Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 10-11-18 1 1 10/11/2018 07:00:00 17:00:00 1 10 1 10 1 10 1 10 1 0 10 1 0 10 1 10 1 0 10 1 10 1 0 10 1 10 1 10 1 2 10 1 10 1 0 4 1 10 2 10 10 1 3 2 2 8 1 10 1 1 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck Jim Douglas Operator 5 to 7 ton roller Cat mini sweeper Tim Operator Anthony L Labor Sierra Way Track Excavaror Chorro George Operator Cole trucking AC Water Truck Rental Installing main line on Sierra < 7:00 am Contarctor is working on installing FH on sierra way and 42" SD on Sierra way S. Contractor also has a crew on Chorro working on raising concrete collar on Pismo. 1 pm Met with Gas Co. Ry on Ella to talk about relocating 2' gas line. Gas Co. will be on site Monday to relocate 2" gas on Ella. 3:00 pm Contractor is placing concrete at Chorro and trust block on FH and collar on 42" SD at the S. Met with Garrett and Bryce regarding SD manhole at S on Sierra way. 5:00 PM Contractor installed 15' of 42" SD.