HomeMy WebLinkAbout09/06/2011, C 2 - HIGUERA SEWER LINER, SPECIFICATION NO. 91068 o council MnegNt, 9i6i2011 j ac Enda aEpoat CITY OF SAN LUIS OBISPO FROM: Jay D. Walter, Director of Public Works Prepared By: Manny Guzman, Engineer II SUBJECT: HIGUERA SEWER LINER, SPECIFICATION NO. 91068 RECOMMENDATIONS 1. Approve plans and specifications for the"Higuera Sewer Liner, Specification No. 91068". 2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bid is within the Engineer's Estimate of$1,024,000. DISCUSSION Background Replacement of sewage collection pipes is an ongoing program to replace aging and deteriorating infrastructure. This program has several objectives: 1) Ensure reliable removal of waste; 2) Reduce the need for emergency repairs; 3) Reduce the need for preventive maintenance; and 4) Ensure uninterrupted sewage flow without health hazard or effluent leakage. The project extends down Higuera Street from the intersection of Marsh Street to just below Bridge Street. Due to the recent reconstruction of a portion of Higuera Street's pavement as part of the Highway 227 Rehabilitation, cure-in-place pipe (CIPP) polyester lining of the existing sewer pipe is being specified in lieu of traditional open trench replacement methods. CIPP lining of the existing pipe will result in a reduced construction period as compared to traditional open trench replacement construction, and it will be less disruptive to traffic, residents, and businesses. The proposed project will line 5,100 feet of existing sewer pipe. The existing system has been identified by City staff as being at the end of its useful life. Also included in this project is the rehabilitation of fourteen sewer manholes. Manholes will be rehabilitated with a polyurethane elastomer that will repair and protect the existing structures from the corrosive environment of the sewer system. Construction for this project is scheduled to occur during the night. Staff anticipates that by completing construction during the night, the project will be completed faster and with less inconvenience to the public and businesses. Experience and Reference Requirements The CIPP installation process for sewerline rehabilitation has many advantages in this situation and it requires a contractor with specific experience and expertise to complete this work. A contractor with limited CIPP installation experience could damage the sewer system, cause sewage spills, and increase public inconvenience during the installation process. C2-1 Higuera Sewer Liner, Specification No. 91068 Page 2 For these reasons, staff is planning to request the contractors to submit references documenting their experience. To comply with a recent legal decision, staff will be using a responsibility review to determine that experience requirements have been met. Public Works staff will be working with the City Attorney's office to ensure proper protocols are used. Staff is requesting the Director of Public Works be authorized to complete responsibility / qualification hearings in order to determine if the lowest responsive bid was submitted by a responsible contractor capable of completing this specialized work. The hearings will allow any contractor initially determined by the project manager to not have the necessary experience, to provide information to the Director as to why their experience is adequate. CONCURRENCES This project is exempt from environmental review since it is a maintenance and replacement project and a Notice of Exemption has been filed through the Community Development Department. FISCAL IMPACT This project is included in the 2011-13 Financial Plan,pages 3-90 to 3-94. In the 2011-12 project list, $1,130,000 has been identified for this project. The Collection System Improvements Master account (90239) currently has a balance of $2,512,644. A budget amendment request will be processed to transfer the appropriate project funding from the master account at the time of contract award. Higuera Sewer Liner Project(91068) Engineer's Estimate: $1,024,000 Contingencies: $102,000 Material Testing: $3,250 Printing and Misc: $750 Total Project Estimate $19130,000 ATTACHMENT Vicinity Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Higuera Sewer Liner Plans and Special Provisions \\chstore4\Team\Counci1 Agenda Reports\Public Works CAR\2011\CIP\91068 Higuera Sewer Liner\91068 Advertise CAR.doc C2-2 ATTACHMENT. P090 QQ\� O°G � O O CIDO O q � �o PROJECT LOCATIONS P o O � gPny \S�y 9 BIANCHI Q�Q QOQ HIGH W DERCO ❑❑ Ej D I o Wui a w W a BRANCH r l 11 Y = SOUTH = � Y SOUTH c/i BRIDGE No o or Z:5 SFO ao X W o CORRIDA c m< c� C eR�OCE L Wm U o Z � W U Q N s NA BONir4 I o � HIGUERA SEWER LINER SPEC. NO. 91068 C2-3