CITY OF SAN LUIS O B I S P O
FROM: Michael D. McCluskey, Public Works DirectorQ�
Prepared By: Dave Smith, Facilities Maintenance Supervisor
SUBJECT: SWIM CENTER HIGH RATE SAND FILTRATION
Specification No.90351
CAO RECOMMENDATIONS:
1. Approve plans & specifications for "Swim Center High Rate Sand Filtration, Specification
No. 90351".
2. Authorize staff to solicit bids.
3. Authorize the City Administrative Officer to award a contract if the lowest responsible bid is
within the engineer's estimate.
DISCUSSION
This project was approved in the 2003-05 Financial Plan. (See pages E-10 and E-30 of the
Financial Plan and pages 239-240 of Appendix B to the Financial Plan.)
This project will replace the existing diatomaceous earth filtration system with a high rate sand
filtration system. High rate sand filtration has become the industry standard because it:
1. Requires less maintenance;
2. Allows continued use of the pool when filters are serviced;
3. Eliminates overtime now required to service the filtration system after-hours;
4. Lowers the consumption of chemicals, water, and electricity;
5. Avoids having to dispose of diatomaceous earth, which is a low level hazardous waste.
There is no ideal time of the year to close the pool to the public. Parks and Recreation staff has
determined the least impacted time period would be starting on August 30, 2004 with
construction occurring over the ensuing 30 day contract period. Efforts are already underway to
notify swim groups so they can be prepared well in advance to make alternative use
arrangements.
FISCAL IMPACT
Installation of a liquid chlorine disinfection system was included in the project budget. That
portion of the overall project has been completed. The table on the next page shows the current
status of the overall project budget:
�� I
I
Swim Center High Rate Sand Filtration Page 2
Estimated Project Costs:
Design (Actual and Encumbered) 24,576
Construction—Liquid Chlorine Disinfection (Actual) 13,235
Construction—High Rate Sand Filtration (Estimated) 225,000
Construction Management—High Rate Sand Filtration (Estimated) 10,000
Contingencies at 10 Percent of Estimated Construction Cost 22,000
Total Estimated Project Costs $2949811
Total Project Budget $295,000
Plans and specifications are available for review in the Council Reading file.
L•\1Council Agenda Reports\2004 agenda reports\Administrative Services (Elliott)\Facilities Maintenance (Smith)\CAR 90351
Sand Filter Replacement v2.doc