HomeMy WebLinkAboutDaily -91436 Waterline 10-10-18
1
1
10/10/2018
07:00:00
17:00:00
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
10
1
2
10
1
10
1
10
1
10
2
10
1
3
2
2
8
1
10
1
1
8
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Start
Stop
Diary:
Signature:
Title: Engineer Inspector
Materials:
Weather: Dry/Clear </
Date
Curley Labor
James Y Foremen
James D Labor
Jano Y Labor
Manuel B Labor
JD -50 MINI EX
350SG BACKHOE
BOBTAIL
CREW TRUCKS
CONCRETE SAW
Specification 91436
D-Kal Engineering
Jose Labor
Jake Labor
10 wheeler Dump Truck
Jim Douglas Operator
5 to 7 ton roller
Cat mini sweeper
Tim Operator
Anthony L Labor
Sierra
Way
Track Excavaror
Chorro
George Operator
Cole trucking
AC
Water Truck
Rental
Installing main line on Sierra <
7:00 am Contarctor is working on installing 10" water main on Sierra way and cutting storm drain
9:00 am Contractor hit and damanged 6" sewer main crossing water. Contractor is also potholing tie-in at Ella & Sierra Way
11:00 am Sewer crew onsite with vac. truck to bypass manhole to allow contractor to make repairs and trench waterline trench.
1:30 pm contractor completed repairing sewer main at force account. Gas line was not marked at Ella & Sierra. I called Ry and informed him Ry set locator out on site to mark gas.
Met with Miguel and Hy about tie-in conflicts at Ella & Sierra.
3:00 pm Contractor installed 100' today. Spoke with Ry gas Co. Ry informed me he will be on site tomorrow to look at gas line conflict.
4:30 pm Contractor completed backfilling trenches.
.