Loading...
HomeMy WebLinkAbout10/17/2017 Item 1, Montgomery Christian, Kevin From:Montgomery, Victor <VMontgomery@rrmdesign.com> Sent:Monday, October 16, To:E-mail Council Website Subject:Proposed City Impact Fees - Industrial Land Use Category Attachments:2017 City Fees review draft VM.xlsx Council Members, in early 2014 my family started a small Industrial project near Suburban Road (on Earthwood Lane). It started construction in late 2015 and was completed in early 2017. The completed buildings are home to 2 new small businesses – a brewery and a beverage flavoring company. I have attached for your review a brief chart comparing the 2015 versus 2017 costs for City Impact Fees and School fees for this small industrial project. The 2015 fees are the actual fees paid. The 2017 fees are the maximum fee amounts depicted in the staff report. For purposes of this chart I assumed school fees remained the same for 2015-2017. The yellow highlighted cells are the total 2015 Impact fees. The green highlighted fees are the total 2017 Impact fees. As you can see the 2017 fees cost roughly twice the 2015 fees. In 2014 the consultant (EPS) indicated that fees totaling 10% of the value of an Industrial project are approaching the limit of feasibility. The attached comparison shows that in 2015 the fees amounted to approximately 10% of value. In contrast the 2017 maximum fees approach 20% of value. The 2017 Transportation + Capacity & Connection fees alone are especially burdensome at about $27.50/SF on a project that had a construction cost of $170/SF. If adopted at rates approaching 20% of project value the 2017 fees will likely make Industrial projects like this infeasible. Feel free to give me a call if you have questions. Thank you for your attention. Victor, Randi & Max Montgomery 1 10/11/2017 Industrial Land Use City Fee Comparison 2015 vs 2017 Suburban Road Vicinity ‐ Earthwood Lane 13,009 SF Industrial (2 lots) 2015 4070  Fees 2015 4090  Fees Actual 2015  Fees Total Estimated  2017 Fees  Total 2017 Fee  Assumption Fee Description Water Impact (1" meter) $36,634.00 $36,634.00 $73,268.00 $0.00 replaced AASP TIF  Fee $6,779.00 $5,357.00 $12,136.00 $0.00 replaced Storm water (Moderate) $1,671.00 $1,671.00 $3,342.00 $3,342.00 same Affordable Housing $31,150.00 $23,050.00 $54,200.00 $54,200.00 same Wastewater (Calle Joaquin) $4,389.00 $4,389.00 $8,778.00 $0.00 replaced Fire Safety Surcharge $2,692.00 $2,314.00 $5,006.00 $5,006.00 same City Wide Base TIF Fee $16,425.00 $12,229.00 $28,654.00 $0.00 replaced Public Art $2,121.00 $1,311.85 $3,432.85 $3,432.85 same AA Open Space in Lieu Fee $4,111.00 $2,814.00 $6,925.00 $6,925.00 same City Wastewater fee  (1" meter) $8,949.00 $8,949.00 $17,898.00 $0.00 replaced School Fees $6,888.99 $5,775.96 $12,664.95 $12,664.95 same Park Fees $0.00 $0.00 $0.00 $16,912.00 $1.30/sf General Government Facilities $0.00 $0.00 $0.00 $3,252.25 $0.25/SF Police Facilities & Equip $2,315.50 $0.18/SF Fire Facilities & Equip $1,951.00 $0.15/SF Transportation $255,757.00 $19.66/sf Capacity & Connect Fees (2‐1"meters)$96,498.00 new SUB‐TOTAL Impact Fees $121,809.99 $104,494.81 $226,304.80 $462,256.55 Other City fees $27,920.90 $27,920.90 same TOTAL All City & School Fees $254,225.70 $490,177.45 2015 Per SF  Fee Cost 2015 % of  Construction  Cost 2015 % of  Appraised  Value 2017 Per SF 2017 ‐ % of  Construction  Cost at 2015 x  1.2 ($204/SF) 2017 ‐ % of  2015  Appraised  Value  (same  value) City Impact Fees/SF of Building $17.40 10.2% 9.43% $35.53 17.42% 19.26% All City & School fees/SF of building $19.54 11.5% 11% $37.68 18.47% 20.42% Building SF = 13,009 Construction Cost $170/sf Bank Appraised Value ‐ $2,400,000