Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 1-28-19 1 1 1/28/2019 07:00:00 15:30:00 1 8 2 1 8 2 1 8 2 1 8 2 1 8 2 1 8 2 1 8 2 1 0 1 8 1 4 1 0 1 8 2 1 0 1 0 1 1 0 1 0 1 1 1 0 2 0 1 8 2 1 8 2 1 8 2 4 8 2 1 0 1 1 0 1 0 1 1 8 2 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck 5 to 7 ton roller Cat mini sweeper Anthony L Labor Sierra Track Excavaror George Operator Cole trucking AC Water Truck Rental Bryce Mason Ronny Operator Phil Mason Earth Systems on site 10:30 am way Todd Labor Clayton Operator Golding saw cutting iran Nieves Flagger Luis Labor Boysen services boysen 8:00 am Contractor is flushing water line at Chorro & Ferinni. 9:00 am shut down for tie-in at Chorro & Santa Rosa. Jerry exstended the shut down area to Foothill. no -one was additionaly affected . 1:00 pm water was restored contractor is starting to tie-over fire lines. 6:00 pm Contractor completed tying over 3 fire lines and is backfilling trenches.