Loading...
HomeMy WebLinkAboutSection H.3 - Current and Long Term Capital Improvement PlanSection H.3 Background Materials CURRENT AND LONG-TERM CAPITAL IMPROVEMENT PLAN ATTACHMENT J STATUS OF CURRENT CIP PROJECTS As of November 2018 3 STATUS OF 2017-19 CAPITAL IMPROVEMENT PROJECTS Purpose The purpose of this report is to provide the Council with a concise summary of the status of the City’s Capital Improvement Plan (CIP) projects. Of the 97 projects that have been financially active during the 2017-19 Financial Plan period: 1. 20 are complete, 2. 29 will be complete within 6 months, 3. 21 will be complete within 12 months, 4. 27 will be complete in more than 12 months. Within the last 12 months the following projects have been completed: 1. Sinsheimer Playground Renovation: Park playground equipment, which had originally been installed in 1993, was outdated and did not conform to current California playground regulations. In preparation for renovation, the City underwent an extensive public engagement process including receiving children’s input in a “kids only” session. The resulting project includes a completely reconstructed playground site and all new equipment, which has been well received by adults and children alike. The construction cost for this work was $725,000 of which $283,000 was grant funding Complete, 20 Complete in 6 months, 29 Complete in 12 months, 21 Complete in more than 12 months, 27 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 2. Madonna Road and Los Osos Valley Road Paving: Los Osos Valley Road and Madonna Road underwent a combination of maintenance, rehabilitation, and reconstruction work for the first time in approximately 10 years. Improvements included repairs and a maintenance seal of Los Osos Valley Road and Madonna Road, as well as full reconstruction of Madonna Road between Los Osos Valley Road and Oceanaire through reclamation of the existing roadway paving. Along with pavement maintenance work, curb ramp upgrades and bike facility improvements were completed. The construction cost for this project was $2,740,000. 3. Mission Plaza Railing Replacements: This project addresses ongoing railing replacement needs within the Mission Plaza and adjacent pathways along San Luis Obispo Creek. The existing railing is deteriorated and failing in places and does not meet current standards for safety. Approximately 160 lineal feet of railing is replaced at a cost of $30,000. 4. Calle Joaquin Park and Ride: This project, located on Calle Joaquin behind the Hampton Inn, encourages sustainable transportation and ridesharing with the addition of 31 car spaces and two motorcycle spaces to the region-wide Park and Ride inventory. In addition to the construction of new parking, the project also included a bus turnout, lighting, and landscaping with Low Impact Development (LID) features to retain and save water. The construction cost for this work was $573,000. 5. Reservoir canyon: The Reservoir Canyon Natural Reserve is a popular destination for hikers and outdoor enthusiasts. The City’s Conservation Plan for the reserve identified the need to provide increased trail access and creek crossings to allow safer passage, particularly during winter storm events when Reservoir Canyon creek often floods parts of the trail. This project installed a new 60-foot span fiberglass bridge crossing at a cost of $75,000. 6. Marsh Street Curb Ramps: The City has an established system of streets with curbs, gutter, and sidewalks. This system can be challenging to negotiate for those with physical limitations, especially where curb ramps do not currently exist or where curb ramps do not meet current standards. This project installed new ramps and retrofitted existing ramps at 21 locations along Marsh Street. Construction cost for this work was $165,000 of which $105,000 was Community Development Block Grant funding. Before/After Photo at North Corner of Marsh & Carmel Intersection. 7. Monterey & Osos Traffic Signal Reconstruction: The City’s Traffic Safety Report identified the intersection of Monterey and Osos as a high collision rate intersection with correctable measures available. Red light violations in all directions was the identified pattern of collision at the intersection. Corrective measures included the enhanced visibility of signal heads, which were constructed by this project. Additional improvements included new curb ramps at all four corners and tree replacement. The construction cost for this work was $360,000. 8. Bus Shelters: The SLO Transit system has approximately 236 bus stops of which 49 have bus shelters. Many of the existing shelters are older models with glass panels that are past their useful life and are subject to graffiti and vandalism; glass replacement is an ongoing expense. This project replaced 12 old shelters with new models which meet current standards and are more durable. The project cost for this work was $63,000. 9. City Hall Kiosk: This project continued implementation of the City Wayfinding Program with the installation of a new informational kiosk and wayfinding sign located outside of City Hall. Construction Cost: $83,000 10. Sign Replacement Project: The City is responsible for maintenance of approximately 15,000 traffic signs. The Sign Replacement Project is part of an ongoing program to replace old signage with new signage meeting minimum retro-reflectivity levels for enhanced driver awareness and public safety. This year’s project replaced 188 signs of all types, including speed limit, stop, and parking signage. The construction cost for this work was $41,000. 11. Concrete Streets: This project reconstructed the intersections of Dana and Nipomo, Palm and Toro, and Palm and Johnson as well as paving of Dana Street. These intersections were previously very cracked and uneven, presenting a challenge to pedestrians crossing the street, particularly those with mobility limitations. Work included new curb ramps and intersection paving. Dana Street received an asphalt concrete overlay which removed surface irregularities and brought the roadway back to excellent condition. The construction cost for this work was $635,000. Before and After at the Intersection of Palm/Toro Before and After at the Intersection of Palm/Toro Before and after on Dana Street 12. Rosa Butron Adobe Painting: Regular painting of City facilities protects buildings against environmental damage and prolongs building life. This project addressed the painting maintenance requirements of the Rosa Butron Adobe (located on Dana Street), which had not been painted in over 10 years. The cost of this work was $10,000. 13. LOVR Interchange Landscaping: The Los Osos Valley Road Interchange (LOVR) project began construction in the Fall of 2014 and was completed in 2016. The LOVR Landscaping Project was implemented as an environmental mitigation of the overall Los Osos Valley Road Interchange Project and is a joint effort between Caltrans and the City. Landscaping was installed along both sides of the new bridge and adjacent on and off ramps. New plantings included trees and shrubs, within new mulched areas, are irrigated by recycled water. Construction cost for this work was $376,000. 14. Laurel Lane Street Lights: Street lighting along the south end of Laurel Lane had not been operational due to damaged electrical wiring. This project installed new conduit wire and lighting pull boxes, restoring power and lighting and enhancing nighttime visibility. The cost of this work was $81,000. 15. Southwood and Ellen Storm Drain Replacement: Maintenance of the City’s storm drain system provides for increased flood protection and reduces the likelihood of property loss. This project replaced failing corrugated metal pipe (CMP) drain systems at Southwood Drive and Ellen Way by removing 150 feet of failing CMP and providing enhanced stormwater protection by extending the system with 350 feet of storm drain pipe, including new catch basins. The construction cost for this work was $200,000. 16. Roadway Sealing 2018 and Laurel Lane Complete Streets: This project implemented the City’s pavement maintenance plan for ongoing street maintenance in combination traffic safety enhancements to Laurel Lane. Approximately 20% of the City’s neighborhood streets in the southwest area of the City received a slurry seal maintenance treatment. Improvements to Laurel Lane increased pedestrian, bicycle, and vehicle safety by the construction of high visibility crosswalks and corner ramp bulbouts, buffered bike lanes, and revised roadway striping. Construction cost for this work was $2.4 Million. Before and After at the Laurel Lane and Augusta Intersection 17. Sidewalk Replacement on Monterey: This project replaced a section of sidewalk on Monterey Street near Morro Street was damaged due to a large tree. The damaged sidewalk created a tripping hazard for pedestrians, as well redirected drainage into adjacent business instead of into the street. With approval from the tree committee, the ficus tree was removed and replaced with two olive trees in conjunction with the sidewalk replacement work. The cost of this work was $49,500. 18. Silt Removal 2018: Silt carried by storm water settles at points in creeks where storm water velocity decreases, resulting in deposits of silt and settlement that build up over time, reducing capacity of creek systems and increasing the risk of flooding of surrounding areas. This year’s silt removal project removed 1,320 cubic yards of silt build up in the Prefumo Creek just west of the LOVR crossing. The cost of this silt removal work was $59,000. Before and after silt removal from the Prefumo Creek arm, East of LOVR. Capital Improvement Projects that are currently under construction include: 1. Telemetry System Improvements SCADA Project: Supervisory Control and Data Acquisition (SCADA) systems include elements of computer programing, radio communication, databases, and human-machine interface (HMI) stations. With SCADA, an operator can efficiently manage a complex network of pipes, valves, tanks, and pump stations from an HMI station based on real-time data collected from remote locations of the water system. This project that is currently being constructed provides complete SCADA coverage of the City’s water distribution system. The estimated construction cost for this work is $1.1 Million. 2. Margarita Lift Station Project: The Margarita Lift Station was put into service in 1971 and has exceeded its operational life expectancy of 20 years. This project replaces the existing lift station with a new wet well and sewer force main. The new station accommodates capacity needs of development anticipated by the Margarita Area Specific Plan. The estimated construction cost for this work is $1.4 Million. 3. Sinsheimer Backstop: Sinsheimer Baseball Stadium, built in the 1970’s, has been the community’s baseball venue for local schools, Babe Ruth leagues, and primarily the home of the SLO Blues semi-professional baseball team. The old backstop, consisting of fabricated steel poles and chain-link fencing, reached the end of its design life and was recommended for replacement to avoid a failure. The new backstop, currently under construction, will consist of small steel cables and nylon netting, and will extending 30- feet above the field in the same style used by most colleges and major league baseball. The estimated construction cost for this work is $170,000. Old backstop, currently being removed and replaced. 4. Waterline Replacements: This project is replacing approximately 5,000 feet of waterline in Pacific, Boysen, Chorro and Sierra streets. The existing waterlines are substandard and deteriorated and their replacement will remove capacity limitations improve water flow for fire protection. Replacing waterlines reduces maintenance costs and customer impacts associated with emergency repairs. This estimated construction cost for this work is $1.8 million 5. Sewerlining Project: This project rehabilitates 4,350 feet of existing sewer pipe using cured in place pipe (CIPP), a trenchless rehabilitation method. This project rehabilitates aging and deteriorating sewer infrastructure that will ultimately reduce maintenance cost and the need for emergency repairs. The estimated construction cost for this work is $695,000. 6. Fire Station 1 Masonry Seal: Regular painting of City facilities protects buildings against environmental damage and prolongs building life. This project addresses the masonry seal needs Fire Station 1. The estimated construction cost for this work is $40,000. 7. City Hall Chiller Replacement: This project replaces the existing cooling system at City Hall with a smaller and more energy-efficient unit meeting all current standards. This project was necessitated by the imminent failure of the existing cooling system which was installed in 1996, requires ongoing costly repairs, and is no longer supported by the manufacture. The estimated construction cost for this work is $137,000. Capital Improvement Projects that are anticipated to start construction within the next six months include: 1. Concrete Paver Sidewalk – Replacement of Boardwalks in the Railroad District: Portions of the sidewalk on Santa Barbara Street from Broad to Leff are constructed of wood planks, which was formerly the City’s standard installation for sidewalk in the Railroad District. The existing wood plank boardwalk sidewalk are in poor condition and must be addressed to prevent hazards to pedestrians. The estimated construction cost for this work is $350,000. 2. El Capitan Bridge Replacement: The El Capitan Bridge is a pedestrian bridge located at the end of El Capitan Way. In January of 2015, a large eucalyptus tree fell on the Bridge causing substantial damage. This project will remove and replace the bridge. Estimated Construction Cost: $100,000 3. Meadow Park Pedestrian Bridge Replacements: This project will replace the pedestrian bridges within Meadow Park, which have deteriorated and reached the end of their useful life. The estimated construction cost of this project is $180,000. 4. Fire Station 4 Emergency Generator: This project replaces an existing gasoline powered backup generator with a new generator at Fire Station 4. The new generator will provide the backup power necessary to keep this facility functioning in the event of a disaster. The estimated construction cost for this work is $79,000. 5. Pedestrian and Bicycle Pathway Maintenance: There are approximately 6.5 miles of asphalt pathways and bike paths within the City which require routine surface maintenance to keep them functional for users. This project will rehabilitate the pedestrian pathways within Meadow Park. 6. Marsh Street Bridge Replacement: The Marsh Street Bridge, located near the intersection of Marsh and Santa Rosa Streets, was approved by the City Council in January 2013 for removal and replacement. This followed a determination by the California Department of Transportation (Caltrans) that the existing bridge, built in 1909, is structurally deficient. An assessment concluded that a complete replacement of the existing bridge was the most prudent and cost- effective alternative given the age of the structure. The estimated construction cost of this project is $7.6 Million. Overall Status of the City’s Current CIP Projects This report summarizes the status of all 97 CIP projects with financial activity during the 2017-19 Financial Plan period presented under Major City Goal, Other Important Objective and Regular priorities. No. Project Project Budget Percentage Complete Major City Goal 2017/19 Multimodal Transportation 1 Prado Road Interchange $31,690,000 35% 2 Prado at Higuera Bridge Replacement $11,075,000 10% 3 Safe Routes to School: Foothill Crossing $595,894 40% 4 Anholm Bikeway: Phase 1 $792,106 50% 5 Orcutt Tank Farm Roundabout Design $213,050 100% 6 Santa Fe at Tank Farm Bridge Replacement $2,865,000 5% 7 Higuera Street Widening: 50 Higuera $947,500 5% 8 Bob Jones Trail: Prefumo Creek to Oceanaire Study and Design $216,000 50% 9 Railroad Safety Trail Pepper to Train Station $30,000 10% 10 Broad Street Corridor Access Improvements $70,000 10% 11 California Taft Roundabout Design $290,000 60% 12 Higuera Street Widening: Fontana to Chumash $365,500 15% 13 Meadow Park Pathway Maintenance $120,000 35% 14 Broad Street Pavement Improvements $1,600,000 50% 15 Marsh at Santa Rosa Bridge Replacement $8,342,900 50% 16 Railroad Safety Trail Taft to Pepper $4,653,700 70% 17 Roadway Sealing and Laurel Lane Complete Streets $3,000,000 95% No. Project Project Budget Percentage Complete 18 Concrete Streets and Accessibility Improvements Project $770,000 100% 19 CDBG Marsh Street Curb Ramps $213,000 100% 20 Madonna and LOVR Rehabilitation Project $2,900,000 100% 21 Sign Replacement Project $45,000 100% 22 Bob Jones Trail Octagon Barn Connection Study $50,000 100% Major City Goal 2017/19 Climate Action 23 Green Fleet Vehicle Charging Stations $105,000 45% Major City Goal 2015/17 Multimodal Transportation 24 LOVR Interchange Landscape $535,688 100% Other Important Objective 2017/19 Downtown Vitality 25 Palm-Nipomo Parking Structure $23,850,000 40% 26 Mid-Higuera Bypass $482,000 30% 27 Mission Plaza Concept Plan $120,000 100% 28 Mission Plaza Restroom Replacement $105,000 20% 29 Mission Plaza Railing Upgrade $30,000 40% 30 Downtown Renewal: 858 Higuera $36,000 40% Other Important Objective 2015/17 Neighborhood Wellness 31 CMP Repair Bullock Lane $170,000 5% 32 Buchon and Santa Rosa Storm Drainage Improvements Project $250,000 40% 33 Sinsheimer Stadium Backstop $153,500 80% 34 Silt Removal $135,000 100% No. Project Project Budget Percentage Complete Other Important Objective 2015/17 Laguna Lake Restoration 35 Laguna Lake Dredging $490,000 75% Other Important Objective 2015/17 Fiscal Sustainability & Responsibility 36 City Hall Painting $55,000 50% Other Important Objective 2013/15 Infrastructure Maintenance 37 Margarita Lift Station Replacement $2,318,535 90% 38 Water Resource Recovery Facility (WRRF) Facility Upgrade $115,000,000 75% 39 Water Distribution Telemetry System $1,036,650 90% Other Important Objective 2011/13 Infrastructure Maintenance 40 Calle Joaquin Siphon and Lift Station $6,400,000 50% Regular Priority 41 Parking Access Revenue Control System $763,000 80% 42 North Broad Street Neighborhood Park $75,000 5% 43 Police Department Space Improvement $124,000 5% 44 Railroad Crossing Upgrade - Foothill $740,000 10% 45 Calle Joaquin at LOVR Drainage $15,000 20% 46 Corporation Yard Tenant Improvement $50,000 20% 47 Parks and Recreation Interior Office $55,000 25% 48 El Capitan Pedestrian Bridge Replacement $150,000 50% 49 Waterline Abandonment & Connections Various Locations $1,622,170 25% 50 Sinsheimer Park Tennis Court Lighting $204,000 25% No. Project Project Budget Percentage Complete 51 Reservoir No. 2 Replacement $5,750,000 30% 52 Chorro/Murray Sewer Replacement $444,000 30% 53 Walnut, Morro, Albert, Mill, Santa Rosa CIPP $660,000 40% 54 Terrace Hill PRV & Wash Water Recoat $757,500 45% 55 Utilities Administration HVAC $50,400 50% 56 Lakeview Drainage $200,000 50% 57 City Hall Landing Repair $25,000 50% 58 Foothill-Chorro PRV Replacement $109,000 50% 59 Foothill Pipe Burst $120,000 50% 60 Pickleball Courts $60,000 50% 61 Sewer Lining Project $695,000 70% 62 Stafford, Taft, Kentucky Sewer Line Replacement $250,000 75% 63 Marsh Street Garage Improvements Design $106,000 100% 64 Waterline Replacement Various Locations $2,288,600 85% 65 Osos/Leff/Santa Barbara Sewer $910,000 85% 66 City Hall Kiosks $79,100 95% 67 Facilities Master Plan $250,000 95% 68 Bus Shelter Installation $56,000 100% 69 Jennifer Street Bridge Deck Repair $8,500 100% 70 Reservoir Canyon Pedestrian Bridge $80,000 100% No. Project Project Budget Percentage Complete 71 Swim Center Co-generation Plant $85,000 5% 72 Police Evidence Storage Bldg Roof $5,000 10% 73 Install Police Admin Building IT-Room Cooling $15,000 10% 74 Fire Station 1 HVAC $21,800 15% 75 Fire Station 2 Communications Tower $200,000 20% 76 Corp Yard Fuel Island Siding $14,750 25% 77 Islay Hill Park Playground $80,000 25% 78 Swim Center Bath House Roof $8,500 30% 79 Swim Center Re-plaster Therapy Pool $18,500 30% 80 Sinsheimer Irrigation & Drainage $140,000 35% 81 Meadow Park Pedestrian Bridges Replacement $175,000 40% 82 South Hills Radio Site Upgrades $523,500 35% 83 Police Department & Fire Station 3 Painting $88,500 40% 84 Fire Station 4 Emergency Backup Generator $79,500 45% 85 Emergency Dispatch Center DataAire Replacement $172,000 50% 86 Ellen Way Storm Drain Improvements $230,000 100% 87 City/County Library HVAC Replacement $53,100 50 88 Parks & Recreation HVAC $50,400 50% 89 Fire Station 1 Masonry Sealing $65,000 90% 90 City Hall Chiller Replacement $227,400 80% No. Project Project Budget Percentage Complete 91 1042 Walnut Parking Lot Maintenance $120,000 65% 92 Sinsheimer Court Entrance Hardscape $60,000 65% 93 Broad and Leff Culvert Repair Design $10,000 75% 94 PG&E Relocation for Meadow Park Pedestrian Bridge $30,000 80% 95 Pavement Inspection $25,000 85% 96 Police Station Replacement Conceptual Design $80,000 90% 97 Laurel Lane Street Light Repair $100,000 100% ATTACHMENT K LONG RANGE CAPITAL IMPROVEMENT PLAN NEEDS 11/26/18 3 OVERVIEW The Long-Range Capital Improvement Plan Needs provides a glimpse into the future improvement needs of the City as envisioned by the General Plan or other Council adopted plans. Many of our current infrastructure assets are not adequate to handle the needs of the future. Many streets must be built or widened, intersections improved, bicycle facilities added, water lines and sewer lines extended into new areas, and new parks must be built. The Long-Range Capital Improvement Needs can serve as a guide for required future investments to support the General Plan as well as other Council approved policies, plans, and goals in place today. At the time of General Plan build out, the projects included in the Long-Range Capital Improvement Plan Needs would ideally be built and available for use by the community. Annual maintenance needs for City infrastructure are shown below are represent the ideal annual investment. Annual Maintenance Needs Asset Ideal Annual Funding Traffic Management $ 250,000 Pavement Management $ 4,400,000 Curb, Gutter, Sidewalks $ 1,000,000 Flood Control $ 5,300,000 Sidewalk Ramps $ 580,000 Parks Play Equipment $ 150,000 Water Systems $ 3,100,000 Sewer Systems $ 2,800,000 Buildings $ 1,570,000 Bike Path Maintenance $ 100,000 Openspace Maintenance $ 150,000 Total $ 19,400,000 Annual maintenance needs of existing assets are an important consideration when considering the one-time implementation cost of long-range infrastructure expansions projects. While the Long-Range Capital Improvement Plan Needs focuses on the new facilities and infrastructure needed to support the City at build-out, the costs to maintain existing assets should also be considered. Ideally, these projects would be built as part of new development taking place in the City, but this may be unrealistic. The City may need to build some of these projects using grant funds, general funds, or some form of debt financing. There also may be opportunities in the future in which to leverage grant funding to build larger infrastructure maintenance projects to complement what new development provides. By considering the Long-Range Capital Improvement Plan Needs in the context of the Financial Plan process, these projects provide an important starting place in assessing which ones might be a high priority to consider in the next funding cycle. The list is a way 4 for the Council to see the long-term infrastructure improvements that are needed and have an “order of magnitude” idea of how much it may cost to fully implement. With this understanding, the Long-Range Capital Improvement Plan Needs is one of the pieces of information for the Council to consider in setting goals and priorities. This Long- Range Capital Improvement Plan Needs is conceptual, and in most cases, the projects have not undergone detailed analysis, nor undergone the rigor of the public review process. They represent City staff’s best assessment of costs and scope based on what is known today but may undergo changes in scope or importance as new challenges and issues emerge over time. In short, this report focuses on presenting the "inventory" of improvements that may be needed at some time in the future, as a starting point in the goal-setting process. A summary of estimated cost of the Long-Range Capital Improvement Plan Needs by function and anticipated funding source is as follows: LONG-TERM CIP SUMMARY BY FUNCTION AND FUNDING SOURCE COMMUNITY & NEIGHBORHOOD LIVABILITY $ 3,358,000 General Capital Outlay $ 3,358,000 COMMUNITY SAFETY $ 137,583,000 General Capital Outlay $ 131,427,000 Impact Fee $ 6,156,000 CULTURE & RECREATION $ 115,827,000 General Capital Outlay $ 82,827,000 Impact Fee $ 25,808,000 Park In Lieu $ 7,192,000 ENVIRONMENTAL HEALTH & OPEN SPACE $ 23,223,000 General Capital Outlay $ 15,723,000 State or Federal Grant $ 7,500,000 FISCAL HEALTH & GOVERNANCE $ 13,160,000 General Capital Outlay $ 13,160,000 INFRASTRUCTURE & TRANSPORTATION $ 662,810,000 Debt Financing $ 18,656,000 Developer Contribution $ 30,825,000 General Capital Outlay $ 240,274,000 Parking Fund $ 10,010,000 Sewer Fund $ 130,000,000 State or Federal Grant $ 50,851,000 Transportation Impact Fee $ 104,694,000 Water Fund $ 77,500,000 Total $ 955,961,000 Existing city funding is available for a portion of the Annual Maintenance needs in the first chart. Those funds are primarily Local Revenue Measure, State Gas Tax, General Fund, 5 and Water and Sewer funds. As shown in the second chart, funding sources for the Long- Range needs as shown in the chart below include Impact Fees, Developer contributions, enterprise fund sources (Water, Sewer, Parking and Transit), grant funds, and General Fund. A project listing of the Long-Range Capital Improvement Plan Needs by function and estimated project cost is as follows: COMMUNITY & NEIGHBORHOOD LIVABILITY $ 3,358,000 Emerson Park Rehabilitation $ 1,276,000 Emerson Park Restroom $ 638,000 Mission Plaza Restroom Replacements and Enhancements $ 1,444,000 COMMUNITY SAFETY $ 137,583,000 Fire Station 1: New Emergency Operations Center and Maintenance Building $ 9,106,000 Fire Station 1: Provide Additional Operational Area $ 3,758,000 Fire Station 2 Replacement $ 11,716,000 Fire Station 3 Replacement $ 18,548,000 Fire Station 4 Replacement $ 13,527,000 Fire Station 5: New Fire Station $ 12,574,000 Police Response Vehicles $ 399,000 Police Station Replacement $ 47,435,000 Stormwater Resource Plan Implementation $ 1,620,000 Waterway Management Plan Implementation $ 18,900,000 CULTURE & RECREATION $ 115,827,000 Implementation of Parks Master Plan $ 49,758,000 Laguna Lake Golf Course Club House $ 4,681,000 Mitchell Park Senior Center Expansion and Renovation $ 1,102,000 New Park Amenities $ 378,000 Orcutt Area Neighborhood Parks $ 7,192,000 Parks and Recreation Administration Expansion and Renovation $ 6,780,000 Replacement of the Ludwick Community Center $ 24,244,000 Sinsheimer Stadium: Concession and Restroom Replacement $ 3,480,000 Swim Center Site and Deck Improvements $ 18,212,000 ENVIRONMENTAL HEALTH & OPEN SPACE $ 23,223,000 Buses to Trails Implementation $ 44,000 Electric Fleet Vehicle Charging Stations $ 309,000 Laguna Lake Dredging $ 13,920,000 Open Space Acquisition $ 8,950,000 FISCAL HEALTH & GOVERNANCE $ 13,160,000 Dog Park(s) $ 624,000 Implement Accessibility Improvements $ 2,016,000 Mission Plaza Revitalization $ 7,656,000 6 San Luis Creek Walkway Expansion $ 2,864,000 INFRASTRUCTURE & TRANSPORTATION $ 662,810,000 Bishop and Roundhouse Street Connection $ 13,200,000 Bob Jones Trail Connections: Marsh Street to Prado and Los Osos Valley Road to Southern City Limits $ 11,000,000 Boysen at Santa Rosa Street: Pedestrian and Class I Bike grade separate crossing $ 3,500,000 Broad at Tank Farm Intersection Improvements $ 1,500,000 Broad Street Bicycle Boulevard / Anholm Bikeway Including Broad St. Ramp Closure & Bike/Ped Overpass $ 5,000,000 Broad Street Bike Path: Class I from Rockview to Damon Garcia Sports Fields $ 800,000 Broad Street Intersection Improvements $ 6,775,000 Broad/South/Santa Barbara streets Intersection Improvements $ 300,000 Bus Fleet Expansion: 4 Buses $ 1,970,000 Cerro Romauldo Bike Path: Class I from Tassajara to Chorro Street $ 750,000 City Hall Annex Renovation $ 47,223,000 City Hall Renovation $ 10,123,000 Citywide Traffic Model Updates and Data Collection $ 954,000 Class II Bike Lane Installations $ 3,299,000 Class III Bike Lane Signage and Markings $ 408,000 Corporation Yard Work Area Rehabilitation $ 583,000 Creek Walk Expansion under Broad Street Bridge $ 6,237,000 Downtown Bikeways & Bike Blvds $ 2,000,000 Downtown Lighting Installations $ 630,000 Downtown Multimodal Street Conversion (Type A) $ 53,157,000 Downtown Multimodal Street Conversion (Type B) $ 7,157,000 Downtown Multimodal Street Conversion (Type C) $ 5,893,000 Downtown Multimodal Street Conversion (woonerfs) $ 15,312,000 Downtown Sidewalk Installations $ 1,159,000 Ella Street Bike Boulevard $ 50,000 Extend Prado Road: Higuera Street to Broad Street $ 26,526,000 Fixilini & Flora Bike Boulevard $ 450,000 Higuera at Tank Farm: Intersection Improvements $ 2,000,000 Higuera Widening: High St to Marsh St $ 2,150,000 Higuera Widening: Madonna Rd to City Limits $ 5,400,000 Horizon Lane Extension South of Tank Farm $ 3,000,000 Implementation of IT Strategic Plan $ 17,000,000 Intersection Control Upgrades $ 20,000,000 Jennifer Street Bridge Morro St. Expansion $ 500,000 Laguna Lake Bikeways $ 6,576,000 Los Osos Valley Road Interchange Class I Bike Underpass $ 1,000,000 Madonna Class I (Hwy 101 to Oceanaire) $ 1,500,000 Marsh & Higuera 2-Way Conversion $ 3,770,000 7 Marsh at Higuera Intersection Improvements $ 5,123,000 Master Plan Implementation $ 50,000,000 Meter Expansion (new) $ 350,000 Multimodal Street Conversion Studies $ 477,000 New Street Lights $ 964,000 Orcutt at Johnson Intersection Improvements $ 2,000,000 Orcutt at Tank Farm Intersection Improvements $ 1,700,000 Orcutt Road Bridge over Railroad Tracks $ 20,000,000 Parking Structure: Palm and Nipomo Street $ 25,016,000 Pedestrian and Bicycle Bridge: Bullock to Industrial over Railroad Tracks $ 2,703,000 Pedestrian and Bicycle Bridge: Over Tank Farm along east side of railroad tracks $ 1,178,000 Pedestrian and Bike Bridge: Penny Lane over railroad tracks $ 53,000 Prado at Higuera Intersection Improvements $ 2,500,000 Prado Road Interchange $ 35,000,000 Prado Road Widening: West of Higuera Street widening $ 12,000,000 Property Acquisitions - Lots E/O Santa Rosa and Downtown $ 3,000,000 Railroad Safety Trail: Class I Bike Path from Cal Poly to Southern City Limits $ 12,000,000 Railroad Safety Trail: Pepper Street to the Train Station $ 176,000 Santa Fe Bike Path: Class I Bike Path from Buckley to Tank Farm $ 2,863,000 Santa Fe Road Connection: Tank Farm to Prado Road $ 1,080,000 Sewer Collections Master Plan Implementation $ 35,000,000 Sewer Treatment and Reclamation Master Plan Implementation $ 95,000,000 South Broad Street Medians $ 2,708,000 Tank Farm Creek Bike Path: Class I Bike Path from Buckley to Tank Farm $ 1,800,000 Tank Farm Road Widening: Horizon to Santa Fe $ 22,000,000 Transit Center $ 6,428,000 Upgrade of Pedestrian and Bike Crossing Controls $ 2,389,000 Upgrade Parking Meters: Coin Meter to Credit Card Capable $ 300,000 Vachell Lane Bike Path: Class II Lanes on Vachell from Buckley to South Higuera Street $ 650,000 Water Reuse Master Plan Implementation $ 2,500,000 Water Treatment Plant Master Plan Implementation $ 25,000,000 West Side of 101 Bike Path: Class I Bike Path from Broad to Marsh Street $ 2,000,000 Total $ 955,961,000