Loading...
HomeMy WebLinkAbout11/12/2002, C12 - TRAFFIC SIGNAL BATTERY BACKUP PROJECT - SPECIFICATION NO. 90079 council ;,a -09,nEpoizC �N C ITY OF SAN L U IS O B I S P O FROM: Michael McCluskey, Public Works Directorw Prepared By: Jim Hanson, Principal Transportation Engineer SUBJECT: TRAFFIC SIGNAL BATTERY BACKUP PROJECT — SPECIFICATION NO. 90079 CAO RECOMMENDATION 1) Approve specifications for "Traffic Signal Battery Backup Systems, Specification No. 90079." 2) Authorize staff to solicit bid for"Traffic Signal Battery Backup Systems, Specification No. 90079" 3) Allocate$4,300 from the CIP Reserve account for the remaining cost of the BBS projects. 4) Authorize the CAO to award a contract if the lowest responsible bidder is within engineer's estimate. DISCUSSION On July 2, 2002, the Council approved a resolution authorizing staff to apply to the California Energy Commission (CEC) for grant funding for battery backup system (BBS) projects. As Council will remember, due to our use of light emitting diode (LED) lights at traffic signals, a BBS that keeps signals operating during power outages is now feasible: Staff applied for, and will receive funding for ten locations that met CEC criteria for the grant funds: 1) Madonna/Los Osos Valley 2) Foothill/Chorro/Broad 3) California/Foothill 4) Madonna/Oceanaire 5) Marsh/Higuera 6) Tank Farm/Higuera 7) Royal/Los Osos Valley 8) Madonna/Dalidio 9) Laguna/Los Osos Valley 10)Madonna/El Mercado After receiving notice of grant award, staff began preparation of installation specifications. These are now complete and ready to advertise for bidders. ota - i Council Agenda Report—Traffic Signal Battery Backup Project—Specification No.90079 Page 2 FISCAL IMPACT On July 2, 2002,the Council approved the following budget for the BBS projects: Amount Source $25,200 CEC Grant $14,800 Required Match—Existing Battery Backup and ticom Grant $1,200 Existing Battery Backup and O ticom Grant $40,000 Total However,the estimated installation cost and budget is as follows: Item Amount Purchase and Installation of Hardware $43,000 Contingencies .$1,300 Total $44,300 Funding Available $40,000 Deficit $4,300 Funding the Deficit: The City has already appropriated$16,000 of its existing Opticom and Battery Backup grant received from SLOCOG ($76,000 is currently unencumbered). Staff does not recommend that the $4,300 be drawn from the existing Opticom and Battery Backup grant account because this money will be necessary for implementation of recommendations made in the Annual Traffic Safety Report and the forthcoming Traffic Signal Master Plan. It may also be necessary to use some of these existing funds for mitigation associated with the Copeland's project. Therefore, $4,300 of the CIP reserve should be allocated to cover the remaining costs of the purchase and installation of the battery backup systems. Staff therefore recommends $4,300 be allocated from the CEP reserve account to complete the project; thereby taking advantage of the significant grant source (59 percent of the total project cost). The City will be reimbursed up to $25,200 by the CEC after installation of the BBS project is complete. ALTERNATIVES 1) Do not accept BBS grant funding and terminate the existing contract with the CEC. This alternative results in the ten recommended traffic signals continuing to operate as they currently do. If the power goes out,the signals will also go out. 2) Allocate the $4,300 from the existing Opticom and Battery Backup grant funding. This alternative results in the project moving forward as planned, however it further depletes Council Agenda Report—Traffic Signal Battery Backup Project—Specification No.90079 Page 3 already minimal existing traffic signal money. Available in the Council Read File : Draft Notice Inviting Bids 1:\Council Agenda Reports\2002 Agenda Reports\BBS Bid Council Agenda Report.doc �� a� 3