Loading...
HomeMy WebLinkAbout04/04/1990, C-6 - SUBMITTAL OF PLANS AND SPECIFICATIONS FOR ""ROCKVIEW LIFT STATION REPAIR PROJECT - CITY PLAN NO. P-4" 'III„Alu„I��I1 MEETING GATE: '1� City of san Wis oBispo April 4 1990 COUNCIL AGENDA REPORT ITEM NUMBER: /f/ FROM: David F. Romismof /William T. Hetland Prepared By: John Moss Public Works Utilities Director Wastewater Division Director Manager SUBJECT: submittal of Plans and specifications for "Rockview Lift Station Repair Project - City Plan No. P-41R. ” CAO RECOMMENDATION: By resolution, approve plans and specifications, authorize staff to advertise for bids and authorize CAO to award contract if bids received are equal to or below engineer's estimates. BACKGROUND: On January 2, 1990 Council adopted Resolution No. 6742 waiving Purchasing Control Guidelines and authorized CAO to enter into contract for emergency repair of the Rockview lift station wet well. The wet well had been determined to be in a potential state of collapse through video inspection. With the rainy season upon us, staff was concerned that a rising water table could cause collapse of the wet well. This was the justification �- for proceeding under emergency procedures. On January 8, 1990 staff prepared a contract between the City and the firm of Advanced Manhole Technology for emergency repair of the wet well. This contractor had been selected based on a proposal for repair of the wet well submitted to the City on December 5, 1989. During the next six weeks the contractor failed to return the signed contract or respond to calls from the Wastewater Division Manager. On February 28, 1990 the contractor was notified in writing that the proposal and subsequent contract would no longer be considered by the City due to the failure to respond by the contractor. At this point, staff elected to return to normal purchasing and bidding procedures for repair of the wet well. This was decided for two reasons, the rainy season was nearly passed with little sign that a sufficient amount of rain would fall to cause collapse of the wet well, and normal purchasing/bidding procedures would afford the City some protection to insure that the project would be completed. Public Works Engineering staff has prepared Plans and Specifications for the project and is now ready to advertise. for bids. �}F y� tlV} tlR jl j ! C may, YJ a4L Q [AAR 2 3 1990 CITY CLERK __ i����►�N�mIIiIII�i�l ��y��l MY Of San_MIS OBISPO COUNCIL ACENOA REPORT Rockview Lift Station Repair, City Plan No. P-41R April 4, 1990 Page 2 ALTERNATIVES: 1. Approve plans and specifications as submitted, authorize staff to advertise for bids and authorize CAO to award the contract if bids received are below engineer's estimate. 2. Do not approve plans and specifications at this time. Failure to proceed with this project in a timely fashion will increase the probability of catastrophic failure of the wet well. FISCAL IMPACT: Engineers estimate: Repair of wet well $37, 000. 00 Contingencies $3, 000. 00 Council approved funding for this project in the 1989-91 Financial Plan (Pg. E-7) . This project is being completed as one of several CIP projects under the heading of Replacement of Sewer Collection Mains. A total .of $250, 000 has been budgeted for these projects in the 1989-90 fiscal year and $90, 000 has been set aside for repair of the wet well. i - i CONSEQUENCES OF NOT TARING THE RECOMMENDED ACTION: Not taking the recommended action will increase the probability of failure of the wet well before it can be repaired. Wet well failure could result in wastewater discharge to streets and surrounding properties, exposing the community to possible health threats. The City may also be subject to fines from the State should a spill occur. Repair of the Laguna lift station wet well after failure cost the City $117, 000. RECOMMENDATION: By Resolution, approve plans and specifications for "Rockview Lift Station Repair Project-City Plan No. P-41R11 , authorize staff to advertise for bids and authorize CAO to award contract if successful bid is equal to or below engineer' s estimate. Attachment: Draft. Resolution rvwwp4lr.wp I RESOLUTION N0. (1990 Series) A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO APPROVING PLANS AND SPECIFICATIONS FOR ROCKVIEW LIFT STATION REPAIR PROJECT-CITY PLAN NO. P-41R AUTHORIZING STAFF TO ADVERTISE FOR BIDS, AND AUTHORIZING CAO TO AWARD CONTRACT IF BID IS BELOW ENGINEER'S ESTIMATE WHEREAS, the Rockview lift station wet well has been thoroughly inspected and has been determined to be in need of repair to prevent possible collapse; and WHEREAS, the Rockview Lift Station Repair Project is required to provide uninterrupted sewage flow without health hazard to the citizens of San Luis Obispo; and WHEREAS, Council approved funding for this project in the 1989-91 Financial Plan on July 24, 1989. NOW, THEREFORE, BE IT RESOLVED the Council for the City of San Luis Obispo approve plans and specifications for the "Rockview Lift Station Repair Project-City Plan No. P-41R" (engineers estimate $37, 000) ; authorize staff to advertise for bids; and authorize City Administrative Officer to award contract if successful bid is equal to or below engineer' s estimate. On motion of - and on the following roll call vote: ' seconded by AYES: NOES: ABSENT: the foregoing Resolution was passed and adopted this da of April, 1990. y MAYOR RUN OUNIN ATTEST: CITY CLERK PAM VOGES L41.3 i Resolution No. (1990 Series) i APPROVED: PY A INISTRATIVE OFFICER AT FINANCE DIRECTOR UTILITIES DIRECTOR PUBLIC WORKS DIRECTOR W SWAT R DIVISION MANAGER A-2