FROM: Michael D. McCluskey, Director of Public Works
Prepared By: Barbara Lynch, Civil Engineer
SUBJECT: 2004 DOWNTOWN UTILITY PIPELINE REPLACEMENT PROJECT,
SPECIFICATION NO. 90245B
CAO RECOMMENDATION
1. Approve plans and specifications for "2004 Downtown Utility Pipeline Replacement Project,
Specification No. 90245B."
2. Authorize staff to advertise for bids and authorize the CAO to award the contract if the lowest
responsible bid is within 5%of the Engineer's Estimate.
DISCUSSION
On October 7, 2003, the City Council authorized the consolidation of utility pipeline replacement
projects in the downtown to enable all such work to be completed within the next two years
rather than the four-.year period originally proposed in the budget. In order to complete the work
by the end of May, as requested by the Downtown Association, the project was put on an
accelerated timeline. The City's Job Order Contract (JOC) was to be utilized due to the speed in
which a project could be implemented and staff completed the necessary plans by the beginning
of December.
A number of things have changed since the October Council meeting. Utilities Department staff
has reconsidered the importance of their projects originally designated for the second year of the
two-year program and is now recommending that work on Pacific Street be postponed at least
another year. Second, Utilities Department staff has found that the ability of the sewer fund to
carry large CIP projects in 2003-04 is not as great as originally anticipated and thus smaller
projects must be pursued. Finally, the scope of the first year's project (Higuera Street Sewer line
and numerous side street sewer lines) resulted in a JOC bid that exceeded even the original
proposed funding level.
Staff spent considerable time working with the JOC contractor to arrive at a bid amount within
the original CIP budget available but were ultimately unsuccessful. The JOC program is set up in
such a way that should an impasse occur, the City has the option to publicly bid the project.
Staff compared the proposal to an estimated cost based on prior bids and believed there would be
a savings achieved through public bidding. Thus because of new realities in the Sewer Fund and
high bid results from the JOC contractor staff is recommending the project be reduced in scope
and redesigned and released for public bids.
Scope
The original project included a sewer line replacement on Higuera between Nipomo and Morro
and on the side streets downtown between Higuera and Marsh as well as a water line on Monro
2004 Downtown Utility Pipeline Replacement Project, Specification No. 90245B
Page 2
Street and a sewer lateral in front of the Mission. Due to funding availability and the desire to
complete all improvements prior to end of May, staff is now proposing that the scope of work
include replacement of the Higuera Street sewer line, one sewer line on Chorro Street and the
sewer lateral in front of the Mission. The remainder of the lines in the side streets will be
delayed to some future date.
Timing
Public bidding of the project will put it about a month and a half behind schedule. However,
with the reduced scope of work we are confident that the project can be completed by the end of
May. To keep the project on schedule, staff is requesting some leeway in the award of the
project to get as early a start as possible to minimize impacting the downtown during the tourist
season. In addition, staff is also proposing a shortened bid period in order to award the project
and get construction started as soon as possible.
CONCURRENCES
Community Development Department has completed a mitigated negative declaration for this
project. The project includes archeological monitoring similar to that provided on the last
downtown project. The contract for this monitoring was approved by the City Council at their
November 18,2003 meeting.
Representatives of Public Works and Utilities met with the Downtown Association (DA) and
discussed the original concept,the problems encountered and the proposed solutions outlined above.
The DA executive board stated their desire to simply get the work done but to get it done by the end
of May.
FISCAL IMPACT
The engineer's estimate for the new reduced scope project is $330,000. The sewer collection
systems improvement general account has.a current available balance of$515,400.
Construction $ 350,000
._..._ ..---- ........ .--_ . .
Construction Contingencies $ 35,000
.._..-- ._._ ..... ......—. ...
Total for Construction: $385,000
Archeological Monitoring Costs previously approved: $ 89,300
Miscellaneous (printing) $ 1,0001
._.__
Materials Testing. $ 3,600
- - _
Total Estimated Cost: ( $478,900
Available Budget: $515,400
-- ...... ... —- ........ ........... . .........
!
5%over Award Threshold (Bid+Contingencies) $ 404,250
�y-Z
2004 Downtown Utility Pipeline Replacement Project, Specification No. 90245B
Page 3
Costs for Archeological Monitoring are anticipated to go down considerably because of the
reduced project size, and that funding will also be available for construction, if needed.
ALTERNATIVES
1. The entire project could be delayed and bid in November 2004 with construction to start in
January of 2005. Utilities Department does not recommend any delay in the replacement of
the sewer line in Higuera Street as it is their highest priority project. In addition, delay may
overload the inspection staff next year by doubling up pipeline projects under construction.
The high cost of constructing the full project would then delay construction of other critical
sections of the wastewater system, such as those with missing pipe sections and undersized
lines.
2. The entire project could be bid at this time. Construction would go into summer and
additional funding would have to be allocated from Sewer Working Capital and would
ultimately result in the same delay to critical lines as in Alternative 1.
ATTACHMENTS
Attachment 1 -Location Map
Plans and Specifications are available in the Council office for review.
g:\current projects\sewerM245 2004 dt sewer replacement\documertts\1-staff repons;M245b adv.doc
Shortcut on I:driw
G. I /
ATTACHMENT 1
VENABLE U �� o
ro
ro MONT-
ALBA
N
�o o PHILLIPS
CENTER O��F
PEACH
VIEW eF-PGY\
C 2s N
10
\G
�7
1
10
C t
9C, � yF ti
KRIS
JENNIFER
Al Q� w
OED Q U
N
HIGH m RACHEL CT-
F
� ;L]
F
a FLOREN Q�
PROPOSED PROJECT
•-------- INCLUDED IN ORIGINAL PROJECT
2004 aOW11tOWT1 p1pELlilE pROJEGt