Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 10-15-18 1 1 10/15/2018 07:00:00 17:00:00 1 8 1 8 1 8 1 8 1 8 1 1 1 8 1 8 1 8 1 8 1 8 1 2 1 1 8 1 8 2 8 1 0 2 2 0 1 8 1 1 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck Jim Douglas Operator 5 to 7 ton roller Cat mini sweeper Tim Operator Anthony L Labor Sierra Way Track Excavaror Chorro George Operator Cole trucking AC Water Truck Rental Installing main line on Sierra < 7:00 am Contarctor is working on Ella tie-in with Gas Co. lowering existing 2" gas main. Crew is also installing FH on Sierra Way & Bishop. 9:00 am water crew is on site shutting down existing 6" so contractor can cap line to install storm drain at S turn on Sierra way. 12:00 pm water is back on all work is completed contractor will spend the resty of the day cleaning up and laying out trench from Ella to S turn on Sierra Way. 3:00 pm crew left site