HomeMy WebLinkAboutr10313masterfeescheduleupdateRESOLUTION NO . 10313 (2011 Series )
A RESOLUTION OF THE CITY OF SAN LUIS OBISP O
UPDATING THE CITY'S MASTER FEE SCHEDUL E
WHEREAS,it is the policy of the City of San Luis Obispo to review service charges o n
an ongoing basis and to adjust them as required to ensure that they remain adequate to achiev e
adopted cost recovery goals ; and
WHEREAS,fees are adjusted as required to ensure they remain equitable and adequat e
to cover the cost of providing services ; and
WHEREAS,an analysis of the Building and Safety fees was performed for 2011-12 an d
presented to the Council for its consideration on August 16, 2011 .
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Lui s
Obispo that City service charges and rates for Building and Safety services are hereby updated a s
set forth in the Exhibit attached hereto, with an effective date for of January 1, 2012 .
Upon motion of Council Member Carter, seconded by Vice Mayor Ashbaugh, and on th e
following vote :
AYES :
Council Members Carter and Smith, Vice Mayor Ashbaugh and Mayor Mar x
NOES :
Council Member Carpente r
ABSENT : None
The foregoing resolution was adopted this 1 st day of November 2011 .
ATTEST :
R 10313
CITY OF SAN LUIS OBISP O
MINOR &MISCELLANEOUS PERMIT S
The fees listed below are stand-alone fees . Additional Developemnt Review or Stormwater fees may apply .
Fee Activity
Fee Description Fee Unit Fe e
50% REDUCED FEES FOR SINGLE FAMILY RESIDENTIAL ENERGY SAVING UPGRADE S
Electrical service upgrade each $104 .5 0
Electric car charging system each $104 .50
Firepalce Insert/upgrade each $278 .5 0
Furnace/heater replacement each $104 .50
Graywater/Rainwater Harvesting System each $64 .5 0
Insulation/energy upgrade per project $100 .50
Re-roof with added ventilation per project $100 .5 0
Solar photovoltaic system per project $145 .00
Water heater replacement each $104 .5 0
Window retrofits (non-structural only)per project $169 .0 0
MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECT S
Balcony/Porch/Dec k
first 300 s .f .per project $95 1
ea add—'l 100 s .f _per project $9 7
Canopy / Awning per project $330
Cellular Tower / Antenn a
First Antenna / Tower each $782
each add'l antenna/ tower each $8 5
Antenna/Tower w/ Equipment Shelter each $570
Commercial Access Upgrade (ADA Compliance )
Site-work such as Ramps or Exterior each $1,02 1
Upgrades such as reception counter, registers, signage, etc .each $81 7
Commercial Coach Installation each $1,356
Demolitio n
Interior or garage - utlity building per project $38 7
Entire Building, residence or commercial per project $677_
Dry rot/Termite Repair per project $20 1
Fence or Non-Engineered Wall per project $582
Fireplace Retrofit / Chimney Repair per project $55 7
Flag, Light, or Sign Pole - Install / Replace per project $692
Foundation Replace / New (includes piles, piers, or foundation-only systems under existing or partia l
construction)per project $1,160
Foundation Repair (includes piles, piers, or foundation-only systems under existing or partia l
construction)per project $580
Garage Conversio n
First 500 s .f .per project $773
Ea add'l 100 s .f .per project $97
Grading _
1,000 CY or less _per project $677
1,001 - 10,000 CY per project $870
>10,001- CY per project $1,06 3
Paint Booth per project $870
Partition _per project $64 7
Patio Cove r
Open _
-
per project $58 2
Enclosed per project $1,01 5
Pool / Spa - Commercial per project $96 6
Pool / Spa - Residential per project $77 3
_Re-Roof - Residential per project $20 1
Re-Roof - Commercia l
First 300 s .f._per project $38 7
__Ea add'l 100 s .f .per project 9 7
Roof Structure Replacement
Misc Page 1 of 4
CITY OF SAN LUIS OBISP O
MINOR &MISCELLANEOUS PERMITS
The fees listed below are stand-alone fees . Additional Developemnt Review or Stormwater fees may apply.
Fee Activity
Fee Description Fee Unit Fee
First 300 s .f .per project $87 0
Ea add'l 100 s .f.per project $11 6
Retaining Wal l
_Engineered per project
First 100 I .f .per project $1,06 3
Ea add'l 100 I .f.per project $9 7
Non-Engineered per project $67 8
_Stair Repair / Replace per project $87 0
Shear Wall / Steel Support Column - stand alone (not part of a building permit)per project $77 3
Siding / Stucco per project $36 7
Sign
Wall per project $29 0
Monument per project $51 6
Solar / PV System - Commercial / Multi-family per project $67 7
Store Front/Fagade Alterations : Minor per project $87 0
T-Bbar Ceiling/Furred Ceiling - stand alone (not part of a building permit)per project $58 0
Trash Enclosure per project $96 6
Vapor Recovery Systems / Service Station Upgrades (up to 3)per project $48 3
Window / Door - Non-Structura l
First 10 windows / doors per project $33 8
each add'l 10 windows/doors per project $1 6
Window / Door - Structura l
First 10 windows / doors per project $49 9
each add'l 10 windows/doors per project $6 5
Minor Repairs (for items otherwise not listed, for the purpose of reconstruction, renewal, o r
maintenance of any part of an existing structure - requiring not more than two inspections)per project $26 5
Minor Code Corrections per project $20 1
Minor Lease Space Improvements Prior to Tenant Improvement per project $1,16 0
MECHANICAL, PLUMBING AND ELECTRICAL PERMITS (Not associated with an existing building permit)
ADMINISTRATIVE AND MISC . FEES
Minimum Permit Issuance (includes travel and documentation)$209_
Appeal of Building Official Decision per project $966
Handicap Board of Appeals per project $966
Fire Permit Handling Fee per project $387
Supplemental Plan Check per project $193
Supplemental Inspection per project $193
After Hours Inspection (Scheduled, 2 hour minimum)per project $387
Preliminary Project Consultation / Code Analysis (per hour)per project $193
MECHANICAL PERMIT FEES
Stand Alone Mechanical Plan Check (per 1/2 hour)$97
UNIT FEES :
A/C (Residential) - each $64
Furnaces (F .A .U ., Floor)$6 4
Heater (Wall)$6 4
Refrigeration Compressor/Condenser _$8 1
Boiler $8 1
Chiller $8 1
Heat Pump (Package unit)$4 8
Heater (Unit, Radiant, etc .)$48
Mist Page 2 of 4
CITY OF SAN LUIS OBISP O
MINOR &MISCELLANEOUS PERMITS
The fees listed below are stand-alone fees . Additional Developemnt Review or Stormwater fees may apply .
Fee Activit y
Fee Description Fee Unit Fee
Air Handler $4 8
Duct Work only $4 8
Evaporative Cooler $4 8
Make-up Air System $4 8
Vent Fan (Single Duct) - each $4 8
Exhaust Hood and Duct (Residential)$4 8
Exhaust Hood - Type I (Commercial Grease Hood)$9 7
Exhaust Hood - Type II (Commercial Steam Hood)$64
Walk-in Box/Refrigerator Coil $64
Miscellaneous Mechanical Items NOS (not otherwise specified)$64
Other Mechanical Inspections (per hour)$19 3
Mechanical Volume and Current Fee Analysis $5 9
PLUMBING/GAS PERMIT FEE S
Stand Alone Plumbing Plan Check (hourly rate)$19 3
UNIT FEES :
Fixtures (each)$48
Gas System Replace/Repair/Extend (First Outlet)$48
Gas Outlets (Each Additional)$6
Building Sewer $64
Grease Trap $48
Water Heater (First Heater)$64
Water Heater (Each Additional Heater)$1 6
Water Pipe Repair/Replacement $48
Drain-Vent Repair/Alterations $48
Solar Water System Fixtures (solar panels, tanks, water treatment equipment)$6 4
Graywater Systems (each)$12 9
Miscellaneous Plumbing Items NOS $6 4
Other Plumbing and Gas Inspections (per hour)$19 3
Plumbing Volume and Current Fee Analysis $5 8
ELECTRICAL PERMIT FEES
Stand Alone Electrical Plan Check (per 1/2 hour)$9 7
Add/Replace Service (not over 200 amps)$64
Add/Replace Service (over 200 amps)$9 7
New/Altered Circuit s
15 or 20 amp - Each 10 circuits (or fraction thereof)$48
25 or 40 amp circuits (each)$32
_50 to 175 amp circuits (each)$39
200 amp and larger circuits (each)$48
Temporary Service (each)$48
Generator Installation (each)$74
Miscellaneous Electrical Items NOS $6 4
Other Electrical Inspections (per hour)$193
Misc Page 3 of 4
CITY OF SAN LUIS OBISP O
MINOR &MISCELLANEOUS PERMIT S
The fees listed below are stand-alone fees . Additional Developemnt Review or Stormwater fees may apply .
Fee Activity
Fee Description Fee Unit Fe e
Electrical Volume and Current Fee Analysis $6 0
STORMWATER PLAN REVIEW &INSPECTIO N
Minor Projects : Non-structural commercial TI's, residential remodels and residential additions les s
than 500 SF and U occupancies (Garages and storage sheds) all with minimal grading activity
$25 4
_
Moderate Projects : Structural Commercial TI's and additions up to 5,000 sf, Residential addition s
over 500 SF, Change of Occupancy all with site grading work less than 1 acre
$1,59 5
Major Projects : New SFR's, New Commercial Buildings (additions over 5,000 SF), projects wit h
parcels of 1 acre or more
$3,383
Misc Page 4 of 4
CITY OF SAN LUIS OBISP O
BUILDING DIVISION USER & REGULATORY FEES
New Construction Fee Schedule - Plan Check Fees
Occupancy Type and Class Fee Unit
Fire Ratio Type I, II Fire Ratin Type IIA,III Fire Rating T pe IIB, IV,VB
Base Cost
Cost Per S .F .
Between
Thresholds
Base Cost
Cost Per S .F .
Between
Thresholds
Base Cost
Cost Per S.F .
Betwee n
Threshold s
LEVEL OF EFFORT 1 .5 1 .25 1
Commercial Uses - Structural (All newly constructed, added, or structurally
remodeled space for non-residential occupancies classified as CBC Group A, B, E ,
F, H, I, M, or other commercial occupancies not specifically addressed elsewhere i n
this Fee Schedule)
Square Footage:
500 per project $2,441 $1 .63 $2,035 $1 .36 $1,628 $1 .0 9
5,000 per project $9,766 $0 .49 $8,138 $0.41 $6,510 $0 .3 3
10,000 per project $12,207 $0.18 $10,173 $0.15 $8,138 $0 .1 2
50,000 per project $19,531 $0.10 $16,276 $0.08 $13,021 $0 .0 7_
100,000 per project 5 24,414 $0 .24 $20,345 $0.20 $16,276 $0 .1 6
Commercial Residential and Multifamily Residential Uses - (All newly constructed ,
added, or structurally remodeled space for residential occupancies classified a s
CBC Group R (except R-3), or other residential occupancies not specificall y
addressed elsewhere in this Fee Schedule )
Square Footage :
500 per project $2,686 5 1 .79 $2,238 $1 .49 $1,790 $1 .1 9
5,000 per project $10,742 $0 .54 $8,952 5 0 .45 $7,161 5 0 .36
10,000 per project $13,428 $0 .20 $11,190 $0.17 $8,952 $0.1 3
50,000 per project $21,484 $0 .11 $17,904 $0.09 $14,323 $0 .07
100,000 per project $26,856 $0 .27 $22,380 $0 .22 5 17,904 5 0.1 8
Duplicate Floor Plan Review- Commercial Residential and Multifamily Residentia l
Uses __
Square Footage :
_500 per project $1,772 $0 .39 $1,477 $0 .33 $1,182 $0.26
5,000 per project $3,545 $0 .14 $2,954 $0 .12 $2,363 $0.09
10,000 per project $4,254 $0 .03 $3,545 $0 .02 $2,836 $0.02
50,000 per project $5,317 $0.04 $4,431 $0 .03 5 3,545 $0.02__
100,000 per project $7,090 $0 .07 $5,908 $0 .06 $4,727 $0.0 5
Low and Moderate Hazard Storage - (All newly constructed, added, or structurally
remodeled space for storage occupancies classified as CBC Group S, or othe r
storage occupancies not specifically addressed elsewhere in this Fee Schedule )
Square Footage:
500 per project $2,441 $1 .63 $2,035 $1 .36 $1,628 $1 .0 9
5,000 per project $9,766 0.4 9_$$8,138 $0 .41 5 6,510 $0.3 3
10,000 per project $12,207 $0.18 $10,173 $0.15 $8,138 $0.1 2
50,000 per project $19,531 $0 .10 $16,276 $0.08 11 13,021 $0 .07
100,000 per project $24,414 5 0.24 $20,345 $0.20 $16,276 $0.1 6
Attached Accessory and Utility Uses - (All newly constructed, added, or structurall y
remodeled space for utility and accessory occupancies classified as CBC Group U .
or other utility and accessory occupancies not specifically addressed elsewhere i n
this Fee Schedule)
Square Footage :__
200 per project $622 $1 .41 $519 $1 .18 $415 $0 .94_
400 per project $905 $1 .32 $754 $1 .10 $603 $0 .88_
600 per project $1,168 $0 .29 $973 $0 .24 $779 $0 .1 9
1,000 per project $1,285 $0 .23
0 .58
$1,071
$1,460
$
$
0 .1 9
0 .49
$85 7
$1,168
$
$
0 .1 6
0 .393,000
Detached Accessory and Utility Uses - (All newly constructed, added, or structurall y
remodeled space for utility and accessory occupancies classified as CBC Group U .
or other utility and accessory occupancies not specifically addressed elsewhere i n
this Fee Schedule)
per project $1,752 $
Square Footage:_
200 per project $622 $1 .41 $519 $1 .18 $415 $0.94
400 per project $905 $1 .32 $754 $1 .10 $603 $0.88_
600 per project $1,168 5 0.29 $973 $0 .24 $779 $0.1 9
1,000 per project $1,285 $0.23 $1,071 $0 .19 $857 $0.1 6
3,000 per project $1,752 $0.58 $1,460 $0 .49 $1,168 $0.39
Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed ,
added, or structurally remodeled space for non-residential occupancies classified
as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specificall y
addressed elsewhere in this Fee Schedule where the interior is not completed o r
occupiable)-
Square footage:
500 per project $1,465 $0.98 $1,221 $0.81 $977 $0.6 5_
5,000 per project $5,859 $0 .29_$4,883 $0.24 $3,906 $0 .2 0___
10,000 per project $7,324 $0 .11 $6,104 $0.09 $4,883 $0 .07___
--50,000 per project $11,719 $0 .06 $9,766 $0.05 $7,813 $0 .0 4
100,000 per project $14,648 $0 .15 $12,207 $0.12 $9,766 $0 .1 0
Commercial Tenant Improvement - Non Structural - (Non-structurally remodele d
space for non-residential occupancies classified as CBC Group A, B, E, F, H, I . M,
or other commercial occupancies not specifically addressed elsewhere in this Fe e
Schedule where the structure is not altered)_Square Footage :
500 per project $1,221 $0 .81 $1,017 $0 .68 $814 $0 .54
5,000 per project $4,883 $0 .24 $4,069 _' $0 .20 $3,255 $0 .1 6
10,000 per project $6,104 $0 .09 $5,086 $_0 .08 $4,069 $0 .06_
_50,000 per project $9,766 $0 .05 $8,138 $0 .04 $6,510 $0 .03
100,000 per project $12,207 $0 .12 $10,173 5 0 .10 $8,138 $0 .08
Commercial Residential and Multifamily Residential Remodels - Non Structural -
(Non-Structurally remodeled space for residential occupancies classified as CB C
Group R (except R-3), or other residential occupancies not specifically addressed
elsewhere in this Fee Schedule)
_
Square Footage:_
500 per project $1,271 $0.85 $1,059 $0 .71 $847 $0.56_
5,000 per project $5,083 $0.25 $4,236 $0 .21 $3,389 $0.1 7_
10,000 per project $6,354 $0.10 $5,295 $0 .08 $4,236 $0 .06__
50,000 per project $10,166 $0.05 $8,471 $0 .04 $_ 6,777 $0.03
100,000 per project $12,707 $0.13 $10,589 $0 .11 $8,471 $0.08
Single Family Dwellings and Duplexes - (All newly constructed space for residentia l
occupancies classified as CBC Group R-3, Including custom builds and mode l
homes for tract master plans, or other similar residential occupancies no t
specifically addressed elsewhere in this Fee Schedule)
New Construction Fees-PlanCheck, 1 of 2
CITY OF SAN LUIS OBISP O
BUILDING DIVISION USER ®ULATORY FEE SNew Construction Fee Schedule - Plan Check Fees
Occupancy Type and Class Fee Unit
Fire Rating Type I, II Fire Rating Type IIA,III Fire Rating T •pe IIB, IV, V B
Base Cost Cost Per S .F.Between
Thresholds
Base Cost Cost Per S .F.
Between
Thresholds
Base Cost Cost Per S .F.
Between
Threshold s
LEVEL OF EFFORT 1 .5 1.25 1
Square Foota_ ge:
1,000 per project $2,911 $1 .94 $2,425 $1 .62 $1,940 $1 .292,500 per project $5,821 $0.39 $4,851 $0 .32 $3,881 _$0.26
4,000 per project $6,403 $0.44 $5,336 $0.38 $4,269 $0.2 9
6,000 per project $7,276 $0.73 $6,064 $0 .61 $4,851 $0.49_8,000 per project $8,732 $1 .09 $7,276 $0.91 $5,821 $0 .7 3
Duplicate Floor Plan Review - Single Family Dwellings and Duplexe s
Square Footage:_
1,000 per project $941 $0 .63 $784 $0.52 5 627 $0 .4 2
2,500 per project $1,881_$0.13 $568 $0.10 $1,254 $0 .0 8
4,000 per project $2,069 $0 .14 $1,724 $0.12 5 1,379 5 0 .0 9
6,000 per project $2,351 $0 .24 $1,960 $0.20 $1,568 $0 .1 6
8,000 per project $2,822 $0 .35 5 2,351 $0.29 $1,881 $0 .24
Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses _
Square Footage :
200 per project $187 $0 .42 $156 $0.35 $124 $0 .2 8_
-400 per project $271 $0 .39 $226 $0.33 181 $0 .26
600 per project $350 $0 .09 $292 $0.07 $$$234 $0 .0 6
1,000 per project,$385 $0 .07 $321 $0 .06 257 $0 .05
3,000 per project $526 5 0 .18 $438 $0 .15 $350 $0 .1 2
Structural Residential Remodels and Additions - (All newly constructed additions to ,
or structurally remodeled areas of, residential occupancies classified as CB CGroup R-3, or other similar residential occupancies not specifically addresse d
elsewhere in this Fe eSchedule)
Square Footage :
100 per project $801 $1 .93 $667 $1 .61 $534 $1 .28
500 per project $1,571 $3.14 $1,310 $2 .62 $1,048 $2.1 0
1,000 per project 5 3,143 $0.63 $2,619 $0 .52 $2,095 $0.42
1,500 per project $3,457 $0.63 $2,881 $0 .52 $2,305 $0.42
2,000 per project $3,771 $1 .89 $3,143 $1 .57 $2,514 $1 .26
Non-Structural Residential Remodels and Additions - (All newly constructe d
additions to, or non-structurally remodeled areas of, residential occupancie sclassified as CBC Group R-3, or other similar residential occupancies no t
specifically addressed elsewhere in this Fee Schedule )
Square Footage :
100 per project $574 $0 .41 $479 $0.34 $383 $0 .2 7
500
_
per project $737 $1 .28 $614 $1 .07 $491 $0 .8 6_
1,000 per project $1,379 $0 .28 $1,149 $0.23 $919 $0 .1 8
1,500 per project $1,517 $0 .28 $1,264 $0 .23 $1,011 $0 .1 8
2,000 per project $1,654 $0 .83 $1,379 $0.69 $1,103 $0 .5 5
Site Improvements - This includes substantial development of private parking lot swhich are processed separate of the structure and Include any combination of th e
following : Underground utilities, parking lot lighting, accessible path of trave l
analysis, grading, drainage and compliance with the City's parking and drivewa y
standards ._
Square Footage :
500 per project $823 $0 .55 $686 $0 .46 $549 $0 .37
5,000 per project $3,294 $0.16 $2,745 $0 .14 $2,196 $0.1 1
10,000 per project $4,117 $0 .06 $3,431 $_0 .05 $2,745 $0 .04
50,000 per project $6,587 $0.03 $5,489 $0 .03 $4,391 _$0.02
100,000 per project $8,234 $0.08 $6,861 $0 .07 $5,489 $0.05
New Construction Fees-PlanCheck, 2 of 2
CITY OF SAN LUIS OBISP O
BUILDING DIVISION USER & REGULATORY FEE S
New Construction Fee Schedule - Inspection Fees
Occupancy Type and Class Fee Unit
Fire Raft Type I, II Fire Ratin Type IIA, III Fire Rating T pe IIB, IV,V B
Base Cost
Cost Per S.F .
Betwee n
Thresholds
Base Cost
Cost Per S.F .
Between
Thresholds
Base Cost
Cost Per S.F .
Betwee n
Thresholds
LEVEL OF EFFORT 1 .5 1 .25 1
Commercial Uses - Structural (All newly constructed, added, or structurally
remodeled space for non-residential occupancies classified as CBC Group A, B, E ,
F, H, I, M, or other commercial occupancies not specifically addressed elsewhere i n
this Fee Schedule )
Square Footage :
500 per project $1,965 $1 .31 $1,638 $1 .09 $1,310 $0 .8 7
5,000 perproject
project_per
$7,862 $1 .18 $6,551 $0 .98 $5,241 $0 .7 9
$13,758 $0 .15 $11,465 _S 0 .12 $9,172 $0 .1 0
_
10,000
50,000 perproject $19,654 $0 .16 $16,378 $0 .13 $13,103 $0 .1 0
100,000 perproject $27,515 $0 .28 $22,930 $0 .23 $18,344 ,$0 .1 8
Commercial Residential and Multifamily Residential Uses - (All newly constructed ,
added, or structurally remodeled space for residential occupancies classified as
CBC Group R (except R-3), or other residential occupancies not specificall y
addressed elsewhere in this Fee Schedule)
Square Footage:
500 per project $2,948 $1 .97 $2,457 $1 .64 $1,965 $1 .3 1_
5,000
-
per project $11,792 $1 .77 $9,827 $1 .47 $7,862 $1 .1 8_
10,000 perproject $20,637 $0.22 $17,197 $0.18 $13,758 $0.1 5
50,000 per project $29,481 $0.24 $24,567 $0 .20 $19,654 $0.1 6
100,000 perproject $41,273 $0.41 $34,394 $0.34 $27,515 $0.2 8
Duplicate Floor Plan Review - Commercial Residential and Multifamily Residentia l
Uses
_
Square Footage:
500 per project $2,948 $1 .97 $2,457 $1 .64 $1,965 $1 .3 1
5,000 per project $11,792 $1 .77 $9,827 $1 .47 $7,862 $1 .1 8
10,000 per project $20,637 $0 .22 $17,197 $0.18 $13,758 $0 .1 5
50,000 per project $29,481 $0 .24 $24,567 $0.20 $19,654 $0 .16
100,000 per project $41,273 $0 .41 $34,394 $0 .34 $27,515 $0 .2 8
Low and Moderate Hazard Storage - (All newly constructed, added, or structurally
remodeled space for storage occupancies classified as CBC Group S, or othe r
storage occupancies not specifically addressed elsewhere In this Fee Schedule)_
Square Footage :
500 per project $1,965 $1 .31 $1,638 $1 .09 $1,310 $0 .87_
5,000 per project $7,862 $t18 $6,551 $0 .98 $5,241 $0.79
10,000 perproject $13,758 $0.15 $11,465 $0 .12 $9,172 $_0.1 0_
50,000 perproject $19,654 $0.16 $16,378 $0 .13 $13,103 $0.1 0
100,000 per project $27,515 $0.28 $22,930 $0 .23 $18,344 $0.1 8
Attached Accessory and Utility Uses - (All newly constructed, added, or structurall y
remodeled space for utility and accessory occupancies classified as CBC Group U ,
or other utility and accessory occupancies not specifically addressed elsewhere i n
this Fee Schedule)____
Square Footage:
_
_200 _per project $1,535 $0.75 $1,279 $0.62 $1,023 $0.50
400 perproject $1,684 $4.12 $1,403 $3.43 $1,123 $2 .7 4
'600 per project ' $2,507 $1.23 ' $2,089 $1 .03 $1,672 $0 .8 2
$0 .6 61,000 per project $3,001 $1 .00 $2,501 $0.83 $2,001_
3,000 perproject $4,995 $1.67 $4,163 $1 .39 3,330 $1 .1 1
Detached Accessory and Utility Uses - (All newly constructed, added, or structurall y
remodeled space for utility and accessory occupancies classified as CBC Group U ,
or other utility and accessory occupancies not specifically addressed elsewhere i n
this Fee Schedule)
_
Square Footage :
200 per project $1,407 $0 .58 $1,172 $0 .49 $938 $0 .39___
400 per project $1,523 $3 .87 $1,269 5 3.22 $1,016 $2 .58
600 perproject $2,297_$1 .15 $1,914 $0 .96 $1,531 $0 .77
1,000 per project $2,756 $0 .92 6 2,297 5 0 .77 5 1,837 5 0 .61
3,000 perproject $4,593 $1 .53 $3,828 $1 .28 $3,062 $1 .02
Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed ,
added, or structurally remodeled space for non-residential occupancies classifie d
as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specificall y
addressed elsewhere in this Fee Schedule where the interior is not completed o r
occupiable )
Square Footage:
per project $1,260 $0.77 $1,050 $0 .64 $840 $0.5 1500_
5,000 per project $4,717 $0.71 $3,931 $0 .59 $3,145 $0.47_
10,000 per project $8,255 $0.09 $6,879 $0 .07 5 5,503 $0.06
50,000 per project $11,792 $0.09 5 9,827 $0 .08 $7,862 $0.06
100,000 perproject $16,509 $0.17 $13,758 6 0 .14 $11,006 $0.1 1
_
Commercial Tenant Improvement - Non Structural - (Non-structurally remodele d
space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M ,
or other commercial occupancies not specifically addressed elsewhere In this Fe e
Schedule where the structure is not altered)
Square Footage :
500 per project 5 934 $0.67 5 779 $0.55 $623 $0.4 4_
5,000 per project $3,931 $0 .59 $3,276 $0.49 $2,621 $0 .3 9
10,000 per project $6,879 $0 .07 $5,732 $0.06 $4,586 $0.05
50,000 per project $9,827 $0 .08 $8,189 $0.07 $6,551 $0 .05
100,000 per project $13,758 $0 .14 $11,465 $0.11 $9,172 I $0 .09
Commercial Residential and Multifamily Residential Remodels - Non Structural -
(Non-Structurally remodeled space for residential occupancies classified as CB C
Group R (except R-3), or other residential occupancies not specifically addresse d
elsewhere in this Fee Schedule)
$
Square Footage :__
943 $0 .63 $786 $0 .52 $629 $0 .42500perproject__
5,000 per project $3,773 5 0 .57 $3,144 $0 .47 $2,515 $0 .38
10,000 per project $6,603 $0 .07 $5,502 $0 .06 $4,402 , $0 .05
50,000 perproject $9,432 $0 .08 $7,860 '6 0 .06_$6,288 $0.05
100,0_00 _perproject $13,205 $0.13 $11,004 $0 .11 $8,803 .$0 .09
Single Family Dwellings and Duplexes - (All newly constructed space for residential
occupancies classified as CBC Group R-3, including custom builds and mode l
homes for tract master plans, or other similar residential occupancies no t
specifically addressed elsewhere in this Fee Schedule)
New Construction Fees-Inspect, l of 2
CITY OF SAN LUIS OBISPO
BUILDING DIVISION USER & REGULATORY FEES
New Construction Fee Schedule - Inspection Fees
Fire Ratin Type I, II Fire Ratin Type IIA, III Fire Rating Type IIB, IV, V B
Occupancy Type and Class Fee Unit Cost Per S .F.Cost Per S .F.Cost Per S .F.
Base Cost Between
Thresholds
Base Cost Between
Thresholds
Base Cost Between
Threshold s
LEVEL OF EFFORT 1 .5 1 .25 1
Square Footage :_
1,000
_
per project $2,947 $1 .96 $2,456 $1 .64 $1,965 $1 .3 1
2,500 per project $5,895 $0.98 $4,912 $0 .82 $3,930 $0.65
4,000 per project $7,368 $2.21 $6,140 $1 .84 $4,912 $1 .47
6,000 per project $11,789 $2.95 $9,824 $2 .46 $7,860 $1 .96
8,000 per project $17,684 $2 .21 $14,737 $1 .84 $11,789 $1 .47
Duplicate Floor Plan Review - Single-Family-Dwellings and Duplexes _
Square Footage :
1,000 per project $2,947 $1 .96 $2,456 $1 .64 $1,965 $1 .3 1
2,500 per project $5,895 $0 .98 $4,912 $0.82 $3,930 $0 .6 5
4,000 per project 7,36 8_$$2 .21 $6,140 $1 .84 $4,912 $1 .47_
6,000 per project 11,78 9_$$2 .95 $9,824 $2.46 $7860 $1 .9 6
8,000 per project $17,684 $2 .21 $14,737 $1 .84 $11,789 $1 .4 7r
Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Use s
Square Footage :_
200 •er project $1,407 $0 .58 $1,172 $0 .49 $938 $0 .3 9_
400 per project $1,523 $3 .87 $1,269 $3.22 $1,016 $2 .58~.
600
_
per project $2,297 $1 .15 $1,914 $0 .96 $1,531 $0 .7 7
1,000 per project 5 2,756 $0 .92 $2,297 $0 .77 $1,837 $0 .61
3,000
_
per project $4,593 $1 .53 $3,828 $1 .28 $3,062 $1 .02
Structural Residential Remodels and Additions - (All newly constructed additions to ,
or structurally remodeled areas of, residential occupancies classified as CB C
Group R-3, or other similar residential occupancies not specifically addressed
elsewhere in this Fe e
Schedule)
_
Square Footage:
100 per project $1,166 $2.66 $972 $2 .22 $778 $1 .77
500 ---per project $2,231 $2.23 $1,859 $1 .86 $1,488 $1 .49
1,000 per project $3,347 $2.23 $2,789 $1 .86 $2,231 $1 .49
1,500 per project $4,463 $2.23 $3,719 $1 .86 $2,975 E 1 .4 9
2,000 per project $5,578 $2.79 0 4,649 $2.32 $3,719 $1 .86
Non-Structural Residential Remodels and Additions - (All newly constructe d
additions to, or non-structurally remodeled areas of, residential occupancie s
classified as CBC Group R-3, or other similar residential occupancies no t
specifically addressed elsewhere in this Fee Schedule)
Square Footage :
100 per project 5 1,061 $2 .65 $884 $2.21 $707 $1 .77
---500 per project $2,122 $2 .12 $1,768 $1 .77 $1,415 $1 .41_
1,000 per project $3,183 $2 .12 $2,653 $1.77 $2,122 $1 .41
1,500 per project $4,244 $2 .12 $3,537 $1 .77 $2,829 $1 .41
2,000 _ per project $5,305 $2.65 5 4,421 $2 .21 $3,537 $1 .77
Site Improvements - This includes substantial development of private parking lots
which are processed separate of the structure and include any combination of th e
following: Underground utilities, parking lot lighting, accessible path of trave l
analysis, grading, drainage and compliance with the City's parking and drivewa y
standards ._
Square Footage:
500 per project $651 $0.43 $543 $0 .36 $434 $0.2 9
5,000
_
per project $2,604 $0.39 $2,170_$0 .33 $1,736 $0.26
10,000 per project $4,557 $0.05 0 .04 $3,038 $0.0 3
50,000 per project $6,510 $0.05
$3,798
_$,425
$
$0 .04 $4,340 $0.0 3_
100,000 per project $9,115 $0.09 $7
5
,596 $0.08 $6,076 $0.06
New Construction Fees-Inspect, 2 of 2
CITY OF SAN LUIS OBISPO
BUILDING DIVISION USER ®ULATORY FEES
New Construction Fee Schedule - Total Fees (Plan Check and Inspection)
Occupancy Type and Class Fee Unit
Fire Ratin Type I, II Fire Bann Type IIA, III Fire Rating T pe IIB, IV,VB
Base Cost
Cost Per S .F.
Betwee n
Thresholds
Base Cost
Cost Per S.F .
Betwee n
Thresholds
Base Cost
Cost Per S .F .
Between
Threshold s
LEVEL OF EFFORT - PLAN CHECK 1.5 1 .25 1
LEVEL OF EFFORT - INSPECTION 1.5 1.25 1
Commercial Uses - Structural (All newly constructed, added,or structurally
remodeled space for non-residential occupancies classified as CBC Group A, B,E,
F, H . I, M,or other commercial occupancies not specifically addressed elsewhere in
this Fee Schedule )
Square Footage:_
500 _per project $4,407 $2.94 $3,672 $2 .45 $2,938 $1 .96
5,000 per project $17,627 $1 .67 $14,689 $1 .39 $11,751 $1 .1 1
10,000 per project $25,965 $0.33 $21,637 $0 .28 $17,310 $0.22
50,000 pet project $39,185 $0.25 $32,654 $0 .21 $26,123 $0.1 7
100,000 per project $51,930 $0.52 $43,275 $0.43 $34,620 $0.35
Commercial Residential and Multifamily Residential Uses - (All newly constructed ,
added,or structurally remodeled space for residential occupancies classified a s
CBC Group R (except R-3), or other residential occupancies not specifically
addressed elsewhere in this Fee Schedule)
Square Footage:
500 perproject $5,634 $3.76 $4,695 $3.13$3,756 5 2.5 0
5,000 per project $22,535 $2 .31 $18,779 $1 .92 _$15,023 ' $1 .54
10,000
_
per project $34,064 $0 .42 $28,387 $0.35 $22,7105 0.2 8
50,000 per project $50,965 $0 .34 $42,471 $0.29 $33,977 $0 .2 3_
100,000 perproject $68,129 $0 .68 $56,774 $0.57 $45,419 $0 .45
-Duplicate Floor Plan Review -Commercial Residential and Muttifamiy Residentia l
Uses __
Square Footage :
500 per project $4,721 $2 .36 $3,934 $_1 .97 $3,147 $1 .57 ,
_5,000 _perproject $15,337 $1 .91 $12,781 $1 .59 $_10,225 $1 .27
10,000 per project $24,890 $0 .25 $20,742 $0 .21 $16,594 $0.1 7
50,000
_
perproject $34,798 $0.27 $28,999 $0 .23 $23,199 $0 .1 8
100,000 per project $48,363 $0.48 $40,302 $0 .40 $32,242 9 0 .32
Low and Moderate Hazard Storage -(All newly constructed, added,or structurall y
remodeled space for storage occupancies classified as CBC Group S . or othe r
storage occupancies not specifically addressed elsewhere in this Fee Schedule)
Square Footage_
500 per project $$3,672 $2 .45 $2,938 $1 .964,407 $2.94_
5,000 per project $17,627 $1 .67 $14,689 $1 .39 $11,751 $1 .1 1
10,000 per project $25,965 $0 .33 $21,637 $0.28 $17,310 $0.22
50,000 per project $39,185 $0.25 $32,654 _ $0.21 $26,123 $0.1 7_
100,000 per project $51,930 $0 .52 $43,275 $0.43 $34,620 $0 .3 5
Attached Accessory and Utility Uses - (All newly constructed, added,or structurall y
remodeled space for utility and accessory occupancies classified as CBC Group U.
or other utility and accessory occupancies not specifically addressed elsewhere in
this Fee Schedule )
Square Footage:
200 per project $2,157 _$2 .16 $1,798 $1 .80 $1,438 $1 .44
400 perproject $2,589 $5 .43 $2,157 $4 .53 $1,726 $3 .62
600 per project $3,675 $1 .53 $3,063 $1 .27 $2,450 $1 .02
1,000 per project $4,286 $1 .23 $3,572 $1 .03 $2,857 $0 .82
3,000 per project $6,747 $2.25 $5,623 $1 .87 $4,498 $1 .50
Detached Accessory and Utility Uses - (All newly constructed, added,or structurall y
remodeled space for utility and accessory occupancies classified as CBC Group U ,
or other utility and accessory occupancies not specifically addressed elsewhere i n
this Fee Schedule )
Square Footage:-
200 perproject $2,029 $2.00 $1,691 $1 .66 $1,353 $1 .33_
400 per project $2,428 $5.18 $2,023 $4 .32 $1,619 $3.46
600 u perproject $3,465 $1 .44 $2,887 $1 .20 , $2,310 $0.96
1,000 perproject $4,041 $1 .15 $3,367 $0.96 $2,694 $0.77
3,000 per project $6,345 $2 .12 $5,288 $1 .76 $4,230 $1 .4 1
Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed ,
added,or structurally remodeled space for non-residential occupancies classifie d
as CBC Group A,B, E, F, H, I, M .or other commercial occupancies not specifically
addressed elsewhere in this Fee Schedule where the interior is not completed or
occupiable)
Square Footage :
500 per project $2,725 $1 .74 $2,270 $1 .45 $1,816 , $1 .1 6_
5,000 per project $10,576 $1 .00 $8,814 $0 .83 $7,051 $0 .6 7
10,000 per project $15,579 $0 .20 $12,982 $0.17 $10,386 $0 .1 3
23,511 $0 .15 $19,593 $0 .13 $15,674 $0-____50,000 per project _$
$20,772 $
0
0 .
.1
2 1100,000
Commercial Tenant Improvement - Non Structural - (Non-structurally remodele d
space for non-residential occupancies classified as CBC Group A,B, E, F, H, I, M ,
or other commercial occupancies not specifically addressed elsewhere in this Fee
Schedule where the structure is not altered)
perproject $31,158 $0 .31 $25,965 $0 .26
Square Footage:_
500 perproject $2,155 $1 .48 $1,796 $1 .23 $1,437 $0.99
5,000 per project $8,814 $0.83 $7,345 $0 .69 $5,876 $0.56
10,000 per project $12,982 $0.17 $10,819 $0.14 r$8,655 $0.1 1
50,000 perproject $19,593 $0.13 $16,327 $0 .11 $13,062 9 0.08_
100,000 per project $25,965 $0.26 $21,637 $0 .22 $17,310 9 0.1 7
Commercial Residential and Muhifamily Residential Remodels - Non Structural -
(Non-Structurally remodeled space for residential occupancies classified as CBC
Group R (except R-3),or other residential occupancies not specifically addresse d
elsewhere in this Fee Schedule )
Square Footage:_
500 per project $2,214 $1 .48 $1,845 $1 .23 $1,476 $0.9 8
5,000 perproject $8,856 $0 .82 $7,380 $0.68 $5,904 $0 .5 5
10,000 per project $12,956 $0.17 $10,797 $0.14 $8,637 $0 .1 1
50,000 per project $19,598 $0.13 $16,332 $0.11 $13,065 $0.0 8_
100,000 perproject $25,912 $0 .26 $21,593 $0.22 $17,275 $0 .17
New Construction Fees-Total, 1 of 2
CITY OF SAN LUIS OBISP O
BUILDING DIVISION USER ®ULATORY FEE S
New Construction Fee Schedule - Total Fees (Plan Check and Inspection)
Occupancy Type and Class Fee Unit
Fire Ratin3 Type I, II Fire Ratln Type IIA, III Fire Rating Type IIB, IV, V B
Base Cost
Cost Per S .F .
Between
Thresholds
Base Cost
Cost Per S .F.
Between
Thresholds
Base Cost
Cost Per S.F .
Between
Thresholds
LEVEL OF EFFORT - PLAN CHECK 1 .5 1 .25 1
LEVEL OF EFFORT - INSPECTION 1 .5 1 .25 1
Single Family Dwellings and Duplexes - (All newly constructed space for residential
occupancies classified as CBC Group R-3,including custom builds and mode l
homes for tract master plans,or other similar residential occupancies not
specifically addressed elsewhere in this Fee Schedule)
Square Footage :_
1,000 perproject $5,858 $3 .91 $4,882 $3 .25 $3,905 $2 .6 0
_ 2,500 per project $11,716 $1 .37 $9,763 $1 .14 $7,810 S 0 .9 1
4,000 ----perproject $13,771 $2.65 $11,476 $2 .21 $9,181 $1 .76
6,000 perproject $19,066 $3 .67 $15,888 $3 .06 $12,710 $2 .45__
8,000 per project $26,416 $3 .30 $22,013 $2 675 $17,610 $2 .20
Duplicate Floor PlanReview -Single Family Dwellings and Duplexes I _
Square Footage:_
1,000 perproject $3,888 $2.59 $3,240 $2 .16 $2,592 $1 .73
2,500 perproject $7,776 $1 .11 $6,480 $0 .92 $5,184 $0.74__
4,000 perproject $9,438 $2.35 $7,865 $1 .96 $6,292 $1 .57_
6,000 per project $14,141 $3.18 $11,784 $2 .65 $9,427 $2.1 2
8,000 per project 5 20,506 $2.56 $17,088 $2 .14 $13,670 $1 .7 1
Duplicate Floor Plan Review -Attached or Detached Accessory and Utility Use s
Square Footage :
200 per project_$1,593 $1 .01 $1,328 $0.84 $1,062 $0 .67
400 per project $1,795 $4 .26 $1,496 5 3.55 $1,196 $2 .8 4
600 per project 5 2,647 $1 .24 $2,206 5 1 .03 $1,765 $0 .8 2
1,000 per project $3,141 $0 .99 $2,618 $0 .82 $2,094 $0 .6 6
3,000 per project $5,119 $1 .71 $4,266 $1 .42 $3,413 $1 .1 4
Structural Residential Remodels and Additions - (All newly constructed additions to,
or structurally remodeled areas of,residential occupancies classified as CBC
Group R-3, or other similar residential occupancies not specifically addressed
elsewhere in this Fe e
Schedule)
Square Footage:
100 -perproject $1,967 $4.59 $1,639 $3.82 $1,312 $3.06
500 perproject $3,803 $5.37 $3,169 $4.48 $2,535 $3.58
1,000 perproject $6,490 $2.86 $5,408 $2.38 $4,327 $1 .9 1
1,500 perproject $7,920 $2 .86 $6,600 $2.38 $5,280 $1 .9 1
2,000 perproject $9,350 $4.67 $7,791 $3.90 $6,233 $3.1 2_
Non-Structural Residential Remodels and Additions - (All newly constructe d
additions to, or non-structurally remodeled areas of,residential occupancies
classified as CBC Group R-3, or other similar residential occupancies not
specifically addressed elsewhere in this Fee Schedule)
Square Footage :
100 per project $1,635 5 3.06 $1,363 $2 .55 $1,090 $2 .04
500 perproject $2,8596 5 3.41 $2,383 $2 .84 $1,906 $2 .27
1,000 per project $4,562 $2.40 $3,801 $2 .00 $3,041 $1 .60
__1,500 perproject $5,761 $2.40 $4,801 $2 .00 $3,840 $1 .60
2,000 perproject $6,960 $3.48 $5,800 $2 .90 $4,640 $2.32
Site Improvements - This includes substantial development of private parking lots
which are processed separate of the structure and include any combination of the
following : Underground utilities, parking lot lighting, accessible path of trave l
analysis,grading, drainage and compliance with the City's parking and drivewa y
standards .
_
Square Footage:
500 per project $1,474 $0.9 $1,229 $0.82 $983 $0 .66___
5,000 perproject $5,898 $0.5 $4,915 $0.46 $3,932 $0 .37_
10,000 per project $8,674 $0.11 $7,229 5 0.09 $5,7831 $0 .07_
50,000 per project $13,097 $0.09 $10,915 $0.07 _$8,732 $0 .0 6
100,000 _per project $17,348 $0 .17 $14,457 $0.14 $11,566 $0 .12
New Construction Fees-Total,2 of 2