HomeMy WebLinkAboutDaily -91436 Waterline 10-10-18 1 1 10/10/2018 07:00:00 17:00:00 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 10 1 2 10 1 10 1 10 1 10 2 10 1 3 2 2 8 1 10 1 1 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck Jim Douglas Operator 5 to 7 ton roller Cat mini sweeper Tim Operator Anthony L Labor Sierra Way Track Excavaror Chorro George Operator Cole trucking AC Water Truck Rental Installing main line on Sierra < 7:00 am Contarctor is working on installing 10" water main on Sierra way and cutting storm drain 9:00 am Contractor hit and damanged 6" sewer main crossing water. Contractor is also potholing tie-in at Ella & Sierra Way 11:00 am Sewer crew onsite with vac. truck to bypass manhole to allow contractor to make repairs and trench waterline trench. 1:30 pm contractor completed repairing sewer main at force account. Gas line was not marked at Ella & Sierra. I called Ry and informed him Ry set locator out on site to mark gas. Met with Miguel and Hy about tie-in conflicts at Ella & Sierra. 3:00 pm Contractor installed 100' today. Spoke with Ry gas Co. Ry informed me he will be on site tomorrow to look at gas line conflict. 4:30 pm Contractor completed backfilling trenches. .