Loading...
HomeMy WebLinkAbout04/04/2011, C7 - PARK STREET SEWER REPLACEMENT, SPECIFICATION NO. 90966 1 council. "' °°ao°April 5,2011 j ac,Enaa izepont (,-4- CITY OF SAN LUIS OBISPO FROM: Jay D. Walter, Director of Public Works -70W Prepared By: Dan Van Beveren, Senior Civil Engineer SUBJECT: PARK STREET SEWER REPLACEMENT, SPECIFICATION NO. 90966 RECOMMENDATION 1. Approve plans and specifications for the Park Street Sewer Replacement Project, Specification No. 90966. 2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bid is within the Engineer's Estimate of$185,000. DISCUSSION Replacement of wastewater collection pipes is part of an ongoing program to prioritize replacement of sewer infrastructure. This program has several objectives. Among them are: 1) Replace aging,deteriorated, deficient, or otherwise troublesome sewer infrastructure 2) Reduce or eliminate periodic maintenance requirements and emergency repairs 3) Reduce infiltration and inflow of storm water 4) Ensure uninterrupted sewage flow without health hazard or effluent leakage The Park Street Sewer Replacement project includes thereplacement of the existing sewerline on Park Street between Phillips Lane and Mill Street, and will accomplish the program objectives for this portion of the City wastewater collection system. The sewerline,on Park Street is currently 6" in diameter, and will be replaced and upsized to an 8" diameter pipe to better accommodate existing service requirements. A portion of the sewerline crosses an unnamed creek south of Phillips Lane. The creek crossing consists of a pipe bridge supported by a single steel column with a concrete footing in the creek. The footing has been undermined by the creek flow, and the pipe bridge has required periodic repair and maintenance over the years. Given the sensitive environmental issues of the sewerline crossing the creek, and the potential for continued maintenance issues of the current system, the project scope has included the complete replacement of the pipe bridge with a modern design. The new pipe bridge has been structurally designed to span the creek without the need for intermediate support columns, will be superior to the existing, aged pipe bridge, and will reduce the likelihood of any future accidental release of.sewage into the creek. Due to the need to construct new pipe bridge abutments in the banks of the existing drainage channel, a Streambed Alteration Agreement has been obtained from the California Department of Fish and Game. The agreement allows for a construction window between July 1 and October 30 for construction of the new pipe bridge structure.. C7-1 Park Street Sewer Replacement, Spec No. 90966 Page 2 CONCURRENCES The City's Community Development Director has approved a Mitigated Negative Declaration for this project. No public comments were received during the Initial Study public review period, and a.Notice of Determination was filed with the County on July 16, 2010. Mitigation measures required by the environmental document have been incorporated into the project specifications. FISCAL IMPACT The project is identified in the 2007-09 Financial Plan, page 3-132, with a preliminary cost estimate of$90,000. The current Engineer's Estimate of construction costs is $185,000. There is sufficient budget in the Sewer Collections Master Account to fund the project. Funds will be transferred via a Budget Amendment Request at time of contract award. t Park Street Sewer Replacement-Construction Costs 'Construction: T;� _ $185,000; tonstruction Contingencies: i $18,500; Total for Construction: $2039500' P t : $10,000 Contract Inspection: _ —._— ._ .__.__' _$40,000 - IMaterials Testing: i $10,0001 Total for other costs: _ _ $609000', !Total Cost __. _.._! $263,500'. !Available Balance in Sewer Collections Master Account ' $463,500 ATTACHMENT Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Special Provisions for the Park Street Sewer Replacement Project y �• k +r, . d�t. Si`sT:�tiyi k} iy�yy`.s�`G�+ ,�':..;r,° 4cLa.•`amu tA„gip aY 4.c,.�k i r. !r`.`z w. ,�.'gym ,m T:\Council Agenda Reports\Public Works CAR\2011\CIP\90966 Park.Street Sewer\90966 CAR Advertise.doc C7-2—2 ATTACHMENT US 101 FREEWAY ABBOTT STREET WILSONEl STREET GARFIELD STREET O 9� A� J / 200' 400' T INCH 00 Paws STREET SEWER REPLACEMENT CTCy Of PHILLIPS LANE TO MILL STAN San Wis OB1SpO VICNffY MAP C7-3