HomeMy WebLinkAbout05/17/2011, C6 - WATER RECLAMATION FACILITY (WRF) DIGESTER #1 CLEANING AND MAINTENANCE PROJECT, SPECIFICATION NO. 91 i J f council ounCil MKnneD.�5/17/2011 j ac Enda Report m NmnLv CITY O F SAN LUI S OBI S P0 FROM: Jay D. Walter, Director of Public Works Prepared By: Manny Guzman, Engineer II SUBJECT: WATER RECLAMATION FACILITY(WRF) DIGESTER# 1 CLEANING AND MAINTENANCE PROJECT, SPECIFICATION NO. 91066 RECOMMENDATIONS 1, Approve the plans and specifications for "Water Reclamation Facility: Digester 1 Cleaning and Maintenance Project, Specification No. 91066" and authorize staff to advertise for bids. 2. Authorize the City Manager to award the contract if the lowest responsible bid is within Engineer's Estimate of$215,000. DISCUSSION Routine maintenance work is performed on each of the digesters at the Water Reclamation Facility (WRF) approximately every 5 to 10 years. The harsh environment at the facility necessitates routine maintenance to prevent the need for major facility replacements. Digester No. 1 is a concrete tank approximately 25 feet high, and 60 feet in diameter. An assortment of pipes, pumps, valves, ports, and other miscellaneous plumbing equipment is located on the roof of the digester, and additional equipment is located in the digester's interior. As part of this project, the digester will be emptied and cleaned, a series of valves and other miscellaneous equipment will be replaced and portions of the digester and other equipment will be coated or painted. Coating and painting will protect the digester and its equipment and increase its service life. Deferring this work could mean more costly repairs and major facility replacements. Due to the specialized nature of coating work it is recommended that inspection and construction management services be outsourced to one of the City's on-call inspection firms specializing in industrial coatings work. CONCURRENCES The Utilities Department has reviewed and approved this project. Also a notice of exemption has been filed through the Community Development Department. C6-1 WRF Digester No. 1 Cleaning and Maintenance Page 2 FISCAL IMPACT The Digester No. 1 cleaning and maintenance projects are identified in the 2009-11 Financial Plan, Appendix B, pages 3-133 to 3-137. In the approved projects pending construction section, the emptying, cleaning and repair of Digester No. 1 is identified with a total budget of$300,000. Funding is currently available in the Master Account for Major Equipment Replacement, which has a current available balance of$1,057,396, after accounting for the WRF Clarifier #1 project that is scheduled for bid opening on May 19, 2011. Funds will be transferred at time of contract award. There is sufficient funding in this Master Account to support this project request. The estimated project costs are shown below: . Digester No,. I Cleaning and Maintenance Project i6, Engineer's Estimate: $215,000 Contingencies: $30,000 Construction Management: $451000 Design: $8,000 Printing and Misc: $2,000 Total Project Estimate $3009000 ATTACHMENT Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Project Specifications T:\Council Agenda Reports\Public Works CAR\2011\CIP\91066 WRF Digester 1 Cleaning&Maintenance\CAR Advertise.doc C6-2 kk • • • �IIIIIIIIIIII���� �IIIIIIIIIIII� • VICINITY MAP � : � • WATER RECLAMATION FACILITY DIGESTER • PROJECT SPECIFICA TIONNO.91066