Loading...
HomeMy WebLinkAbout04/06/1993, C-10 - CONSIDERATION OF A SUPPLEMENT TO THE LOCAL AGENCY/STATE MASTER AGREEMENT FOR FEDERAL-AID PROJECTS F IpI eul�� MEETING DATE: ����II city of san .UIS oBispo April 6, 1993 OftCOUNCIL AGENDA REPORT ITE ''N"MBER: FROM: ,,V,,� Michael McCluskey, Public'Works Director v Prepared by: John W. Hawley, Supervising Civil Engineer J SUBJECT: Consideration of a Supplement to the Local Agency/State Master Agreement for Federal-Aid Projects for the "Bridge Replacement Project-Elks Lane at San Luis Obispo Creek, City Plan No. L-10H." CAO RECONEVIENDATION: Adopt a Resolution Approving Program Supplement No. 012 to the Local Agency/State Master Agreement for Federal-Aid Projects No. 05-5016 for "Bridge Replacement Project - Elks Lane at San Luis Obispo Creek, City Plan No. L-10H." DISCUSSION: On June 22, 1978 the Council approved a Master Agreement between the City and State for the expenditure of Federal Funds on approved City projects. Currently the City has been allocated Federal Highway Funds, specifically Bridge Replacement and Rehabilitation Funds (HBRR), for the preparation of plans and specifications for the above-referenced project. The new bridge structure will be wider to provide for two travel lanes and bike lanes, sidewalk (one side only), barrier rails, and meet minimum Federal standards. Roadway transition approaches on either end of the bridge will also be required. Because of the wider bridge and approaches, additional right-of-way acquisition is necessary. In addition, temporary construction easements are necessary in order to provide access during construction. This acquisition was not anticipated when the project budget was prepared, but was determined necessary during the design phase. Staff then applied to Caltrans for supplemental Federal funds to cover the additional right-of-way costs. A fair market value appraisal report has been completed and approved by the State. The total market values of properties affected by this project is the basis for the estimate of right-of-way costs shown in the Program Supplement No. 012 (Exhibit A). This program supplement is the documentation required by the Federal Highway Administration and must be approved by the Council by Resolution in order to encumber the Federal funds and cause such supplement to be a part of the master agreement. It designates the Federal HBRR funds that have been allocated for the right-of-way acquisition and the matching funds to be provided by the City. SIGNIFICANT IMPACT: Program Supplement No. 012 designates an estimated cost for right-of-way acquisition of $24,000 of which $19,200 is Federal participation (80%) and $4800 is City matching funds (20%). city of San LUIS OBISPO COUNCIL AGENDA REPORT HBRR-L10 Page Two CONSEQUENCES OF NOT TAIDNG THE RECOMMENDED ACTION: Federal HBRR funds cannot be utilized for right-of-way acquisition costs involved with the bridge project. FISCAL IMPACT: This project is included in the 1989-93 capital improvement plan on pages E-9 and E-22 of the 1989-91 financial plan. $120,000 was budgeted to cover the City's matching requirements for the Federal grant. There is $109,482 remaining in the project budget. The City's financial obligations on this project include: 20 percent of right-of--way acquisition $4,800 20 percent of construction $90.000 $94,800 Because project finances will be managed through the State system, the City will not have to front project costs and then apply for reimbursement. Instead, the State will bill the City for its matching obligation. For this reason, the City needs to budget only for those matching obligations. Attachments: Draft Resolution Program Supplement No. 012 jhNhbm110h W c�o-a A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO APPROVING PROGRAM SUPPLEMENT NO. 012 TO THE LOCAL AGENCY - �" STATE AGREEMENT FOR FEDERAL-AID PROJECTS NO. 05-5016 FOR THE BRIDGE REPLACEMENT PROJECT - ELKS LANE AT SAN LUIS OBISPO CREEK CITY PLAN NO. L-10H WHEREAS, the City and the State have entered into Master Agreement No. 05-5016 for Federal-Aid Projects; and WHEREAS, Program Supplement No. 012 to the Master Agreement designates the Federal Funds requested and the matching funds to be provided by the City for right-of-way acquisition for the Bridge Replacement Project, Elks Lane at San Luis Obispo Creek; and WHEREAS, the City is eligible to receive Federal Bridge Replacement and Rehabilitation Funds (HBRR) for this project; NOW THEREFORE BE IT RESOLVED, that the City Council of the City of San i Luis Obispo, California hereby: 1. Approves Exhibit A attached, entitled "Program Supplement No. 012 to Local Agency - State Agreement for Federal-Aid Projects No. 05-5016," and the Mayor is authorized to execute the same. 2. Directs the City Clerk to transmit the two (2) originals, attaching to each a copy of the authorizing resolution to: Mr. John W. Ritter Asst. Dist. Local Streets & Roads Engineer California Department of Transportation P. O. Box 8114 San Luis Obispo, CA 93403-8114 Upon motion of , seconded by and on the following roll call vote: C-�-3 Resolution No. (1993 Series) _ Page Two. AYES: NOES: ABSENT: the foregoing resolution was adopted this day of , 1993. MAYOR PEG PINARD ATTEST: CITY CLERK DIANE GLADWELL r ) APPROVED: / A O EY IM/hbn•non by I D s: February 3 , 1993 PROGRAM SUPPLEMENT Nom. 012 Location: 05-SLO-O-SLO to Project Number: BROS-0079 (017) LOCAL AGENCY-STATE AGREEMENT E.A. Number: 05-140754 �—FOR FEDERAL-AID PROJECTS NO. 05-5016 —This Program Supplement is hereby incorporated into the Local Agency-State Agreement for Federal Aid which was entered into between the Local Agency and the State on 06/22/78 and is subject to all the terms and conditions thereof. This Program Supplement is adopted in accordance with Paragraph 2 of Article II of the aforementioned Master Agreement under authority of Resolution No. approved by the Local Agency on (See copy attached) . The Local Agency further stipulates that as a condition to payment of funds obligated to this project, it accepts and will comply with the covenants or remarks setforth on the following pages. PROJECT TERMINI: ON ELKS LANE AT SAN LUIS OBISPO CREEK, BRIDGE NO. 49C-08.1. TYPE OF WORK: REPLACE EXISTING BR. & CONST. APPR. RDWYLENGTH: 0. 1 (MILES) PROJECT CLASSIFICATION OR PHASE S) OF WORK Jx4 143 Preliminary Engineering W X Right-of-Way [ ] [ ] Construction Engineering [ ] Construction iEstimated Cost Federal Funds Matching Funds LocalOTHER OTHER $ 240001117 $ 19200 $ 4800 $ 0 $ 0 $ 0 CITY OF SAN LUIS OBISPO STATE OF CALIFORNIA Department of Transportation By By DISTRICT LOCAL STREET AND ROADS ENGINEER Date Date Attest Title 1 hereby Certify upon my personralL knowledge that budgeted funds are available for this encumbrance:. Accounting Officer✓ M (/W&'k7 Date a 3 9 3 $ 19200. 00 Chapter Statutes I Item Year Program 1BC1 Fund Source AMOUNT 587 1992 2660-101-890 92-93 20.30.010.300 C 224060 892-F 19200.00 APPROVE AS TO FOW- A Page 1 of a 05-SLO-O-SLO DATE: 02/03/93 BRnS-0079 (017) SPECIAL COVENANTS OR REMARKS 1. All maintenance, involving the physical condition and the operation of the improvements, referred to in. Article VI MAINTENANCE of the aforementioned Master Agreement will be performed by the Local Agency at regular intervals or as required for efficient operation of the completed improvements. 2 . The Local Agency will advertise, award, and administer this project and will obtain the State's concurrence prior to either award or rejection of the contract. 3 . The Local Agency agrees the payment of Federal funds will be limited to the amounts approved by the Federal Highway Administration in the Federal-Aid Project Agreement (PR-2)/Detail Estimate, or its modification (PR-2A) or the FNM-76, and accepts any increases in Local Agency Funds as shown on the Finance or Bid Letter or its modification as prepared by the Division of Local Streets and Roads. VX I .� 5. In executing this Program Supplemental Agreement, Local Agency hereby reaffirms the "Nondiscrimination Assurances" contained in the aforementioned Master Agreement for Federal-Aid Program. 6. whenever the local agency uses a consultant on a cost plus basis, the local agency is required to submit a post audit report cover- ing the allowability of cost payments for each individual consul- tant or sub-contractor incurring over $25, 000 on the project. The audit report must state the applicable cost principles utili- zed by the auditor in determining allowable costs as referenced in CFR 49, part 18, Subpart C - 22 , Allowable Costs. Page 2 of o7