Loading...
HomeMy WebLinkAboutDaily -91436 Waterline 12-28-18 1 1 12/28/2018 07:00:00 15:30:00 1 8 1 8 1 0 1 0 1 8 1 8 1 8 1 8 1 8 1 1 0 1 8 1 8 1 8 1 1 8 1 8 1 1 1 8 2 8 1 8 1 8 1 8 4 8 1 0 1 1 8 1 8 1 1 8 8 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Jose Labor Jake Labor 10 wheeler Dump Truck 5 to 7 ton roller Cat mini sweeper Anthony L Labor Sierra Track Excavaror George Operator Cole trucking AC Water Truck Rental Bryce Mason Ronny Operator Phil Mason Earth Systems on site 10:30 am way Todd Labor Boysen Clayton Operator Golding saw cutting Boysen & Chorro main lining iran Nieves Flagger Luis Labor 7:00 am Contractor is installing fire hydrants laterals today on Boysen. 1:00 pm Contractor is placing thrust blocks on FH laterals & fittings. Contractor wanted to load line today however trusth blocks are not cured for loading. I call Marcus and we agreed to load line Monday morning at 8:00 am. I informed James of the schedule and he agreed to Monday. 2:30 pm Contractor is still installing FH lateral infront of 220 Boysen.