HomeMy WebLinkAbout08/16/2011, C 4 - FOOTHILL & TASSAJARA TRAFFIC SIGNAL MODIFICATION, SPECIFICATION NO. 90854 0 0 council MwigD° 8/16/11 j ac,Enaa Repopm CITY OF SAN LU I S OBISPO FROM: Jay D. Walter, Director of Public Wor4q)ll Prepared By: Chris Overby, Engineer II-Traffic SUBJECT: FOOTHILL & TASSAJARA TRAFFIC SIGNAL MODIFICATION, . SPECIFICATION NO. 90854 RECOMMENDATIONS 1 Approve plans and specifications for construction of the Foothill & Tassajara Traffic Signal Modification Project, Specification No. 90854 2. Authorize staff to advertise for bids and the City Manager to award the contract if the lowest responsible bidder is under the Engineer's Estimate of$306,000. DISCUSSION Improvements to the southwest corner of.Foothill & Tassajara were identified in the 2007-09 Financial Plan. The improvements include widening the corner radius to restore City transit routes which were suspended due to conflicts with vehicles exiting Tassajara, an ADA accessible pedestrian ramp and relocation of utilities that are in conflict with these improvements. In addition to the transit issues, this intersection has been identified in the City's Annual Traffic Safety Report for conflicts with vehicles turning left from Foothill, ranking number 5 in 2007 and number 4 in 2008. The intersection ranking is based on the collision rate in comparison to other locations of similar classification. To address. the left turn conflicts, staff recommends incorporating the traffic safety program recommendations to upgrade the traffic signal to include a separate left turn phase, and install dedicated left tum lanes for traffic on Foothill by relocating the two-to-one lane transition one block east-of its current location. This project has taken longer than expected due to coordination with the private development at 399 Foothill and staffing resource issues. The private development project is to construct additional improvements on both Foothill Road and Tassajara but due to the economy the public improvements included in this bid package have been separated out and need to move forward now. It is unknown when, or if the private project will be constructed. The construction documents are now complete and ready to:advertise. Once approved, the bidding, award and construction process is expected to be completed in approximately six months. FISCAL IMPACT The total Engineer's Estimate for the entire project is $373,200. The original scope of the Foothill/Tassajara improvements identified in the 2007-09 Financial plan included improvements only to the southwest corner. However, in order to provide an overall cost savings by combining construction efforts, the traffic safety report recommendations have been incorporated into this project. There is currently $111,600 available for construction in the project account. Funding for C4-1 0 Foothill &Tassajara Traffic Signal Modification,Specification No.90854 Page 3 the additional safety improvements will be provided by the General Traffic Signal Improvements Account ($236,600), and the Traffic Safety Report Account ($25;000). City Staff recommends the transfer of the necessary funding as identified in the table below to the Foothill/Tassajara Improvements Account at the time of contract award. The respective accounts, as identified above, are provided in detail in the following table. PROJECT BUDGET(SPEC#90854) PROPOSED BUDGET. Engineer's Estimate $ 306,000 Contigency $ 61,200 Misc. (Permits, Printing, Etc.) $ 1,000 Material Testing $ 5,000 Total Project Estimate $ 373,200 RECOMMENDED PROJECT FUNDING SOURCE AVAILABLE FUNDING FUNDING_ _ Foothill/Tassajara Improvements (90854) $ 111,600 $ 111,600 General Traffic Signal Improvements (90872) $ 297,370 $ 236,600 Traffic Safety Report (90558) $ 50,645 $ 25,000 Total Is 459,615 1 $ 373,200 ALTERNATIVES 1. Deny the project. The City Council could deny the project. However, staff does not recommend this due to the potential safety improvements that will result from this project. The documented collision pattern will likely persist and transit routes cannot be restored until this project is completed. 2. Defer the project. The City Council could direct staff to defer the project until a later date. However, staff does not recommend this because of similar impacts to the project being denied. Staff recommends proceeding with the project now because the funding is available and currently the construction market is very competitive. ATTACHMENTS 1. 2007-09 Financial Plan Supplement, E-6:E-8 2. Schematic Design 3. Vicinity Map 4. 2008 Traffic Safety Report: pages i, 36, 71 AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Specifications TACouncil Agenda Rcports\Public Works CAR\201 I\TransportationToothill&Tassajara Signal\90854 ECAR ADVERTISE.doc C4-2 C ATTACHMENT 1 CAPITAL IMPROVEMENT PLAN PROJECT DESCRIPTIONS FOOTHILUTASSAJARA INTERSECTION IMPROVEMENTS CIP Project Summary Making improvements to the intersection of Foothill/Tassajara will cost$125,000 in 2008-09. Project Objectives 1. Increase radius on southwest comer to improve turning ability for large vehicles including SLO Transit buses. 2. Install ramp that will meet Americans with Disabilities Act(ADA)and State requirements. 3. Relocate or underground utilities and storm drain§that are in conflict with improvements. 4. Coordinate work with private development to take advantage of one-time construction and potential costs savings. Existing Situation The existing comer of Foothill and Tassajara has not been upgraded to current ADA standards. Although the City has upgraded many comers in the vicinity of this location, the southwest comer of Foothill/Tassajara has been deferred due to a high degree of utility conflict and other infrastructure that would make the improvements very expensive. The existing handicap ramp does not meet current ADA standards and the small radius makes turning for larger vehicles problematic. In 2007, SLO Transit (which had used this intersection for quite some time) relocated its existing transit routes one block west because the small radius was causing conflicts with cars exiting Tassajara onto Foothill. This conflict was being encountered more frequently which caused the bus routes to get progressively further behind schedule. The relocation of the routes to the new section of Ramona Drive caused concern from adjacent residents, who voiced numerous complaints to Council about having the bus routes on their block. Late in 2007, a proposal was submitted for redevelopment of the property on the southwest corner(399 Foothill) that included some retrofit of the adjacent public right of way. The full scale improvement of the comer was beyond the nexus of the development intensity so requiring all improvements be made by the development is not possible. Instead staff has worked with the developer to pursue a cost sharing proposal to complete the improvements as part of the redevelopment and complete both private and public improvements concurrently. As pan of this arrangement, the developer agreed to dedicate the right of way for the necessary improvements to the City at no charge. On April 15". 2008 the Council reviewed an appeal of the Architectural Review Commission approval of the project and ultimately determined to uphold the appeal without prejudice to allow the applicant the opportunity to revise the project subject to Council suggestions that could make the project more consistent with the neighborhood. The Council also directed staff to return with a 2008-09 Capital Improvement Program request to complete this work. Goal and Policy Links 1. 2007-09 Major City Goal: Neighborhood Wellness 2. Circulation Element — Policy 8.3 — The City will facilitate public participation in the planning, design and construction of major changes to the street network. 3. Circulation Element—Policy 8.6—Street projects should be implemented as development occurs. E-6 C4-3 J ATTACHMENT 1 IMPROVEMENTCAPITAL PROJECT DESCRIPTIONS Project Work Completed A preliminary design and construction estimate to complete the work has been solicited from the developer's engineer. Environmental Review The project will be completed in tandem with the adjacent development project which has received environmental review and approval. As such,no formal environmental review will be required. Project Constraints and Limitations 1. Staff will need to coordinate with nearby residents to alert them when improvements will commence and potential temporary closures of the sidewalk will begin. 2. The project will be dependent on construction improvements and timing of the adjacent private development project which will complete the public improvements at the same time as on-site work is constructed. 3. Utility relocation or undergrounding costs may exceed current estimations. 4. Relocation of the traffic signal equipment on the comer may be more costly if the existing conduit has been damaged and can not be reused for rewiring of the intersection. Stakeholders Stakeholders include area residents, the adjacent property owner, utility companies and SLO Transit. Project Phasing and Funding Sources Pro'eet Costs bv Phase Project Costs Budget-to-Date 2008-09 Total Right of Way - Design - t0,000 10,000 Construction 115,000 115,000 Total - 125,000 125,000 Note:The above estimates assume the right of the way for the project will be dedicated by the adjacent property owner. Project Funding by Source General Fund Key Project Assumptions Cost projections are based upon an estimate provided to Development Review staff from the private development's engineer. These estimates also assume that the development project on the southwest comer of the intersection will submit a revised project and will ultimately receive approval by the Council and that the applicant will still be amenable to a cooperative project. The right of way modification project could become more costly if the utility relocation costs are higher than expected (beyond City control) and if the existing traffic signal conduit cannot be reused to rewire the E-7 C4-4 ATTACHMENT 1 CAPITAL IMPROVEMENT • • ■ PROJECT DESCRIPTIONS intersection. The project costs have been estimated assuming the improvements will be incorporated into the construction efforts of the adjacent private development project and the City will reimburse these efforts. Project Manager and Team Support Project Manager Project management will come from the Development Review staff with assistance from the City Engineer and inspection team. Project Team The project team will consist of staff from Public Works Engineering, Transportation and Development Review. Alternatives 1. Deny the Project Denying the project will miss a one-time only opportunity to share costs with the adjacent development for constructing the improvements. If the City has to complete the improvements at a later time the costs may be increased and the location will undergo construction twice. 2. Defer or Re phase the Request. Deferral will essentially be the same as denial of the project as operational and cost concerns will still be prevalent. 3. Do the project on our own. If the subsequent development project is not submitted or approved (and/or the developer is no longer in a cooperative mood) the City will need to complete the improvements. This will include the right-of-way (ROW) cost — and probably higher design, construction and construction management costs. Operating Program Public Works Maintenance staff will maintain the improvements when complete. There will be no impact to the maintenance budget since the comer sidewalk,curb and gutter and signal are all maintained by the City currently. Project Effect on the Operating Budget None. E-8 C4-5 ATTACHMENT 2 9 0 2 1 I i r NEW 25' t RADIUS I i l < _ XISTING 15' RADIUS TASSAJARA 7 � I FOOTHILL & TASSAJARA TRAFFIC SIGNAL MODIFICATION SCHEMATIC DESIGN C4-6 ATTACHMENT 3 G�. MIRA SOL z cls � m 7A 9�c'y H o WESTMONT -- _ WESTMONT �p MARLENE DALY �r%A; E J CT LOCATION HIGHLAND o DARTMOUTH WARREN TOLOSA HIGHLA Q r DONNA a F �✓ o � SqN CRgfG u � y QBp �C ROMA z CE IH y0 F q �O FOOTHILL FOOTHILL OfOf w RAMONA ; DESER S -i Q ROUGEOT DEL MARif o RAMONA MEINECKE Q CATALINA LUNETA Q LUNETA % Q o 0 Q Q m w ��c�P N SERRANO w m HURRAY U s z 5Q WEST y W QD FOOTHILL TASSAJARA TRAFFIC SIGNAL MODIFICATION VICINITY MAP -7 ATTACHMENT 4 Sim SAN LUIS OOISPO POLICE OEPARTMENT 200 annual. 4awWzw Kli city o� San luta OBispo1C�`.''rr.0 �ZE�Q San Luis Obispo Traffic Engineering Division & Police Department September 2009 C4-8 ATTACHMENT 4 z w U Q o; 0 o N ^Y' L a � ° � e ° o _ z � L z o Q = z z° 0 W U U � z W U c � Q v, 0 c � CS ♦+ W L � 00 to O On T QI �I�ji Io C4-9 . v �ATTACHMENT 4 pOp N c9 O poO � tp O O O� co y O m O O O O C c O N pl b ccn � b MOM O t"1 17D cn t. N t71 t0 b Of 01 tOto co H m eHt�� a000p0 0C co DMOO (DO p0 w0000 O Z Z toeyOr• Ot`! t� t. OcoOlt� � c+) 0 ^co JOf. OI w N P N r N 01 lo O 01 O Of Oj b ^ co ^11 QmI cn c 0o � o °r° �oc � °° �IOQ �I 3 c0 c7 n N .� N � th Oi O .- 'R N Z h Q — m O O co O O O r' O W Z22 °DM2 .- N � oto � oc�oM � Zgo � 0 � � N N N m M O e► N A to c7 0) h to N n M N a 1A O OD t7D tD m 1n to to Q C7 M to N N N O C O 6 6 6 6 6 6 0 0 0 0 a 0 0 a O O P M to N O M O r CO r- O O to CO 1T p O O E jai O O Of V c n O n O tO O O co t0 C) 0 0 O 7 O (0 10 M tO m CR f` N t0 to M O N to to W c7 c0 r to c) le a 0 0 to � N h 0 to P.- M N N � N N N cv1 N M cM M CM c) R _ to � C o •a to c0 A V to Cf co to m to to M to to m a y M m M O V U N 'p m m m N r m L. c O ° cc `� CL 0 owo E @ — lQ @ C O C J m to oB m 3 E m m o O c N O CO c v m m m Li M c °� 3 m ad Z F g m of c io a ,c c ,t3 v°, t=� ccp c CA m O A o6 ca laps a3 0 D cc a y 0 m to c -co c to L ot1 @ ` cd E E ' W O: od m c F- ad d ' QO' °!S a6 y cn 0 0° a tr' c °ts E m c m C Q �o pia B o o p m $ o .m > mvx,� V = tvgm � � -1n. 2wa � mo is v O 'a v v -CDo J 10 c c c c c M A to r a N w it 'LO O O O O O O m d Z Z Z 2 Z Z Z CO n a0 to r r T r r r r T r r e4-io