Loading...
HomeMy WebLinkAboutItem 07 - Advertisement of Disinfection Byproduct Reduction & WTP Pipe Gallery Impv. Project Department Name: Utilities Cost Center: 6001 For Agenda of: October 22, 2019 Placement: Consent Estimated Time: N/A FROM: Aaron Floyd, Utilities Director Prepared By: Mychal Boerman, Deputy Director Utilities/Water Jennifer Metz, Utilities Project Manager SUBJECT: AUTHORIZE ADVERTISEMENT OF DISINFECTION BYPRODUCT REDUCTION AND WATER TREATMENT PLANT PIPE GALLERY IMPROVEMENTS PROJECT, SPECIFICATION NO. 1000044 RECOMMENDATION 1. Approve the plans and specifications for the Disinfection Byproduct Reduction and Water Treatment Plant Pipe Gallery Improvements Project, Specification No. 1000044; and 2. Authorize staff to advertise the Project for bids; and 3. Authorize the City Manager to award the construction contract for the Project if the lowest responsible bid is within available project funding; and 4. Adopt a Resolution authorizing a budget transfer of $1,042,174, from Water Fund, Unreserved Working Capital account to the Project account. DISCUSSION Disinfection Byproduct Reduction The City’s Water Treatment Plant (WTP) meets the community’s daily water demands using a combination of surface water sources that include Whale Rock, Salinas (Santa Margarita Lake), and Nacimiento Reservoirs. Following the initial treatment processes, chlorine is added to the water before distribution to the community to prevent any harmful microbial regrowth from occurring. Water systems that use chlorine for this type of disinfection are required by federal and state law to sample for disinfection byproducts on a regular basis at spe cific locations. Total Trihalomethanes (TTHMs) are a group of substances known as disinfection byproducts which form when chlorine reacts with naturally occurring organic material in water. The highest levels of TTHMs typically occur where water age is the greatest, such as in water tanks with poor mixing. United States Environmental Protection Agency (EPA) regulatory requirements for maximum TTHM contaminant levels became more stringent in 2013 due to elevated concerns that there may be associated health risks with prolonged ingestion. Following the more stringent EPA regulations, the City’s water sample results for the 2nd quarter of 2015 showed TTHMs at levels of 82.1 parts per billion (ppb) which was above the maximum contaminant level (MCL) of 80 ppb. When routine monitoring indicated that TTHM levels were above regulatory standards, the City issued a notice to customers to keep them informed about water quality. Since that time, WTP staff has been blending water from the various surface water reservoirs to reduce naturally occurring organics and to optimize treatment performance along with making operational adjustments to reduce water age within the City’s Packet Page 67 Item 7 water distribution system to minimize TTHM formation. WTP staff also pilot tested different chemicals aimed at reducing TTHM levels without success. The City’s Water Distribution staff also implemented a flushing program to help move the aging water throughout the system. Over the last few years, the City’s third quarter (late summer) TTHM readings are nearing the MCL exceedance levels. This upward trend in TTHMs is exacerbated by the warmer water temperatures in the source water supplies during summer, water conservation which results in longer contact time with chlorine, and the City’s water resiliency supply strategy that requires using minimal water from Whale Rock Reservoir, even though it is the lowest in organic material. In order to permanently address the issue of high TTHMs, mixing, aeration, and ventilation equipment is needed at two of the City’s water storage tanks. Water Treatment Plant Pipe Gallery The City’s existing WTP was constructed at its current Stenner Canyon location in 1963, with major facility upgrades in 1994 and 2009. Upon inspection in early 2019, staff identified portions of the WTP pipe gallery (installed as part of the 1994 upgrade) that exhibited severe corrosion. Specifically, a section of the 30‐inch filter effluent line that delivers treated water to the clearwell tanks where it is stored prior to entering the water distribution system. At this location, chemical treatment is required for fluoride and chlorine addition and pH adjustment. It is assumed that this chemical addition, combined with the presence of standing groundwater, contributed to the severe corrosion of the pipe. Due to the high consequence of failure of the pipeline, staff is recommending the urgent replacement of the corroded piping. Project To enable the City to maintain regulatory compliance related to disinfection byproduct levels and address the corrosion issues at the pipe gallery, staff is recommending the City Council approve the Disinfection Byproduct Reduction (DBR) and WTP Pipe Gallery Improvements Project (Project) and authorize advertisement of the project. The Project includes two components: WTP pipe gallery improvements and disinfection byproduct reduction equipment installation at the WTP (Clearwell 2) and at Edna Saddle Tank. The City completed plans (Attachment A) and specifications (Attachment B) for the Project and recommends the City Council authorize advertisement of the project for construction. Combining the two components allows the City to achieve construction efficiencies to expedite project completion and minimizes the duration of construction impacts on WTP operations. The Project includes modifications at two potable water storage tanks (Clearwell #2 at the WTP and Edna Saddle Tank) for the installation of specialty equipment (mixers, aerators, and ventilators) to effectively reduce disinfection byproducts to meet regulatory requirements. As part of the approval on March 19, 2019, Council authorized the inclusion of the sole-sourced equipment in the Project’s bid documents (PAX Trihalomethane Reduction System by PSI Water Technologies). Stenner Canyon Water Treatment Plant, Clearwell #2. Packet Page 68 Item 7 The Project also includes replacement of corroded pipe within the pipe gallery at the WTP, installation of a new effluent line and additional valving to provide a means for improved maintenance flexibility within the pipe gallery, and the abandonment of a portion of the existing buried 30-inch pipeline. This construction will be complex as the existing WTP must continue to operate and serve the community’s water needs, allowing only short duration shutdowns to not interrupt water service. The project requires significant excavation work to enable the new pipeline installation, and space is limited. The Project contingency for construction, construction management, and inspection services is budgeted at 25 percent due to the complexity of the proposed pipe gallery improvements and consequence of failure. Construction management and inspection services will be provided by consultants from the City’s on-call service contracts, Capital Plan Construction Management Services, Specification No. 50410.2018CM and Water and Wastewater Engineering Services, Specification No. 91537. Policy Context The U.S. Environmental Protection Agency and the State Water Resources Control Board prescribe regulations that limit certain contaminants in water provided by public water systems, including disinfection byproducts, specifically total trihalomethanes, or TTHMs. Consistent with the General Plan, Water and Wastewater Management Element, Policy A2.2.1, the City utilizes multiple water resources to meet its water supply needs. Operationally, this means the City uses a blend of water sources to meet the community’s water needs – from Salinas, Whale Rock, and Nacimiento Reservoirs. Previous Council Action On March 19, 2019, the City Council approved the budget for the Water Treatment Plant and Water Distribution System DBR project (Attachment C). The City Manager approved an amendment to the design scope of the Project on July 8, 2019 to include improvements to the WTP pipe gallery in response to severe pipe corrosion and the high consequence of failure that could occur from a leak in this pipeline (Attachment D). The City’s 2015 Potable Water Distribution System Operations Master Plan was approved by the City Council in 2016. The Master Plan discussed the challenges in meeting Stage 2 disinfection byproducts water quality regulations associated with tank turnover and water age that this Project will address. The Master Plan is available on the Utilities Department’s website at https://www.slocity.org/home/showdocument?id=6439. Public Engagement The City posts its Water Quality Consumer Confidence Report (Water Quality Report) annually on the City’s webpage and mails a printed copy to all customers. Public water systems are required by state and federal law to notify users of any exceedance of any water quality standard and any other noncompliance events affecting their water system. In 2015, when a violation occurred, the City sent out a Public Notice of Violation. The City has not had a violation since the occurrence in 2015. Packet Page 69 Item 7 CONCURRENCES Utilities and Public Works Department staff (City Engineer and Construction Manager) met to review delivery options for the Project. Public Works staff concurs with this request. ENVIRONMENTAL REVIEW This project is exempt from the California Environmental Quality Act (CEQA) per categorical exemption 15301(b), Existing Facilities. The Community Development Department issued a Notice of Exemption on September 9, 2019 (Attachment E). FISCAL IMPACT Budgeted: No Budget Year: 2019-20 Funding Identified: Yes The DBR improvements were described in the 2019-21 Financial Plan, Capital Improvement Program, on page 397, with a total project budget of $1,850,000. The severity of the corrosion at the WTP pipe gallery was unknown at the time projects were prioritized for the Capital Improvement Program. Of the available budget for the Project, $217,924 was expended for design services, and $1,632,076 is remaining for construction, contingencies, and construction management/inspection services. Contingencies are included at 25 percent of the construction and construction management/inspection budget to address potential changes in scope that may arise during construction. This is a higher rate of contingency to typical pipeline replacement capital projects due to the complexity of the pipe gallery construction within the WTP. The construction cost estimate for the project is $1,842,000, including the shop drawing cost from PSI Water Technologies. Other project costs are outlined in the table below for a total project cost of $2,674,250. As described in the Resolution (Attachment F), a budget transfer of $1,042,174 is proposed from Water Fund, Unreserved Working Capital which is approximately $20 million (unaudited financials). Since sufficient unreserved working capital is available to support this project, staff does not recommend modifications to the approved 2019-21 capital project program. Packet Page 70 Item 7 Disinfection Byproduct Reduction and Water Treatment Plant Pipe Gallery Improvements Project (Specification #1000044) Estimated Costs Construction Cost Estimate $1,817,000 Construction Management (CM)/Inspection $250,000 Specialized Coatings Inspection $20,000 Engineering Construction Phase Support $40,000 Shop Drawings $25,000 Materials Testing and Printing $5,500 Construction and CM/Inspection Contingency (25%) $516,750 Total Project Cost1 $2,674,250 Project Funding Total Funding Available $1,632,076 Funding from Water Fund, Unreserved Working Capital $1,042,174 Available Project Funding $2,674,250 Fiscal Analysis: Funding Sources Current FY Cost Annualized On-going Cost Total Project Cost General Fund State Federal Fees Other: Water Fund $2,674,250 $130,000 $2,804,250 Total $2,804,250 Ongoing annual costs are estimated at $130,000 for the operation of the DBR equipment. Funding for the Project’s on-going operational costs was approved as part of the 2019-2021 Financial Plan in the WTP operating budget. ALTERNATIVES Deny or defer approval to advertise. The City Council may choose to deny or defer the approval to advertise this project. Staff does not recommend this alternative as the City is required to remain in regulatory compliance of the Disinfection Byproduct Rule. Should this be denied or deferred, the existing WTP pipe gallery pipeline will also continue to deteriorate, increasing the likelihood of failure. 1 Excludes operating costs. Packet Page 71 Item 7 Attachments: a - READING FILE - TTHM Pipe Gallery Plans b - READING FILE - Project Specifications c - March 19, 2019 Council Agenda Report d - Amendment to Design Scope for MKN Design Services Contract e - Signed Notice of Exemption f - Draft Resolution Packet Page 72 Item 7 Department Name: Utilities Cost Center: 6001 For Agenda of: March 19, 2019 Placement: Consent Estimated Time: N/A FROM: Aaron Floyd, Interim Utilities Director Prepared By: Jennifer Metz, Utilities Projects Manager Jason Meeks, Water Treatment Plant Supervisor SUBJECT: WATER TREATMENT PLANT AND WATER DISTRIBUTION SYSTEM DISINFECTION BYPRODUCT REDUCTION PROJECT AND SOLE SOURCE EQUIPMENT AUTHORIZATION RECOMMENDATION 1. Authorize an engineering design services budget of up to $200,000 for the Water Tre atment Plant and Water Distribution System Disinfection Byproduct Reduction Project; and 2. Authorize the inclusion of the sole-sourced equipment in construction/bid documents for the Water Treatment Plant and Water Distribution System Disinfection Byproduct Reduction Project; and 3. Authorize a budget of $1,650,000 for equipment, construction, and construction management services for the Water Treatment Plant and Water Distribution System Disinfection Byproduct Reduction Project. DISCUSSION Overview of How the City Provides Water to the Community The City’s Water Treatment Plant (WTP) meets the community’s daily water demands using a combination of surface water sources that include Whale Rock, Salinas (Santa Margarita Lake), and Nacimiento Reservoirs. Following the initial treatment processes, chlorine is added to the water before distribution to the community to prevent any harmful microbial regrowth from occurring. Water systems that use chlorine for this type of disinfection are required by federal and state law to sample for disinfection byproducts on a regular basis at specific locations. Total Trihalomethanes (TTHMs) are a group of substances known as disinfection byproducts which form when chlorine reacts with naturally occurring organic material in surface waters. The highest levels of TTHMs typically occur where water age is the greatest, such as in water tanks with poor mixing. United States Environmental Protection Agency (U.S. EPA) regulatory requirements for maximum TTHM contaminant levels became more stringent in 2013 due to elevated concerns that there may be associated health risks with prolonged ingestion.  The United States Environmental Protection Agency has estimated that public water systems will need to spend over $4 billion (in 2011 dollars) to upgrade their water treatment infrastructures and achieve compliance with the Stage 2 Disinfection Byproducts Rule.  Packet Page 73 Item 7 How the City Addresses TTHM Levels The City’s water sample results for the 2nd quarter of 2015 showed TTHMs at levels of 82.1 parts per billion (ppb) which was above the standard or maximum contaminant level (MCL) of 80 ppb. When routine monitoring indicated that TTHM levels were above regulatory standards, the City issued a notice to customers to keep them informed about water quality. Since that time, WTP staff has been blending water from the various surface water reservoirs to optimize treatment performance along with making operational adjustments to reduce water age within the City’s Water Distribution System to minimize TTHM formation. WTP staff also pilot tested different chemicals aimed at reducing TTHM levels without success. The City’s Water Distribution staff implemented a flushing program to help move the aging water throughout the system. Over the last few years, the City’s third quarter (late summer) TTHM readings are nearing the MCL exceedance levels. This upward trend in TTHMs is exacerbated by the warmer water temperatures in the source water supplies during summer, water conservation, and the City’s water resiliency supply strategy that requires using minimal water from Whale Rock Reservoir, even though it is the lowest in organic material. Design and Construction Project to Continue to Meet TTHM Regulatory Compliance To enable the City to reliably remain in regulatory complia nce, staff is recommending the City Council authorize a design services and construction budget for the Water Treatment Plant and Water Distribution System Disinfection Byproduct Reduction Project (Project). Staff has identified two locations (Clearwell #2 at the WTP and Edna Saddle Tank on the southern side of the City) for TTHM reduction and has identified the available technology to effectively reduce TTHMs to meet regulatory requirements. The technology and equipment, PAX Trihalomethane Reduction System by PSI Water Technologies, Inc., includes three components that together will achieve a TTHM removal rate that would allow the City to remain in regulatory compliance. The system is a custom-designed, energy-optimized combination of mixers, aerators, and ventilators to reduce TTHMs. Staff has also identified a strategy of modifications and maintenance items at Edna Saddle Tank and Pump Station to achieve greater mixing while moving water in and out of the tank, improve overall water quality, provide greater monitoring control, and provide system redundancy which would be confirmed through project design and funded through project construction. Because design of the project is dependent on the type of technology used to treat TTHMs, WTP staff propose use the City’s sole source purchasing authority, per Municipal Code 3.24.060.D, to specify the purchase the PAX Trihalomethane Reduction System. The detailed sole-source justification for this equipment was submitted to the City’s Purchasing Analyst for critical review (Attachment A), who determined the sole source request conforms with City policies. Sole source authorization is necessary so the specific equipment may be incorporated in the Project’s design and ultimately into the construction/bid documents. If an unanticipated design change should occur between now and completion of the documents that would allow for competitive bidding on any applicable equipment, that equipment will be removed from the sole source list and competitively bid. Packet Page 74 Item 7 With Council’s budget authorization, staff will contract with an on-call Water and Wastewater design engineer for the design of the Project. It is anticipated that construction will proceed during the 2019-20 fiscal year. Previous Council or Advisory Body Actions The City’s 2015 Potable Water Distribution System Operations Master Plan was approved by the City Council in 2016. The Master Plan discussed the challenges in meeting Stage 2 disinfection byproducts water quality regulations associated with tank turnover and water age that this Project will address. The Master Plan is available on the City’s website at: https://www.slocity.org/home/showdocument?id=6439 Policy Context To ensure that water is safe to drink, the U.S. EPA and the State Water Resources Control Board prescribe regulations that limit certain contaminants in water provided by public water systems, including TTHMs. Consistent with General Plan, Water and Wastewater Management Element, Policy A2.2.1, the City utilizes multiple water resources to meet its water supply needs. Operationally, this means the City uses a blend of water sources to meet the community’s water needs – from Salinas, Whale Rock, and Nacimiento Reservoirs. Public Outreach The City posts its Water Quality Consumer Confidence Report annually on the City’s webpage. Public water systems are required by state and federal law to notify users of any exceedance of any water quality standard and any other noncompliance events affecting their water system. In 2015, when a violation occurred, the City sent out a Public Notice of Violation. The City has not had a violation since the occurrence in 2015. CONCURRENCES The Public Works Department concurs with this recommendation. ENVIRONMENTAL REVIEW The recommended action to authorize the budget for the Project is not a "project" under the California Environmental Quality Act (CEQA), because the action does not involve any commitment to a specific project which may result in a potentially significant physical impact on the environment, as contemplated by Title 14, California Code of Regulations, Section 15378. Once project design is underway the City will evaluate the project for potentially significant environmental impacts per CEQA. Packet Page 75 Item 7 FISCAL IMPACT Budgeted: No Budget Year: N/A Funding Identified: Yes Fiscal Analysis: Funding Sources Current FY Cost Annualized On-going Cost Total Project Cost General Fund State Federal Fees Other: Water Fund $200,000 (project design services only) $120,000 $1,850,000 Total $1,850,000 Funding for the Project was not identified in the 2017-19 Financial Plan. However, due to water quality sample results indicating elevated TTHM levels at Clearwell #2 and Edna Saddle, staff is requesting City Council authorization to establish a budget of $200,000 for project design services. Adequate funding is available in the Water Fund Completed Projects Account which has a current balance of $253,000. Staff is also requesting funding for equipment, construction, and construction management totaling $1,650,000 services in FY 2019-20 so the project will be able to move to construction in the next fiscal year for a total project cost of $1,850,000. Approximately $1.325 million is available within the Water Fund for this project. Two WTP maintenance projects totaling $325,000 are proposed to be delayed and incorporated in the 2019- 21 Financial Plan appropriation in order to accommodate the Project’s construction. Following Project construction, staff is estimating an on-going operational cost of $100,000 annually for electrical consumption and $20,000 annually for to service of the new equipment. These operational costs would appear in the Water Fund’s annual budget request. ALTERNATIVES 1. No Project. The City Council may elect to not authorize the engineering design services and construction of budget for the project. Staff does not recommend this alternative as the City is required to remain in regulatory compliance of the Disinfection By product Rule and staff anticipates being unable to do so in the future without these improvements . 2. No Sole Source. The City Council may elect not to authorize the technology and equipment be placed in the construction/bid documents. Staff does not recommend this alternative for the reasons outlined on the sole source justification form. Attachments: a -Sole Source Justification PSi Water Tech Packet Page 76 Item 7 City of San Luis Obispo, City Manager Report Final City Manager Approval Approver Name Date Approved Assistant City Manager Shelly 7/8/19 Reviewer Routing List Reviewer Name Date Reviewed City Attorney CB 6/26/19 City Engineer MH 6/26/19 Finance BE 7/2/19 June 19, 2019 FROM: Aaron Floyd, Utilities Director AF 6/20/19 PREPARED BY: Jennifer Metz, Utilities Projects Manager SUBJECT: Disinfection Byproduct Reduction Project - Design Services Contract Amendment RECOMMENDATION Approve a contract amendment with Michael K. Nunley and Associates (MKN) totaling $52,902 for the Disinfection Byproduct Reduction (DBR) project to include design services for Pipe Gallery Improvements. DISCUSSION The City’s existing Water Treatment Plant (WTP) was constructed in 1963. Portions of the WTP have remained in uninterrupted service since that time. Upon recent inspection, staff identified portions of the WTP pipe gallery that exhibit severe corrosion. Of primary concern is a portion of the 30‐inch filter effluent line where the pipe transitions below grade at the south side of the WTP pipe gallery. At this location, chemical treatment is required for fluoride addition and pH adjustment. It is assumed that the chemical addition, combined with the presence of standing groundwater, contributed to the severe corrosion on the external surfaces of the pipe. Due to the high consequence of failure of the pipeline, staff is recommending the repair or replacement of the corroded piping be prioritized. In March 2019, the City Council approved the budget for the DBR project, with $200,000 for the design phase during FY 2018-19 and $1,500,000 for the construction phase during 2019-20. In May, the City entered into a contract with MKN for the design of the Project for $165,022. It is anticipated that construction of the DBR project will proceed during the 2019-20 fiscal year. Sole Source Justification Staff is recommending an amendment to the existing contract with MKN to include the design services for the Pipe Gallery Improvements for an additional cost of $52,902 as the most cost effective and time efficient approach due to the relationship between the two projects. . Packet Page 77 Item 7 Disinfection Byproduct Reduction Project – Design Services Scope Amendment Page 2 The preliminary estimate of construction cost for the Pipe Gallery Improvements is $750,000, assuming replacement is required. More cost information will become available through the design phase. A source for construction funding will be identified for City Council consideration prior to the project’s advertisement for construction. The DBR project work is proximate to the needed improvements to the pipe gallery within the WTP. Staff anticipates design, construction, and construction management efficiencies by completing this work as one project. If approved, City staff would work with MKN during the design phase to develop a construction sequencing plan to minimize disruption to the WTP while the pipe gallery improvements are made. CONCURRENCES The Public Works Department concurs with the recommendation in this report. ENVIRONMENTAL REVIEW The recommended action to authorize the budget for the Project is not a "project" under the California Environmental Quality Act (CEQA), because the action does not involve any commitment to a specific project which may result in a potentially significant physical impact on the environment, as contemplated by Title 14, California Code of Regulations, Section 15378. FISCAL IMPACT There is $34,978 from the DBR project design budget remaining. Staff is proposing the use of this funding and $17,924 from the construction phase (available July 1, 2019) be used to support this request. MKN’s proposal is included in Attachment A. Fiscal Impact Summary Item FY 2018-19 FY 2019-20 Disinfection Byproduct Project Reduction Budget (#1000044) $ 200,000 $ 1,500,000 PO #602284 with MKN $ 165,022 -$ Proposed Contract Amendment 34,978$ 17,924$ Remaining Project Budget -$ 1,482,076$ ALTERNATIVE The City Manager may elect to not authorize the engineering design services and construction of budget for the project. Staff does not recommend this alternative due to the severe corrosion identified and the high consequence of failure. ATTACHMENT A – Proposal from Michael K. Nunley & Associates, Inc. Packet Page 78 Item 7 Disinfection Byproduct Reduction Project – Design Services Scope Amendment Page 3 Packet Page 79 Item 7 Packet Page 80 Item 7 R ______ RESOLUTION NO. _____ (2019 SERIES) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, AUTHORIZING USE OF WATER FUND UNRESERVED WORKING CAPITAL FOR CONSTRUCTION OF THE DISINFECTION BYPRODUCT REDUCTION AND WATER TREATMENT PLANT PIPE GALLERY IMPROVEMENTS PROJECT, SPECIFICATION NO. 1000044 WHEREAS, to ensure that water is safe to drink, the U.S. Environmental Protection Agency and the State Water Resources Control Board prescribe regulations that limit certain contaminants in water provided by public water systems, including total trihalomethanes, or TTHMs; and WHEREAS, the City’s 2015 Potable Water Distribution System Operations Master Plan was approved by the City Council in 2016. The Master Plan discussed the challenges in meeting Stage 2 disinfection byproducts water quality regulations associated with tank turnover and water age; and WHEREAS, on March 19, 2019, the City Council approved a budget of $1,850,000 for the Water Treatment Plant (WTP) and Water Distribution System Disinfection Byproduct Reduction Project (Project); and WHEREAS, in June 2019, the City Council approved 2019-21 Financial Plan, Capital Improvement Program, identified a total Project budget of $1,850,000; and WHEREAS, on July 8, 2019, the City Manager approved an amendment to the design scope of the Project to include improvements to the WTP pipe gallery in response to severe pipe corrosion and the high consequence of failure; and WHEREAS, the total available budget for the Project is $1,632,076 and the total Project cost is estimated at $2,674,250 requiring an additional $1,042,174 to fund Project construction; and WHEREAS, a balance of approximately $20 million (unaudited financials) is available from Water Fund, Unreserved Working Capital to fund the Project. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: SECTION 1. The budget of $1,042,174 will be moved to the Disinfection Byproduct Reduction and Water Treatment Plant Pipe Gallery Improvements Project, Specification No. 1000044, as it is a high priority City project. Packet Page 81 Item 7 Resolution No. _____ (2019 Series) Page 2 R ______ SECTION 2. Environmental Review. Construction of this project is exempt from the California Environmental Quality Act (CEQA) per categorical exemption 15301(b), Existing Facilities. The Community Development Department issued a Notice of Exemption on September 9, 2019 Upon motion of _______________________, seconded by _______________________, and on the following roll call vote: AYES: NOES: ABSENT: The foregoing resolution was adopted this _____ day of _____________________, 2019. ____________________________________ Mayor Heidi Harmon ATTEST: ____________________________________ Teresa Purrington City Clerk APPROVED AS TO FORM: _____________________________________ J. Christine Dietrick City Attorney IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, this _________ day of _____________________, ___________. ____________________________________ Teresa Purrington City Clerk Packet Page 82 Item 7