Loading...
HomeMy WebLinkAboutDaily - 91436 Waterline 9-18-18 1 1 9/18/2018 07:00:00 15:00:00 1 9 1 9 1 9 1 9 1 9 1 9 9 1 9 1 9 2 9 2 9 1 4 EQUIPMENT AND/OR LABOR: HOURS – ITEM No. Equip. No. Idle Remarks (Reason for idleness or other remarks) Description (Of Equipment or Labor)</ Report No. Page of M T W F S Circle Day Shift Hours - RESIDENT ENGINEER'S DAILY INSPECTION REPORT Men LOCATION AND DESCRIPTION OF OPERATION: Start Stop Diary: Signature: Title: Engineer Inspector Materials: Weather: Dry/Clear </ Date Curley Labor James Y Foremen James D Labor John M Operator Jano Y Labor Manuel B Labor JD -50 MINI EX 350SG BACKHOE BOBTAIL CREW TRUCKS CONCRETE SAW Specification 91436 D-Kal Engineering Chorro street pot hottap Labor</t></si></sst> 7:00 AM Contractor is on site working on lay out for saw cutting and potholing Pacific. 11:00 am Loaded pipe and bell restraints for D-Kal Engineering. 18- 8"-20' sticks of pipe 2-6" 20' of pipe and 15 bell restriants. 1:30 pm Contractor hot tapped Pismo all work was in compliance. Hy was on site durning operation with Casey from water. Crew worked late installed 25' of pipe off the street at 5:00 pm.