HomeMy WebLinkAbout05/04/2004, C4 - RODRIGUEZ ADOBE, SPECIFICATION NO. 99832 councit °� - j acEnaa RepoRt C_ C I T Y Of SAN LU I S OBIS PO FROM: Michael McCluskey;Public Works DirectorV� Prepared By: Michael J.McGuire,Assistant Engineer iV,AM SUBJECT: RODRIGUEZ ADOBE,SPECIFICATION NO.99832 CAO RECOMMENDATIONS 1. Approve plans and specifications for"Rodriguez Adobe", Specification No. 99832. 2. Authorize Staff to advertise for bids and authorize the CityAdministrative Officer to award the . contract if the lowest responsible bid is within the:engineer's estimate of$280,000. DISCUSSION The Rodriguez Adobe residence is located on land owned by the City of San Luis Obispo, which is slated to be developed as a City neighborhood park. The historic residence, uninhabited for several years, is listed on the City's Historic Resources List. The Adobe is an excellent example of the Spanish/Mexican construction style of the mid 19'x' Century. Over the past few years, architects, engineers and a community volunteer group have made efforts to preserve the Adobe and determine the necessary steps needed to rehabilitate the structure and use as a possible meeting room for the neighborhood. Also, this building has been designated as an unreinforced masonry (URM) structure and must be seismically retrofitted to comply with State and local ordinances. This project would involve the seismic retrofit and stabilization of the structure, repair of the adobe walls,improvements to the exterior walls and roof,new wooden doors and windows and installation of utilities to the building. Future work would entail interior improvements and installation of ADA compliant facilities. CONCURRENCES This project has been approved by the Architectural Review Committee and the Cultural Heritage Committee. The Community" Development Department is prepared to issue a building permit to the contractor awarded the project. FISCAL IMPACT This project was approved in the 1997 — 1999 Financial Plan. The majority of funding for this project is from 1996 and 2001 Federal CDBG funds. As part of a resolution with the developer of the adjacent neighborhood, the developer has contributed $100,000 to the restoration of the Adobe and has been included into the Capital Outlay Fund for this project. The balance of funding will be required City-matching funds included into the Capital Outlay Fund, also. Rodriguez Adobe Page 2 of 2 Project Funding CDBG Funds $222,096 Capital Outlay Fund 217,600 TOTAL $439,696 Project Costs Friends of Las Casas De Adobes (FOCA) $20,370 Design&Construction Consultation 27,600 Construction 280,000 Construction Contingency @ 15% 42,000 Construction Management 31,460 Materials Testing&Inspection 5,000 Printing&Advertising 2,600 Door/Window Fabrication &Installation 12,800 Adobe Brick Fabrication 12,793 Landscaping&Irrigation 5,000 TOTAL $439,623 ALTERNATIVES Defer or delay the project. This is not recommended as continued lack of action will accelerate the decay of the building and promote it as a target of vandalism. Currently, the Adobe is an eyesore to the neighborhood and demands some kind of resolution as to its visual appeal. Also, as the Adobe falls into further disrepair,it poses a safety hazard due to the potential for collapse. ATTACHMENTS 1. Vicinity Map. 2. Construction Costs. AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans & Specifications. . IJ/—Council Agenda Reports/2004 agenda repons/Engineering and Maintenance Services(Walter)/Capital Projects Design(Lynch)/Shortcut to 99832-CAR �-a Attachment 1 s ■ ■ Vicinity \ r f s JIVMORE . LU A Rodriguez Adobe ; .,i w'' � ^� ��. �S =��"jn 4�' „x + �'-y, '� a... - c x .uG'rt�§'s.+�• t-s,;. '�'�fi�gg YL;•y.� tt.. ��"' y �''+. r �-" �' r: 9L' }`f..T'yy.i [,-x..�s� .'! kmt}, # �+e p*•�•+++r � � ,,j °� �' " '� -`:" ` •� �. kx+ �y..},�.°`•Y +��•� •Y'as�' ,y�'f,-w'��m" as Z;�q,.�.�r_ ��< \ _� � €,xt•w a 7'.x.r^ .i x. rS i`at;t F � 3 r."2 �r Ts�.'�'".� � .,' '���t. Rodriguez Adobe 1341 Purple Sage San Luis Obispo, California (San Luis Obispo County) N W E S Ott, 3 Rodriquez Adobe Attachment 2 Budget.Estimate Date:April 15, 2004 Rev: 0 MUM co e u e Site work $2,985 Building Demolition-Roof $31,765 Building Demolition-Walls/Floors/Porches $9,270 Foundation-Porches $21,315 Exterior Elevations - Structural Rehabilitation $56,245 -Wood Siding Rehabilitation Exterior Elevations - Trin/Plaster/Painting $16,648 Roof - Structural Framing $69,446 -Wood Shingles Utilities $8,750 Subtotal $216,424 General Conditions/Bond/Insurance @ 12% $25,971 General Contractor's Overhead @ 10% $24,239 General Contractor's Profit @ 5"/0 $13,366 Total Hard Construction Costs $2809000