Loading...
HomeMy WebLinkAbout07-21-2015 C7 Marsh-Higuera-California Sewerline ReplacementCity of San Luis Obispo, Council Agenda Report, Meeting Date, Item Number FROM: Daryl R. Grigsby, Director of Public Works Prepared By: Dan Van Beveren, Senior Civil Engineer SUBJECT: MARSH-HIGUERA-CALIFORNIA SEWERLINE REPLACEMENT, SPECIFICATION NO. 91186 RECOMMENDATIONS 1. Approve plans and specifications for the Marsh-Higuera-California Sewerline Replacement Project, Specification No. 91186. 2. Authorize staff to advertise for bids, and authorize the City Manager to award the contract if the lowest responsible bid is within the Engineer’s Estimate of $870,000. DISCUSSION Background Replacement of wastewater collection pipes is part of an ongoing program to replace aging, deteriorating, or otherwise troublesome sewer infrastructure. This program has several objectives, including, provide uninterrupted sewage flow, eliminate potential health hazards and/or effluent leakage, reduce the need for emergency repairs, and reduce maintenance requirements. Consistent with these program objectives, this project includes the replacement of sewer pipelines in the vicinity of California Boulevard and Higuera Street and the removal of two sewerlines beneath the railroad tracks. Project This project is located on portions of California Boulevard, Higuera Street, Marsh Street, and Grove Street (see Attachment 1). Included within the project area are two locations where the existing sewerlines cross under the railroad tracks. In recent years, there has been an ongoing effort to eliminate existing railroad crossings from the sewer system wherever possible due to potential problems which could arise in the event of a pipeline failure at these crossings. In September 2013, a study by Filippin Engineering examined the feasibility of eliminating the existing sewerline railroad crossings at Higuera Street and at Marsh Street. The study concluded that it would be feasible to eliminate these crossings by directing the sewer flow away from the railroad tracks and into a new sewer collection line on California Boulevard. Coordination with Other Construction Activity In June 2015, construction began on the California Boulevard and Johnson Avenue 16-inch Waterline Replacement project with a scheduled completion of December 2015. Both the waterline replacement project and the sewerline replacement projects include construction on California Boulevard between Monterey Street and Marsh Street. The strategy of bidding this sewer replacement project prior to the completion of the waterline project will provide flexibility in coordinating construction work on these two blocks of California Boulevard. Additionally, July 21, 2015 C7 C7 -1 Marsh-Higuera-California Sewerline Replacement Page 2 work hours on California Blvd are limited to occur between the hours of 9:00 am and 2:00 pm due to the proximity of San Luis Obispo High School. These measures are proposed in an effort to minimize the public inconvenience. ENVIRONMENTAL REVIEW The Community Development Department has issued a Notice of Exemption pursuant to Section 15302 (Replacement or Reconstruction) of the California Environmental Quality Act Guidelines. FISCAL IMPACT The project is included in the 2015-17 Financial Plan, Appendix B, which budgets $960,000 for the construction of this project in 2015-16. The Wastewater Collections System Construction Master Account currently has a balance of $1,732,348, and an additional $1,456,000 has been programmed for the 2015-16 fiscal year. A budget amendment request will be completed at the time of contract award to transfer funding into this project’s account. The estimated project costs are shown below: Total Engineer’s Estimate:$870,000 Contingencies:$85,000 Materials Testing:$4,000 Printing & Misc. Project Costs:$1,000 Total Estimated Project Cost $960,000 Marsh-Higuera-California Sewerline Replacement, Spec. No. 91186 ATTACHMENT Site Map AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE Plans and Specifications \\chstore7\team\council agenda reports\2015\2015-07-21\marsh-higuera-california sewerline replacement\car 91186 adv.docx C7 -2 C7 -3 THIS PAGE IS INTENTIONALLY LEFT BLANK C7 -4