Loading...
HomeMy WebLinkAbout06/19/1990, 10 - CHANGE ORDER #10 FOR TENANT IMPROVEMENT IN THE MARSH STREET PUBLIC PARKING STRUCTURE, CITY PLAN NO. TE OR III�'41�ID city of san-�_aIs OBISPO - Juunnee"19,� 1990 A COUNCIL AGENDA REPORT MM"` FROM: David Romero, PublicWorksDirector Wayne Peterson, City Engineer Thomas Gingg, Engineering Field Supero or SUBJECT: Change Order #10 for tenant improvement in the Marsh Street Public Parking Structure, City Plan No. M-41D CAO RECOMMENDATION: By motion, approve the contract change order for tenant improvement to the Marsh Street Public Parking Structure in the amount of $386,697.08, and authorize the transfer of $257,000 from Capital Control Account to the Construction Account. DISCUSSION: On December 20, 1988 (Resolution No. 6556 - 1988 Series) , the City approved a lease agreement with Charles Ford Company (Riley's) for the commercial retail space in the Marsh Street Public Parking Structure. The lease rental rate is based on the City installing tenant improvements. At the time the rental agreement was worked out, the construction plans for the parking structure were in final stages of plan check, and it was not possible to design the tenant improvements to be included in the original bid package without delaying the entire project several months. This implied that the tenant improvements would be constructed as a change order during the construction of the main parking structure, or alternatively by a separate bid after completion of the structure. Because of the importance of completing the tenant improvements in a timely fashion, staff opted for the change order approach. On October 9, 1989 (Resolution 6699 - 1989 Series) , the City authorized a contract for design of certain tenant improvements within the parking structure. The tenant improvement plans were completed and staff requested a proposal from Madonna Construction Company to construct the improvements. Staff received the proposal on April 17, 1990. After considerable revision and negotiation, a second bid was received on May 22, 1990. The tenant improvements include both those which are City responsibility in the amount of $343,618.62 and those which are Riley's responsibility in the amount of $43,078.46. Staff proposes to issue a change order to Madonna Construction for the entire amount, with Riley's reimbursing the City for Riley's share as the work progresses. A formal agreement (Exhibit B) reflecting this has been prepared and submitted for execution by Riley's. RECEIVED SAN LUIS 0B13P ,CA /0 •� QZ1�� city of san as owpo 0 som COUNCIL AGENDA REPORT Riley's Page Two The "tenant improvements" which the City will provide are those which are basic to the shell of the building such as walls, floor, basic electric, heating, ventilating and airconditioning, plumbing and exterior doors. Riley's is responsible for wall finish, false ceilings, lighting and interior partitions, and similar appointments. The basic split of responsibility was worked out many months ago, with supplemental information provided more recently by Bruce Fraser, architect for the project. One area which was not clearly defined in the agreement is the level of improvement to be provided by the City in the restrooms. This week staff and Riley's agreed to equally share this $10,959.15 cost. ALTERNATIVES: 1. Reject change order, advertise for competitive bids, with contractor to move in after Madonna Construction has completed the parking structure. Advantages: A competitive bid should result in a lesser cost than a change order. Disadvantages: A different contractor would have to wait until Madonna Construction completes the structure in September before moving in, thus delaying completion of the improvements until perhaps November. Riley's has a great deal of additional store improvements and merchandise stocking to do before it can open. A two month delay would mean that Riley's would miss the Christmas season. They are already extremely unhappy with having missed the fall season. FISCAL IMPACT: The original contract for the parking structure was $3,621,600. The work done under this CCO will cost $386,697.08. There is $85,000 in the design account (051-9863-092-571) that can be transferred to construction account (051-9863-092-572) . $257,000 will need to be transferred from the Capital Control Account to the Construction Account. $43,078.46 will be reimbursed to the City upon completion of the improvements. The transfer of $257,000 from the Capital Control Account will mean that the account may require augmentation when the City chooses to purchase land for a third parking structure site. The amount of shortfall in this account cannot be determined at this time because a property has not been identified and appraised. � �Ilif�pn �i1 city of sat. -als OBlspo COUNCIL AGENDA REPORT Riley's Page. Three Council should be aware that the parking fund is currently operating with a negative cash flow. This was discussed with you at the study session February 26, 1990. Staff is working on proposals to correct that situation and will be reporting to you on this in the near future. STAFF RECOMMENDATION: Staff is very sympathetic to Riley's concerns regarding the extensive delays in completing the structure. Accordingly staff feels that the change order approach, even with its implied increased cost, is the preferred alternative. Attachment: Division of Responsibility Agreement rileys/dfr#22 r� EXHIBIT A DIVISION OF RESPONSIBILITY FOR LEASE SPACE IMPROVEMENTS FOR RILEYS DEPARTMENT STORE Revised May 23, 1990 ITEM CITY RILEYS 03600/Cementitious Grout 21450.00 0.00 05500/Miscellaneous Metals 3,680.00 0.00 06200/Finish Carpentry 6.00 49025.00 07200/Insulation 69204.25 0.00 08100/Metal Doors, Frames 117.59 11981 .31 08200/Wood Doors 97.05 19635.91 08700/Door Hardware 190.50 392.1.1.22 09250/Metal Framing, Gypsum Drywall 332384.40 2499.10.20 09500/Resilient Flooring/Wainsooat 0.00 19388.05 09500/Acoustic Ceiling Treatment 179294.85 0.00 10150/Toilet Partitions 0.00 49634.50 10400/Signage. 0.00 131. 10 10522/Fire Extinguishers, Cabinets 0.00 815. 10 10800/Bathroom Accessories 0.00 1 ,599.65 4 15400/Plumbing 71776.65 49725.004t 15500/Fire Protection Sprinklers 169675.00 0.00 15600/Heating, Ventilating, Air Conditioning 1709120.65 0.00 16000/Electrical, Lighting, Alarm 80, 148. 10 0.00• TOTALS $3389139.04 $489558.04 +. 5,479.58 - 5,479.58 $ 343,618.62 S 43,078.46 6/6/90 NOTE: Because of unclear definition of "Commercial retail shell in conformance with industry custom and practice", Tom Donat and I agreed we would split cost of the 3 items listed. All relate to level of improvement in the bathrooms. $10,959.15 = $5,479.58 2 David Romero, Public Works Director C 10. PARKING STRUCTURE TENANT IMPROVEMENTS (ROMERO/M-41D) Staff is still working on report. To be distributed under separate cover. /00