HomeMy WebLinkAboutDaily -91436 Waterline 12-11-18
1
1
12/11/2018
07:00:00
15:30:00
1
0
1
8
1
4
4
1
8
1
8
1
0
8
1
8
1
8
1
0
1
0
8
1
8
1
8
1
8
1
8
1
8
1
5
8
1
1
2
1
2
1
8
8
1
8
1
8
8
2
0
1
0
1
1
0
1
8
1
1
0
8
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Start
Stop
Diary:
Signature:
Title: Engineer Inspector
Materials:
Weather: Dry/Clear </
Date
Curley Labor
James Y Foremen
James D Labor
Jano Y Labor
Manuel B Labor
JD -50 MINI EX
350SG BACKHOE
BOBTAIL
CREW TRUCKS
CONCRETE SAW
Specification 91436
D-Kal Engineering
Jose Labor
Jake Labor
10 wheeler Dump Truck
5 to 7 ton roller
Cat mini sweeper
Anthony L Labor
Sierra
Track Excavaror
George Operator
Cole trucking
AC
Water Truck
Rental
Bryce Mason
Ronny Operator
Mason
Phil Mason
Earth Systems
on site 10:30 am
way
Todd Labor
Trench Paving
Boysen
Clayton Operator
Golding saw cutting
7:00 am Contractor is paving trench on Sierra Way. Jame informed me D-Kal plans to pave trenches all the way up instead of leaving AC down 2" to overlay. Contractor is potholing and
laying out on Boysen and saw cutting
10:00 am I approved trench layout starting at Boysen for saw cutting.