HomeMy WebLinkAbout09/03/2002, C3 - HVAC IMPROVEMENTS AT CORPORATION YARD AND BUS MAINTENANCE YARD - SPECIFICATION NO. 90116 counat D� 9/3 oz Agenda REpont 'wmNb� c� CITY OF SAN LUIS O B I S P O FROM: Michael D. McCluskey, Public Works DirectoR9V-- J Prepared By: Dave Smith, Facilities Maintenance Supervisor Z SUBJECT: HVAC IMPROVEMENTS.AT CORPORATION YARD AND BUS MAINTENANCE YARD - Specification No. 90116 CAO RECOMMENDATIONS: 1. Approve plans and specifications for"HVAC Improvements, Specification No. 90116 ". 2. Authorize staff to solicit bids. 3. Authorize the City Administrative Officer to award a contract if the lowest responsible bid is within the engineer's estimate. 4. Approve transfer of$32,150 from completed projects to this project account. 5. Appropriate $6,050 from the Transit Fund (TDA)to this project fund. DISCUSSION As part of the 1999-01 Financial Plan, a.$58,000 project was approved for HVAC Improvements (Heating,Ventilation, and Air Conditioning) at several locations: the Corporation Yard, Police Department, 955 Morro, and the Parks and Recreation Offices. This project involved four phases of work, 1)replacement of outdated controllers to eliminate Y2K issues, 2)minor mechanical work to correct operational efficiencies with existing equipment; 3) contract design with a mechanical engineer to provide plans and specifications for remaining major mechanical work to correct operational efficiencies with existing equipment;and, 4)public bidding of the major mechanical work. To date work for phase one,two, and three has been completed leaving a project balance of $31,700 for phase four. Originally, remaining phase four work would have accomplished two goals: 1) add cooling to the men's locker room at the Corp Yard;and 2) elimination of a"solar effect"that causes extreme temperature swings in a contiguous set of enclosed offices on the outer perimeter of the Corporation Yard Administrative Building. The latter would be accomplished by splitting the single zone into two zones with independent controls. In the time since the original 1999-01 project was approved, several changes in scope of work have developed. This has resulted in increased projected costs beyond current fund balance even though improvements slated for 955 Morro were dropped pending abandonment of that property as active City offices. The changes to the scope of work affecting the final phase are: Corporation Yard (25 Prado Road) • An interior conference room, adjacent to the front reception area in the Administrative Building, was created as part of a larger remodel of that front area. As a result, airflow C3-1 Council Agenda Report—HVAC Improvements at Corporation Yard and Bus Maintenance Yard Page,2 and cooling capacity in the conference room became inadequate with high occupant loads. Installation of a small dedicated cooling unit for that room was determined to be the solution. • Adding cooling to the men's locker room turned out to be more complicated and expensive than originally thought due to the need to replace the existing furnace and modifying ductwork rather than simply adding a compressor-and cooling coil to the existing furnace as is. Bus Maintenance Yard (29 Prado Road) • This City owned building is occupied by the City's contract bus transit service, First Transit Inc. The previous occupying contractor, Laidlaw Transit,brought an HVAC system problem to the attention of City staff that turned out to be almost identical to the solar effect on the interior Corp Yard Admin offices. A similar correction of splitting the existing zone is needed so occupants may independently control the climate in adjoining office spaces from existing shared heating and cooling equipment. Funding for phase four work is not adequate for the revised engineer's estimate but additional funding exists from completed project accounts. The work targeted for the Bus Maintenance yard represents about 8% ($6,050) of the total project cost ($69,900). The Transit Fund (TDA) will provide this portion of the expenditure. CONCURRENCES The City Engineer and Transit Manager concurs with the scope of this project. FISCAL IMPACT Total Proiect Costs Engineer's Estimate 63,600 Contingencies at 10 percent 6300 Total 699900 Total Project Funding Source CIP funding available 31,700 Transit Funding (TDA) 6,050 Additional completed project funds 32,150 Budget Available 699900 The CIP funding remaining from the original HVAC Improvements project appropriated in the 1999-2001 Financial Plan (page E-16 of the Financial Plan and page 416 of Appendix B to the Financial Plan) is $31,700. C3 Z 1 i Council Agenda Report—HVAC Improvements at Corporation Yard and Bus Maintenance Yard Page 3_ Additional CIP funding in the amount of$32,150 is available from the completed Library Maintenance project appropriated in the 1999-2001 Financial Plan (page 16 of the Financial Plan Supplement and page E4 of the Appendix to the Financial Plan). The County has sent written confirmation(see Attachment 1)that all work has been completed relative to the shared costs of that project. ATTACHMENT: Attachment 1 —Letter from San Luis Obispo City-County Library L\Council Agenda Reports\2002 agenda reports\CAR 90116 HVAC Improvements.doc Plans and specifications are available for review in the City Clerk's office. �3 3 ?�4CM EA11 San Luis Obispo City-County Library P.O. Box 8107, San Luis Obispo, CA 93403-8107 995 Palm Street (805) 781-5991 Library Administration (805) 781-5784 September 10, 2001 Dave Smith Building Maintenance Supervisor City of San Luis Obispo 990 Palm Street San Luis Obispo, CA 93401 Dear Dave: Today the Library received the City of San Luis Obispo check#199569 in the amount of $70,118.12. This amount is to reimburse the Library for the City's 50% share in the cost to paint/re-carpet the interior of the Library's Main Branch. The interior paint/re-carpet project (completed approximately January, 2001) and the window/roof repair project (completed approximately November, 1999) are both complete and the Library has received the City's 50% reimbursement for both projects. Therefore, the Library will not be invoicing the City for any further amounts on these two projects. Enclosed is a receipt for the above mentioned check. Please see that your accounting department receives it. Thank you for your help in expediting the reimbursement payments from the City to the Library for these projects. Sincerely, S4ult,.-6�1-1&u -u) Sherry L. Ferris Library Accountant The Library Maintenance project has an unspent balance of$65,807.38. After transferring$32,150.00 to the HVAC Improvements project, the remaining funds transferred to the Completed Projects account will be$33,657.38. C3-/