full team. The proposal did not demonstrate the level of experience in urban landscape irrigation system design that was requested or that was available from the other two firms. C 7-3 Attachment 2 TASK 1.0 - DATA The objectives of this task are to develop a framework for project COLLECTION administration and to collect base data from the City of San Luis Obispo in AND ANALYSIS the form of existing documents, field reconnaissance, and discussions with City Departments and staff.- Utilities, Public Works (including maintenance), Parks and Recreation; Regional Water Quality Control Board, County Department of Public Health, School District, Home Owners Association, and other key interest groups. SubTask 1.1 - DGA will attend a scoping meeting with the Utilities Department to obtain Project Initiation base data and review project goals. Based on this meeting, a refined work program, including any necessary modification to the scope of services outlined in the proposal. Once established, the refined work program will serve as the organizing framework for the project. It will specify meetings, work tasks, schedule checkpoints and other aspects of the project. SubTask 1.2- Review existing materials gathered by the City staff as they relate to the Existing Document Irrigation system design, water availability and quality. Materials might Review&Analysis include: • Recycled Water Analysis C Irrigation as-built plans • Planting and grading as-built plans Maintenance reports • Homeowners Association's CC&R's as they relate to the landscape • Recycled water use masterplan or potential future phases • Other relevant documents Obtain City-wide base maps, aerial photographs; and other relevant data in order to prepare a base map at a scale suitable for planning and individual site analysis (assumes adequate information is available regarding layout and irrigation system to create a base map). Sub Task 1.3-Field Concurrent with the subtask 1.1, DGA will tour the project sites with City Reconnaissance/ staff to: Inventory • Identify and photograph significant architectural and natural features, which impact irrigation design and public health safety and welfare. • Understand recycled water distribution system and opportunities to value engineer and potential for future expansion of system. • Identify areas and plant material species which are most impacted by water quality. C 7-4/ Page l /" . Attachment 2 Sub Task 1.3-Field Evaluate existing irrigation system. Develop and implement checklist Reconnaissance/ to evaluate each site for conversion to recycled water. Check list will Inventory include items such as: . Irrigation and Electrical P.O.C., Pressure demand, . Flow demand (peak, average and average that could provide peak week demands by irrigating for eight hours on each of five separate nights), Coverage, • Runoff, • Overspray; • Salt Build-up potential and mitigation; • Equipment inventory, Conformance to current irrigation standards, Non-irrigation connections. Sample and evaluate existing soil SubTas_k 1.4— Consolidate field reconnaissance data and document review into an Design Report opportunities and constraints diagrams. Analysis of alternative levels of Analysis of Existing improvement. Provide Design Report including the following: Conditions and • alternative analysis (level of improvement) for each site Altematives • identification of non-irrigation costs (potable water lines, hardscape removal and repair, cross contamination issues, planting) • planting cost to benefit analysis (priority of improvements) • preliminary matrix of plant sensitivity to water quality • prepare a soils analysis and monitoring plan for mitigation of material build up from salt and other recycled water deposits. Meet with City Public Works and Utilities staff to review findings and obtain input. SubTask 1.5 Assist City staff in analyzing costs, value engineering the project and set Final Design priorities. Develop consensus to proceed with construction documents. Report Revise Design Report. Refine Work Program and Project Schedule. PRODUCTS: • Project library • Base maps - Feld reconnaissance data • Design Report to illustrate analysis & level of improvement for each site • Analysis diagrams and matrices • Refine Work Program and Project Schedule • Soil Analysis and Monitoring Plan MEETINGS: Citystaff 2 Site Review allow sixty-four staff field hours Depending on the ability of maintenance staff to assist with existing conditions,format and materials available from the City, site review may require additional time. Page.2 Attachment 2 TASK 2.0 The objective of this task is to prepare construction documents based on CONSTRUCTION the Design Report approved by the City. The construction documents will DOCUMENT include the following plans, related details and spec cations. The project PREPARATION shall be submitted at 50%, 90% and 100%. Construction documents will be provided in two phases. Phase one will be for three selected projects areas to establish format standards and process. Phase two will be for the remaining seven project areas implementing the standards established as part of phase one. Subtasks 2.1 thru 2.3 will be provided for Phase One and Two. This assumes that all base map information is available to proceed with construction documents. SubTask 2.0— DGA will attend a coordination meeting with the City to review design Coordination report and project goals. Based on this meeting, The project team will Meeting and review the work program and construction budgets including any Schedule, necessary modification to the scope of services outlined in the proposal. DGA will generate an updated project schedule, which will specify meetings, work tasks, schedule checkpoints and other aspects of the project. Sub Task 2.1 — DGA will develop digital files for each project site based on as-built and Computer Bases other"hard copy"information provided by the City, supplemented with field verification by DGA and data provided by the City staff. Sub Task 2.2— DGA will perform a visual review of each project site for general condition Field Verification of the landscape and irrigation. DGA will note existing conditions such as slope, solar and wind, pedestrian and vehicular circulation, verify"hard copy`'information. DGA will collect data regarding on-site use, adjacent use and plant materials which may impact design SubTask 2.3— 50% Prepare preliminary construction documents and cost estimates to the City submittal for review at 50% stage including: • Demolition Plan • Irrigation Plan &Details • Planting Plan and Details • Construction Details • Technical.Specifications SubTask 2.4— Scheduled phone meeting with project team to review comments from the Submittal Review 50% submittal. Sub Task 2.5—90% Prepare construction documents and cost estimates to the City for review Submittal at 90% stage: • Meet with City staff to review plans and obtain comments. • Finalize plans for 90% review and submittal to Regional Water Quality Control Board and County Department of Public Health. Sub Task 2.6— Coordination Meeting with project team to review comments from the 90% Submittal Review submittal. c 7-b Page 3 C , Attachment 2 SubTask 2.7— Prepare construction documents and cost estimates to the City for review 100% Submittal at 100% stage: • Meet with City staff to review plans and obtain comments. • Complete redline comments • Submit final 100% construction documents PRODUCTS: • Schedule • Computer Bases • 50%, 90% and 100% Construction Documents (PS&E) • Three copies of plans at each 50% and 90%submittal and reproducible and electronic files at 100% submittal MEETINGS &SITE VISITS: Phase One: Staff Meetings 2 Site Visits (2) allow 24 staff field hours Phase Two: Staff Meetings 2 Site Visits (2) allow 48 staff field hours TASK 3.0— The objective of this task is to provide the City with bidding, construction Construction observation and administration assistance during the construction period. Services SubTask 3.1— The Consultant will assist the City during the bid process by: attendance at Bidding pre-bid meeting for Phase One. Interpretation of plans and specifications for bidders. Prepare technical aspects of addenda to be issued by the City as necessary. Sub Task 3.2— The Consultant will assist the City during the construction process by: Construction attendance at pre-construction meeting. Submittal review. Draft Observation and clarifications, change orders and field directives,. Conduct two inspections Administration per project site, and prepare punch lists. PRODUCTS: • Addenda • Clarifications • Change Orders • Site Inspections • Punch lists MEETINGS &SITE VISITS: Phase One: Pre-bid Meeting allow 16 staff field hours Site Meeting and Visits allow 16 staff field hours Phase Two: Site Visits allow 32 staff field hours Page 4 ATTACHMENT 2 .... ... .... .... .... O C14 IT C-4 IT CD • t" kn .... ... ..... O 03 00 00 qt -'r CN -,t eq eq �o 00 %0 N C4 tn W) C-4 T 6s ..... .... O ..... ... .. ..... .... .. t4 00 r4 00 c 00 NCV":r -r 00 "t 00 00 00 m -tr C4 CN N %n IT t �z %0 00 -,r Nqv t4 r4 C-4 eq Go 00 V1 cc 00 CD 00 r4 No C-4 qT en C4 00 Qi cz O -,r �r e4 00 N vv vvm 00 �o eq IQ v qtr 00 w 14 k� CX OC 6y9 ti ..... GK ..... Co Q tj CZ Q 0 C4 (14 k-i It* c� (Z C4 r4 C4 C4 C4 el VIcs ch c so� 6q In 6%6s fiq 6q US 6s ..... ..... .. 03 ww if Z Ql S CQ t3 29 p1q, tq zn Q 14 . . to J9