Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 10-1-18 1 1 10/1/2018 07:00:00 15:00:00 7 7 7 7 7 7 7 7 7 1 1 1 7 1 7 1 7 2 7 1 4 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Bobtail rental Jose Labor Jake Labor Ted Operator Elliot Labor Chorro street gradibg trench, saw cut Sierra 7:00 am Contractor is working on preping Chorro street for paving. 8:00 am Contractor is working on layout and saw cutting Sierra Way. 9:00 am Contractor repaired the 12" SD on Pacific. 1:00 pm James agreed not to saw cut on the S @ Sierra Way until potholing is complete. Crew is early today