Loading...
HomeMy WebLinkAbout06/06/1990, C-12 - SUBMITTAL OF PLANS AND SPECIFICATIONS FOR ""WASTEWATER TREATMENT PLANT DIGESTER # 1 - REPAIR, PHASE " ��N��pn�uiq�I�U or san Luis p MATING GATE 'w a C 'J COUNCIL AGENDA REPORT '�'NUMBER: 199 FROM: David F. Romero (/ William T. Hetland W Public Works Director Utilities Director PREPARED BY: John E. Moss Wastewater Division Manager SUBJECT: Submittal of Plans and Specifications for "Wastewater .Treatment Plant. Digester # 1 - Repair, Phase 1, City Plan No. P-38S". CAO RECOMMENDATION: By motion, approve plans and specifications for "Wastewater Treatment Plant Digester No. 1 - Repair, Phase 1, City Plan No. P-38S" and authorize soliciting of bids and contract award by the CAO, if the lowest responsible bid is within the engineer's estimate. Engineers estimate $41,000. DISCUSSION: Background On December 21, 1989, Council adopted Resolution No. 6732 (1989 series) , approving plans and specifications for "Anaerobic Digester Cleaning Project-City Plan No. P-38S11. This project has been identified as having three (3) phases as there are three digesters to be cleaned and repaired. Cleaning of Digester No. 1 (phase 1) was advertised for and bids were received and opened on January 11, 1990. The contract for cleaning of digester no. 1 was awarded on January 16, 1990. Cleaning of digester No. 1 has now been completed and staff is ready to proceed with the necessary repairs. An internal inspection of the digester has been completed and the required repairs identified. Completion of the required repairs will complete this phase of the project (phase 1) and staff will then proceed to phase 2, Clean and Repair Digester No. 2. Repair of the digester is required to ensure satisfactory operation and stabilization of the wastewater sludge. Repair consists of sand blasting and applying a protective coating to the interior of the digester to protect metal and concrete surfaces from corrosion associated with anaerobic digestion, and minor repair of the heat exchanger and gas mixing systems. 0uu1011W, 11 lU city of san Luis o81Sp0 NO COUNCIL AGENDA REPORT Digester No. 1 Repair, City Plan No. P-38S June 6, 1990 Page 2 An original engineer's estimate of $22,500 was provided for this project and as such CAO authorization to advertise for bids was sought and provided in April 1990. Bids were received and opened on May 10, 1990. Only one bid was received and the bid amount was $69,722. Because the bid exceeded the engineer's estimate three fold, staff has rejected the bid and has reevaluated the original engineer's estimate. The original engineer's estimate was based on the cost of a similar project five years ago, plus 65% for inflation. Staff has consulted with protective coatings manufacturers and application contractors in the derivation of the new engineer's estimate of $41,000. A significant increase in materials costs as well as stricter and well enforced. Occupational Health and Safety Administration (OSHA) regulations for work in confined spaces has resulted in the significant increase in cost for this type of work. Consequences of Not Taking the Recommended .Action Failure to complete the required repairs could result in violation of wastewater discharge requirements and structural deterioration of the digester. FISCAL I_MPACT: Engineer's Estimate: Sandblasting. . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .$20,000.-00 Interior Coating. . . . . . . . . . . . . . . . . . . . . . . .$14,000. 00 Remove, Modify and Reinstall Equipment . . . . .$ 3, 000.00 Grouting and Painting . . . . . . . . . . . . . . . . . . . . . .$ 1, 000.00 Comply with OSHA. . . . . . . . . . . . . . . . . . . . . . . . . . . .S- 2,000,00 TOTAL ENGINEER'S ESTIMATE $41,000.00 Contingencies @ lot . . . . . . . . . . . . . . . . . . . . . . . . . . ... .S 4.100.00 TOTAL PROJECT COST $45,100.00 Council approved funding for this project in the 1989-91 Financial Plan (Page E-7) . A total of $77,000 was approved for cleaning and repair of the three digesters. Funding for this project is from the Sewer Fund. Total engineer's estimate for cleaning of all three digesters was $60,500. Based on the cost of cleaning No. 1 digester, $15,850.00, staff anticipates remaining well within the estimated $60,500 for cleaning the three digesters. Staff does, however, anticipate that additional .funding will be required to complete the needed repairs. Sufficient funds do exist in the $77,000 approved to complete J- this phase of the project. Additional funding for the remaining phases is being sought in the 1990-91 Budget Adjustment. Request 4111110111111111l city of San .dIS OBISpo - aMMQ@ COUNCIL AGENDA REPORT Digester No. 1 Repair, City Plan No. P-38S June 6, 1990 Page 3 process in the amount of $70,000. Staff estimates that a total additional funding of $99,000 will be required to complete the repairs. The additional $29, 000 not being sought is recommended to be taken from funding approved for the 1990-91 fiscal year (Pg. E-7, 1989-91 Financial Plan) for overhaul of Clarifier No. 1. The overhaul of clarifier No. 1 has been delayed until the 1991- 92 fiscal year to coincide with the time the clarifier will be taken off line during the Treatment Plant Improvements project. This will minimize the treatment impacts of having the clarifier out of service. Additional funding will be sought for overhaul of the clarifier in the 1991-92 Budget Process. RECOMMENDATION: By motion, approve plans and specifications for "Wastewater Treatment Plant Digester No. 1 - Repair, Phase 1, City Plan No. P-38S" and authorize soliciting of bids and award by the CAO, if the lowest responsible bid is within the engineer's estimate. Engineers Estimate $41,000. Attachments: Bid Summary Plans and Specifications available in Council Office for inspection. z W W � a � 3 Q z m d o � 3 dQ J MJ- W t U EL �- �a }- ~ 0 � 0 V � � 0 f a � V) u =a 0 z N � 00 N p�% o cZ. V O J � e w N N -~ zlq' �a ( [ 1 . 1 i Q V) Q gi a 9040 4O O o Z W � o � a � V q I=-1 ��, z O (� r' z W Fw N o za, O V NN Z •. z J LLJ < Q Q (� o a z a z ow o ulh � 0 z fe m - - L Qf- m It m w