EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Start
Stop
Diary:
Signature:
Title: Engineer Inspector
Materials:
Weather: Dry/Clear </
Date
Curley Labor
James Y Foremen
James D Labor
Jano Y Labor
Manuel B Labor
JD -50 MINI EX
350SG BACKHOE
BOBTAIL
CREW TRUCKS
CONCRETE SAW
Specification 91436
D-Kal Engineering
rental
Jose Labor
Jake Labor
Elliot Labor
Chorro street gradibg trench, saw cut Sierra
10 wheeler Dump Truck
Jim Douglas Operator
5 to 7 ton roller
Cat mini sweeper
Tim Operator
Anthony L Labor
Rental
Sierra
Way
Track Excavaror
Chorro
7:00 am Contarctor is working on Chorro placing concrete and working on Sierra way.
9:00 am contractor hot taped 16" on Bishop.
10:00 am Contractor started main lining 10" PVC installed 60' today only due to theie dump yard is to wet for trucks.
12:00 pm contractor placed concrete on Chorro and thrust blocks on Sierra Way hot tap & fire hydrant T. cLS I concrete.