Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 9-28-18 1 1 9/28/2018 07:00:00 15:00:00 14 14 14 14 14 14 14 14 1 1 1 14 1 14 1 14 2 14 1 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Bobtail rental Jose Labor Mike Labor Jake Labor Ted Operator tiein Chorro street tie in 9:00 AM: Contractor is tying over one services and changing out meters on Chorro. Also strated potholing street for tie-in starting at 2pm to 6pm. 2pm Jerry and Ryan are on site water is shut down. D-Kal has 2 crews working on site one at Pismo and one at Pacific. 4pm while excavating to remove thrust from existing watermain contractor found a abandoned 8'' waterline and valve. Contractor was missing some correct fitting for tie-in and was delayed because they had to go pick up correct fittings. exsample was megalug fittings for DI rather than PVC. MJ glands rather than meg a lugs. After removing the existing abandoned main found existing SD slope 15% and was in conflict with tie -in. 4:30 pm I directed contractor to install new line under existing SD. 8:00 pm water back on at Pismo. 9:30 pm water back on at Pacific fire alarm whent off at 881 Pacific FD on site I called disspatch to inform them.