12/26/2018
07:00:00
15:30:00
1
8
1
0
1
0
1
8
1
8
1
8
1
8
1
8
1
1
0
1
8
1
8
1
8
1
1
8
1
8
1
1
1
0
2
8
1
8
1
8
1
8
2
8
1
3
1
1
4
1
8
1
1
8
8
EQUIPMENT AND/OR LABOR:
HOURS – ITEM No.
Equip.
No.
Idle
Remarks
(Reason for idleness or other remarks)
Description (Of Equipment or Labor)</
Report No.
Page
of
M
T
W
F
S
Circle Day
Shift Hours -
RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Start
Stop
Diary:
Signature:
Title: Engineer Inspector
Materials:
Weather: Dry/Clear </
Date
Curley Labor
James Y Foremen
James D Labor
Jano Y Labor
Manuel B Labor
JD -50 MINI EX
350SG BACKHOE
BOBTAIL
CREW TRUCKS
CONCRETE SAW
Specification 91436
D-Kal Engineering
Jose Labor
Jake Labor
10 wheeler Dump Truck
5 to 7 ton roller
Cat mini sweeper
Anthony L Labor
Sierra
Track Excavaror
George Operator
Cole trucking
AC
Water Truck
Rental
Bryce Mason
Ronny Operator
Phil Mason
Earth Systems
on site 10:30 am
way
Todd Labor
Boysen
Clayton Operator
Golding saw cutting
Boysen & Chorro main lining
iran Nieves Flagger
7:00 am Contractor is potholing existing utilities today on Boysen and HWY 1.
1:00 AM After reviewing the the pothole on Santa Rosa with Marcus Hendersons approval contractor will tie into the existing T. and abandon the existing 8" with a MJ plug. Contractor
requested loading the line on Boysen on Friday.
3:30 pm Contractor cleaning up for the day.