HomeMy WebLinkAboutDaily -91436 Waterline 1-29-19
1
1
1/29/2019
07:00:00
15:30:00
1
8
1
8
1
8
1
8
1
8
1
8
1
8
1
0
1
8
1
1
0
1
8
1
8
1
0
1
1
0
1
0
1
1
2
1
0
2
0
1
8
1
8
1
8
4
8
1
0
1
1
0
1
0
1
1
8
8
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Start
Stop
Diary:
Signature:
Title: Engineer Inspector
Materials:
Weather: Dry/Clear </
Date
Curley Labor
James Y Foremen
James D Labor
Jano Y Labor
Manuel B Labor
JD -50 MINI EX
350SG BACKHOE
BOBTAIL
CREW TRUCKS
CONCRETE SAW
Specification 91436
D-Kal Engineering
Jose Labor
Jake Labor
10 wheeler Dump Truck
5 to 7 ton roller
Cat mini sweeper
Anthony L Labor
Sierra
Track Excavaror
George Operator
Cole trucking
AC
Water Truck
Rental
Bryce Mason
Ronny Operator
Phil Mason
Earth Systems
on site 10:30 am
way
Todd Labor
Clayton Operator
Golding saw cutting
iran Nieves Flagger
Luis Labor
boysen
Paving
8:00 am Contractor is paving today 150' on Boysen strating at HWY 1.
10:00 am Earth Systems is on site compaction test are low. Contractor found out Cole trucking changed materrial and we did't have a curve for.
Contractor decided to go ahead and pave hoping the new curve will make passing test.
2:45 pm the curve came back and test passed.