RESIDENT ENGINEER'S DAILY INSPECTION REPORT
Men
LOCATION AND DESCRIPTION OF OPERATION:
Start
Stop
Diary:
Signature:
Title: Engineer Inspector
Materials:
Weather: Dry/Clear </
Date
Curley Labor
James Y Foremen
James D Labor
John M Operator
Jano Y Labor
Manuel B Labor
JD -50 MINI EX
350SG BACKHOE
BOBTAIL
CREW TRUCKS
CONCRETE SAW
Specification 91436
D-Kal Engineering
Chorro street
pot
hottap
Labor</t></si></sst>
7:00 AM Contractor is on site working on lay out for saw cutting and potholing Pacific.
11:00 am Loaded pipe and bell restraints for D-Kal Engineering. 18- 8"-20' sticks of pipe 2-6" 20' of pipe and 15 bell restriants.
1:30 pm Contractor hot tapped Pismo all work was in compliance. Hy was on site durning operation with Casey from water.
Crew worked late installed 25' of pipe off the street at 5:00 pm.