Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 12-26-18 1 1 12/26/2018 07:00:00 15:30:00 1 8 1 0 1 0 1 8 1 8 1 8 1 8 1 8 1 1 0 1 8 1 8 1 8 1 1 8 1 8 1 1 1 0 2 8 1 8 1 8 1 8 2 8 1 3 1 1 4 1 8 1 1 8 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck 5 to 7 ton roller Cat mini sweeper Anthony L Labor Sierra Track Excavaror George Operator Cole trucking AC Water Truck Rental Bryce Mason Ronny Operator Phil Mason Earth Systems on site 10:30 am way Todd Labor Boysen Clayton Operator Golding saw cutting Boysen & Chorro main lining iran Nieves Flagger 7:00 am Contractor is potholing existing utilities today on Boysen and HWY 1. 1:00 AM After reviewing the the pothole on Santa Rosa with Marcus Hendersons approval contractor will tie into the existing T. and abandon the existing 8" with a MJ plug. Contractor requested loading the line on Boysen on Friday. 3:30 pm Contractor cleaning up for the day.