HomeMy WebLinkAboutDaily -91436 Waterline 12-27-18 1 1 12/27/2018 07:00:00 15:30:00 1 8 1 8 1 0 1 8 1 8 1 8 2 8 1 8 1 1 0 1 8 1 8 1 8 1 1 8 1 8 1 1 1 8 2 8 1 8 1 8 1 8 2 8 1 0 1 1 8 1 8 1 1 8 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck 5 to 7 ton roller Cat mini sweeper Anthony L Labor Sierra Track Excavaror George Operator Cole trucking AC Water Truck Rental Bryce Mason Ronny Operator Phil Mason Earth Systems on site 10:30 am way Todd Labor Boysen Clayton Operator Golding saw cutting Boysen & Chorro main lining iran Nieves Flagger 7:00 am Contractor is installing waterline today on Boysen and HWY 1. 9:00 am Marcus is on site checking sampling station due to no detail for new station. 3:00 pm Contractor damaged sewer laterat to dentist office at 225 Boysen . Contractor requsted to work in Cal Trans right of way tomorrow but couldn't due to not on Cal Trans Traffic schedule. I went to Cal Trans permit office and picked up City portion of double permit. I informed Cal Trans if the contractor decides to perform that work D-Kal will need to allow right and left turns off HW1 to remain open or wait to get on traffic schedule. 4:00 pm James D-Kal decided to clean up from todays work and maybe install 60' to get passed D/W at 225 Boysen due to they only have one D/W. Contractor installed 200' of new waterline as of 4:00 pm. 5:30 pm Got all cars out of 225 Boysen which allowed contractor to continue trenching to HWY 1. 7:00 PM CONTRACTOR HIT AND DAMAGED EXISTING UNMARKERED storm drain. contractor also hit a fiber line didn't break cable but creesed conduit. I informed contractor to inform cable owner of damage and to inform them the line was unmarked. 10:00 pm contractor moving off site completed installing pipe to HWY 1 WITH BLOW OFF