CITY OF SAN LUIS OBISPO
FROM: Michael D.McCluskey, Public Works Director
Prepared by: Matthew A. Horn,Assistant Engineer gyyl}
SUBJECT: SLACK WATER TANK OVERFLOW, SPECIFICATION N0. 90198
CAO RECOMMENDATION:
1. Approve plans and specifications for "SLACK WATER TANK OVERFLOW,
SPECIFICATION NO. 90198".
2. Authorize staff to advertise for bids.
3. Authorize the CAO to award the construction contract if the accepted bid is within the
engineer's estimate.
DISCUSSION
The Slack Water Tank uses an array of instrumentation to control when and how much water is
allowed to flow into the tank. Occasionally, this instrumentation fails and water is allowed to
flow into the tank when it is already full. The overflow line exists to allow an emergency exit for
this water to escape before it can damage the tank. Currently the Slack Water Tank Overflow
line spills its flow onto an unimproved access road. The water then flows down this access road
collecting native soils and aggregate. Eventually this flow reaches Paso Robles Street were the
water drops the native soils and aggregate creating a. nuisance for surrounding property owners
and a maintenance problem for City staff. .
This project will install a new 310mm overflow line from the water tank, approximately 138
meters to the paved portion of Paso Robles Street.
CONCURRENCES
A Notice of Exemption has been filed with the City's Community Development Department.
FISCAL IMPACT
Engineer's Estimate $52,000
Contingencies 5,200
Materials Testing 1,800
Total $59,000
This project is identified on page 80 of the 1999-01 Financial Plan Appendix B. This project
will be funded from the Water Systems Improvement Account, which has a current balance of
$1,758,800 to support this project.
ATTACHMENTS:
1. Project Location Map
Plans and Specifications are available in the Council office for review
IflICOUNCIL AGENDA REPORTS%90198 CARAm
- ATTACHMENT 1
Pro'ect Site
Q
....._ _ .. (w' ..... j
f`
- ��
,
,
,
�i
' I
,
,
CJI
/
i%j z \
RED FILE
MEETING AGENDA
DATE,/ 5' EM #
From: "Cydney Holcomb" <cholcomb@charter.neb
To: "Ken Schwartz" <kschwartz@slocity.org>, "Christine Mulholland"
<cmulholland@slocity.org>, "Allen Settle"<asettle@slocity.org>, "John Ewan" <jewan@slocity.org>, "Jan
Manx" <jmarx@slocity.org>
Date: Tue, Oct 15, 2002 12:55 PM
Subject: Meeting: 10-15-02, lem C-8
Dear Council Members:
Please support item C-8 (Slack Street Water Tank Overflow).
Prior to the recent diversion of overflow from this tank to the access road it would come straight down the
hill onto Slack Street. From there it would travel down the first two driveways through the backyards,
turning everything into a mucky mess and then
finally exit on Hays Street. This has happened countless times in the 30 years I have lived on Hays Street.
Since it probably will overflow again it seems most prudent to extend the overflow line to a point where the
water can reach the storm drain in a direct.manner.
Cheers,
Cydney Holcomb
2076 Hays Street
CC: "Mike McCluskey" <mmclusket@slocity.org>
RECEIVED
OCT 15 2002
SLO CITY CLERK
CDD DIR
UNCIL FIN DIR
IRE CH
IE
F AO PIR4OEPOLICE CH
F
RORI) DIR
UdIR
DIR W