Loading...
HomeMy WebLinkAbout06/01/2004, C4 - SWIM CENTER HIGH RATE SAND FILTRATION SPECIFICATION NO. 90351 D council Mm64 D.! -� -a j ac En as Report 1�Nmba CITY OF SAN LUIS O B I S P O FROM: Michael D. McCluskey, Public Works DirectorQ� Prepared By: Dave Smith, Facilities Maintenance Supervisor SUBJECT: SWIM CENTER HIGH RATE SAND FILTRATION Specification No.90351 CAO RECOMMENDATIONS: 1. Approve plans & specifications for "Swim Center High Rate Sand Filtration, Specification No. 90351". 2. Authorize staff to solicit bids. 3. Authorize the City Administrative Officer to award a contract if the lowest responsible bid is within the engineer's estimate. DISCUSSION This project was approved in the 2003-05 Financial Plan. (See pages E-10 and E-30 of the Financial Plan and pages 239-240 of Appendix B to the Financial Plan.) This project will replace the existing diatomaceous earth filtration system with a high rate sand filtration system. High rate sand filtration has become the industry standard because it: 1. Requires less maintenance; 2. Allows continued use of the pool when filters are serviced; 3. Eliminates overtime now required to service the filtration system after-hours; 4. Lowers the consumption of chemicals, water, and electricity; 5. Avoids having to dispose of diatomaceous earth, which is a low level hazardous waste. There is no ideal time of the year to close the pool to the public. Parks and Recreation staff has determined the least impacted time period would be starting on August 30, 2004 with construction occurring over the ensuing 30 day contract period. Efforts are already underway to notify swim groups so they can be prepared well in advance to make alternative use arrangements. FISCAL IMPACT Installation of a liquid chlorine disinfection system was included in the project budget. That portion of the overall project has been completed. The table on the next page shows the current status of the overall project budget: �� I I Swim Center High Rate Sand Filtration Page 2 Estimated Project Costs: Design (Actual and Encumbered) 24,576 Construction—Liquid Chlorine Disinfection (Actual) 13,235 Construction—High Rate Sand Filtration (Estimated) 225,000 Construction Management—High Rate Sand Filtration (Estimated) 10,000 Contingencies at 10 Percent of Estimated Construction Cost 22,000 Total Estimated Project Costs $2949811 Total Project Budget $295,000 Plans and specifications are available for review in the Council Reading file. L•\1Council Agenda Reports\2004 agenda reports\Administrative Services (Elliott)\Facilities Maintenance (Smith)\CAR 90351 Sand Filter Replacement v2.doc C��