Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 10-24-18 1 1 10/24/2018 07:00:00 17:00:00 1 8 1 10.5 1 8 1 8 1 8 1 8 1 8 1 10.5 1 8 1 8 1 8 1 1 8 1 2 1 8 1 8 1 8 2 8 1 0 2 2 1 8 1 1 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck Jim Douglas Operator 5 to 7 ton roller Cat mini sweeper Tim Operator Anthony L Labor Sierra Way Track Excavaror George Operator Cole trucking AC Water Truck Rental Installing main line on Sierra < Bryce Mason 7:00 am Contarctor is working on installing 10" watermain on Sierra Way and 42" SD. 11:00 am Contractor placed concrete collar on SD and thrust blocks on 10 " Hy and Manny are on site checking SD tie-in at 2050 Sierra Way. Owner was on site and meet with myself, Manny and Hy. We explained to property owner about the condition of the pipe. Owner informed us he cut the top of the SD pipe to compensate for the grades of his driveway. Please see note to file. Bac tee sample came back clear contractor started testing new main from Ella to S turn. 2:00 pm Jerry and Ryan are on site loading water main at Bishop to S turn. 5:30 pm Completed testing main.