Loading...
HomeMy WebLinkAbout05/04/2004, C5 - WRF DAFT REPAIR, SPECIFICATION NO. 90461 Counat "'c=,°� May 4,2004 j acEnaa Pepoizt H CITY OF SAN LUIS OBISPO FROM: Michael McCluskey,Public Works Directorqig�'' Prepared By: Michael J.McGuire,Assistant Engineer Wt4W1 SUBJECT: WRF DAFT REPAIR,SPECIFICATION NO.90461 CAO RECOMMENDATIONS 1. Approve plans and specifications for"Water Reclamation Facility DAFT Repair", Specification No. 90461. 2. Authorize Staff to advertise forbids and authorize the City Administrative Officer to-award the contract if the lowest responsible bid is within the engineer's estimate of$130,000. 3. Approve transfer of$163,000 from the Major Equipment Maintenance Account to the project account. DISCUSSION The Dissolved Air Flotation Thickener (DAFT) tank is a critical component in the treatment of wastewater for the City of San Luis Obispo. Over the years, the DAFT tank has deteriorated from normal use and been damaged by corrosion from the chemicals and gases associated with the wastewater process, and is currently in need of repair and replacement of equipment. The work involves the removal, replacement, installation, repair, cleaning and coating of major components of the tank and its supporting equipment. This project must be constructed in the summer months, when Cal Poly attendance is reduced and wastewater flows to the WRF are at their seasonal low. On April 20, 2004, the City approved the purchase of the equipment necessary for the replacement, due to the length of fabrication time required, so that the contractor awarded the project will be able to perforin the work during this critical time frame. CONCURRENCES The project has received approval from the WRF Supervisor, the Utilities Department and a Notice of Exemption from the Planning Department. FISCAL IMPACT This Capital Improvement Project was part of the 2001-03 Financial Plan. Funds to support this project will come from the Major Equipment Maintenance Account, which has approximately $907,900 available for use and after this transfer will have$744,900 remaining. c C5 Water Reclamation Facility Repair Page 2 of 2 DAFT Equipment Installation $75,000 Sandblasting, Coating&Painting 55,000 15% Construction Contingency 20,000 Coating Inspection 13,000 TOTAL $163,000 A 15% construction contingency is included to cover any labor involved for equipment discovered during construction to be in need of replacement or repair, other than that equipment which is part of this project. A coating inspector will be retained via separate contract to insure the highly specialized cleaning and coating of this critical equipment and the tank itself. ALTERNATIVES Defer or delay the project. This is not recommended as delay of repair.work on the DAFT tank will prolong the sub-standard efficiency of the tank and at worst, could fail, resulting in penalties from failing to meet state and federal water quality standards and enormous costs for emergency repairs. AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE 1. Special Provisions. 1://-Council Agenda Reports/2004 agenda reports/Engineering and Maintenance Services(Walter)/Capital Projects Design(Lynch)/Shortcut to 90461- CAR-REPAIR